{{#Wiki_filter:ENCLOSURE 1 PROPOSED TECHNICAL'SPECIFICATION REVISION BROWNS FERRY NUCLEAR PLANT UNITS I, 2, AND 3 (TVA BFN TS 255)88i 0070013 880929 PDR ADO', 05000259 P PNU  
{{#Wiki_filter:ENCLOSURE 1 PROPOSED TECHNICAL'SPECIFICATION REVISION BROWNS FERRY NUCLEAR PLANT UNITS I, 2, AND 3 (TVA BFN TS 255) 88i 0070013 880929 PDR P
~Sectio Pae o C.Coolant Leakage.D.Relief Valves.E.Jet Pumps.F.Recirculation Pump Operation.G.Structural Integrity.H.Snubbers 3.7/4.7 Containment Systems A.Primary Containment.
ADO', 05000259 PNU
B.Standby Gas Treatment System.C.Secondary Containment.
3.6/4.6-9 3.6/4.6-10 3.6/4.6-11 3.6/4.6-12 3.6/4.6-13 3.6/4.6-15 3.7/4.7-1 3.7/4.7-1 3.7/4.7-13 3.7/4.7-17 D.Primary Containment Isolation Valves.....3.7/4.7-18 E.Control Room Emergency Ventilation
......3.7/4.7-19 F.Primary Containment Purge System.G.Containment Atmosphere Dilution System (CAD)3.7/4.7-21 3.7/4.7-22 H.Containment Atmosphere Monitoring (CAM)System H2 Analyzer.3.8/4.8 Radioactive Materials.
A.Liquid Effluents B.Airborne Effluents 3.7/4.7-24 3.8/4.8-1 3.8/4.8-1 3.8/4.8-3 C.Radioactive Effluents-Dose.........3.8/4.8-6 D.Mechanical Vacuum Pump.3.8/4.8-6 E.Miscellaneous Radioactive Materials Sources..3.8/4.8-7.
F.Solid Radwaste.3.9/4.9 Auxiliary Electrical System.3.8/4.8-9 3.9/4.9-1 A.Auxiliary Electrical Equipment........3.9/4.9-1 B.Operation with Inoperable Equipment.
.....3.9/4.9-10 C.Operation in Cold Shutdown..........3.9/4.9-17 3.10/4.10 Core Alterations
.3.10/4.10-1 A.Refueling Interlocks
.............'.10/4.10-1 I 4 PR MARY SYSTE 0 DARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers During all modes of operation, all snubbers shall be OPERABLE except as noted in 3.6.H.l.All safety-related snubbers are listed in Surveillance Instructions BF SI 4.6.H-1 and BF SI 4.6.H-2.1.With one or more snubber(s)
INOPERABLE on a system that is required to be OPERABLE in the current plant condition, within 72 hours replace or restore the INOPERABLE snubber(s) to OPERABLE status and perform an engineering evaluation on the attached component or declare the attached system INOPERABLE and follow the appropriate Limiting Condition statement for that system.Each safety-related snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 3.6.H/4.6.H.
These snubbers are listed in Surveillance Instructions BF SI 4.6.H-l and BF SI 4.6.H-2.1.Ins ection Grou s The snubbers may be categorized into two major groups based on whether the snubbers are accessible or inaccessible during reactor operation.
These major groups may be further subdivided into groups based on design, environment, or other features which may be expected to affect the operability of the snubbers within the group.Each group may be inspected independently in accordance with 4.6.H.2 through 4.6.H.9.2.Visual Ins ection Schedule and Lot Size The first inservice visual inspection of snubbers not previously included.in these technical specifications and whose visual inspection has BFN Unit 1 3.6/4.6-15 I 3.6 4 6 PRIMARY SYSTE OUNDARY\LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.2.(Cont'd)not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming power after the first refueling outage for inaccessible snubbers subsequent to being included in these specifications.
The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.Snubbers previously included in these technical specifications shall continue on their previously earned inspection schedule without affect from adding snubbers not within their group.No.Inoperable
*Subsequent Snubbers per Visual Inspection Inspection Period Period 0 1 2 3,4 5,6,7 8 or more 18 months g 25%12 months g 25%6 months g 25%124 days+25%62 days g 25%31 days g 25%*The inspection interval shall not be lengthened more than one step at a time.BFN Unit 1 3.6/4.6-16 0~r C~4 PRIMARY S STE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 3~Visual Ins ection Performance and Evaluation Visual inspections shall verify (1)that there are no visible indications of damage or impaired OPERABILITY, (2)bolts attaching the snubber to the foundation or supporting structure are secure, and (3)snubbers attached to sections of'afety-related systems that have experienced unexpected potentially damaging transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, if applicable, to confirm OPERABILITY.
Snubbers which appear INOPERABLE as a result of visual inspections may be determined OPERABLE for the purpose of establishing the next visual inspection interval, providing that (1)the cause of the rejection is clearly established and remedied for that particular.
snubber and for other snubbers that may be generically susceptible; and (2)the affected'nubber is functionally tested, if applicable, in the as-found condition and determined OPERABLE per Specification 4.6.H.5.BFN Unit 1 3.6/4.6-17 4 PR MARY SYSTEt OU DAR LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H Snubbers 4.6.H.3 (Cont'd)Also, snubbers which have been made INOPERABLE as the result of unexpected transients, isolated damage, or other such random events, when the provisions of 4.6.H.7 and 4.6.H.S have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.4.Functional Test Schedule Lot Size and Com osition During each refueling outage, a representative sample of 10%of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.The representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the groups.The representative sample should be weighed to include more snubbers from severe service areas such as near heavy equipment.
The stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.BFN Unit 1 3.6/4.6-18 C~4 PRIMARY SYSTEI'ARY'LIMITINQ CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 5.Functiona Test Acce tance Criteria The snubber functional test shall verify that: a.Activation (restraining action)is achieved in both tension and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be tested to verify only that activation takes place in both directions of travel.b.Snubber bleed, or release where required, is present in both compression and tension within the specified range.c~For mechanical snubbers, the force required to initiate or maintain motion of the snubber is not great enough to overstress the attached piping or component during thermal movement, or to indicate impending failure of the snubber.d.For snubbers specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be verified.BFN Unit l 3.6/4.6-19 I 4 PRIMAR SYS EN OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.5 (Cont'd)e.Testing methods may be used to measure parameters indirectly or parameters other than those specified if those results can be correlated to the specified parameters through established methods.6.Functional Test Failure nal sis and Additiona Test Lots An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to determine the cause of the failure.The result of this analysis shall be used, if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.Selection of snubbers for future testing may also be based on the failure analysis.For each snubber that does not meet the functional test acceptance criteria, an additional lot equal to 10 percent of the remainder of that group of snubbers shall be functionally tested.Testing shall continue until no additional inoperable snubbers are found within subsequent lots or all snubbers of the original inspection group have been tested or all suspect snubbers identified by the failure analysis have been tested, as applicable.
BFN Unit 1 3.6/4.6-20 0 F~P 4 PRIMARY SYSTE OUNDAR LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.6 (Cont'd)If any snubber selected for functional testing either fails to lockup or fails to move, i.e., frozen in place, the cause will be evaluated and if caused by manufacturer or design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.This testing requirement shall be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.The discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic.The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners, as applicable.
7.nctional Test Failure-Attached Com onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).
The purpose of this engineering evaluation shall be to determine if the components restrained by the BFN Unit 1 3.6/4.6-21 4 PRIMARY SYSTEl 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.7.(Cont'd)snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.8.Functiona Testin 0 Re aired and S are Snubbers Snubbers which fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced.Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit.These snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.9.Exem tion from Visua Ins ection or Functional Tests Permanent or other exemptions from visual inspections and/or functional testing for individual snubbers may be granted by the Commission if a justifiable basis for exemption is presented and if applicable snubber life destructive testing was performed to qualify snubber operability for the applicable design conditions at either the BFN Unit 1 4 PRIMARY SYSTE 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.9 (Cont'd)completion of their fabrication or at a subsequent date.Snubbers so exempted shall continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.
10.Snubber Service Life Pro ram The service life of snubbers may be extended based on an evaluation of the records of functional tests, maintenance history, and environmental conditions to which the snubbers have been exposed.BFN Unit 1 3.SIS.S-23


3.6/4.6 BASES 5.6.H/4.6.H Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown.The consequence of an inoperable snubber is an increase in the probability of structural damage to piping or components as a result of a seismic or other event initiating dynamic loads.It is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.
~Sectio                                                                Pae    o C. Coolant Leakage.                                          3.6/4.6-9 D. Relief Valves.                                            3.6/4.6-10 E. Jet  Pumps.                                                3.6/4.6-11 F. Recirculation  Pump  Operation    .                     3.6/4.6-12 G. Structural Integrity    .                                3.6/4.6-13 H. Snubbers                                                  3.6/4.6-15 3.7/4.7    Containment Systems                                            3.7/4.7-1 A. Primary Containment.                                      3.7/4.7-1 B. Standby Gas Treatment System .                            3.7/4.7-13 C. Secondary Containment.                                    3.7/4.7-17 D. Primary Containment Isolation Valves          . . . . . 3.7/4.7-18 E. Control  Room Emergency      Ventilation  . . . . . . 3.7/4.7-19 F. Primary Containment Purge System        .                 3.7/4.7-21 G. Containment Atmosphere      Dilution System    (CAD)      3.7/4.7-22 H. Containment Atmosphere Monitoring (CAM)
Because the protection is required only during relatively low probability events, a period of 72 hours is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system.The'engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.To verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.
System H2 Analyzer .                                  3.7/4.7-24 3.8/4.8    Radioactive Materials.                                        3.8/4.8-1 A. Liquid Effluents                                          3.8/4.8-1 B. Airborne Effluents                                        3.8/4.8-3 C. Radioactive Effluents        Dose . . . . . . . . .     3.8/4.8-6 D. Mechanical Vacuum    Pump    .                            3.8/4.8-6 E. Miscellaneous Radioactive Materials Sources.          . 3.8/4.8-7.
These tests will include stroking of the snubbers to verify proper movement, activation, and bleed or release.Ten percent represents an adequate sample for such tests.Observed failures on these samples will require an engineering analysis and testing of additional units.If the engineering analysis results in the determination that the failure of a snubber to activate or to stroke (i.e., seized components) is the result of manufacture or design deficiency, all snubbers subject to the same defect shall be functionally tested.A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests.The stroke setting of the snubbers selected for functional testing also will be verified.All safety-related snubbers are also visually inspected for overall integrity and operability.
F. Solid Radwaste  .                                        3.8/4.8-9 3.9/4.9    Auxiliary Electrical    System.                               3.9/4.9-1 A. Auxiliary Electrical    Equipment    . . . . . . . . 3.9/4.9-1 B. Operation with Inoperable Equipment.        . . . . . 3.9/4.9-10 C. Operation in Cold Shutdown      . . . . . . . . . .      3.9/4.9-17 3.10/4.10 Core Alterations  .                                             3.10/4.10-1 A. Refueling Interlocks    . . . . . . . .    . . . . . '.10/4.10-1
The inspection will include verification of proper orientation, adequate fluid level if applicable, and proper attachment of the snubber to piping and structures.
 
The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.
I 4  PR MARY SYSTE      0  DARY LIMITING CONDITIONS  FOR OPERATION              SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers During  all  modes  of operation,                Each  safety-related snubber all  snubbers shall be OPERABLE                  shall  be demonstrated OPERABLE except as noted in 3.6.H.l.                       by performance    of the following All safety-related snubbers                        augmented  inservice inspection are listed in Surveillance                        program and the requirements Instructions BF SI 4.6.H-1                        of Specification 3.6.H/4.6.H.
BFN Unit 1 3.6/4.6-34
and BF SI 4.6.H-2.                               These snubbers    are listed in Surveillance Instructions
~'.6/4.6 BASES (Con ed)'The visual inspection frequency is based upon maintaining a constant level of snubber protection.
: 1. With one or more                              BF SI 4.6.H-l and BF SI 4.6.H-2.
Thus, the required inspection interval varies inversely with the observed snubber failures.The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection.
snubber(s) INOPERABLE on a system that is required                    1. Ins ection Grou  s to be OPERABLE in the current plant condition,                          The snubbers  may be within  72 hours replace                          categorized into two major or restore the INOPERABLE                          groups based on whether the snubber(s) to OPERABLE                            snubbers are accessible status and perform an                              or inaccessible during engineering evaluation                            reactor operation. These on the attached    component                      major groups may be further or declare the attached                            subdivided into groups system INOPERABLE and                              based on design, follow the appropriate                            environment, or other Limiting Condition statement                      features which may be for that system.                                   expected to affect the operability of the snubbers within the group. Each group may be inspected independently in accordance with 4.6.H.2 through 4.6.H.9.
Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection.
: 2. Visual Ins ection Schedule and Lot Size The  first inservice visual inspection of snubbers not previously included.in these technical specifications and whose visual inspection has BFN                                        3.6/4.6-15 Unit  1
However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent)may not be used to lengthen the required inspection interval.Any inspection whose results require a shorter inspection interval will override the previous schedule.When the cause of the rejection of a snubber in a visual inspection is clearly established and remedied for that snubber and for any other snubbers that may be.generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable,.
 
Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration.
I 3.6\ 4  6 PRIMARY SYSTE  OUNDARY LIMITING CONDITIONS  FOR OPERATION        SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.2. (Cont'd) not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming power after the  first refueling outage for inaccessible snubbers subsequent to being included in these specifications.
Inspection groups may be established based on design features, and installed conditions which may be expected to be generic.Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted.
The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.
All suspect snubbers are subject to inspection and testing regardless of inspection groupings.
Snubbers previously included in these technical specifications shall continue on  their previously earned inspection schedule without affect from adding snubbers not within their group.
BFN Unit 1 3.6/4.6-35 Section C.Coolant Leakage.D.Relief Valves.E.Jet Pumps.~Pa e e 3.6/4.6-9 3.6/4.6-10 3.6/4.6-11 F.Recirculation Pump Operation.........3.6/4.6-12 G.Structural Integrity.H.Snubbers 3.7/4.7 Containment Systems A.Primary Containment.
No. Inoperable    *Subsequent Snubbers per      Visual Inspection        Inspection Period            Period 0              18 months  g 25%
B.Standby Gas Treatment System.C.Secondary Containment.
1              12 months  g 25%
3.6/4.6-13 3.6/4.6-15 3.7/4.7-1 3.7/4.7-1 3.7/4.7-13 3.7/4.7-17 D.Primary Containment Isolation Valves.....3.7/4.7-18 E.Control Room Emergency Ventilation
2                6 months g 25%
.F.Primary Containment Purge System.3.7/4.7-19 3.7/4.7-21 G.Containment Atmosphere Dilution System (CAD).3.7/4.7-22 H.Containment Atmosphere Monitoring (CAM)System H2 Analyzer 3.8/4.8 Radioactive Materials.
3,4           124 days + 25%
A.Liquid Effluents.B.Airborne Effluents 3.7/4.7-24 3.8/4.8-1 3.8/4.8-1 3.8/4.8-3 C.Radioactive Effluents-Dose.........3.8/4.8-6 D.Mechanical Vacuum Pump.3.8/4.8-6 E.Miscellaneous Radioactive Materials Sources..3.8/4.8-7 F.Solid Radwaste.3.9/4.9 Auxiliary Electrical System.A.Auxiliary Electrical Equipment B.Operation with Inoperable Equipment.
5,6,7           62 days g 25%
3.8/4.8-9 3.9/4.9-1 3.9/4.9-1 3.9/4.9-10 C.Operation in Cold Shutdown.3.10/4.10 Core Alterations 3.9/4.9-17 h 3.10/4.10-1 A.Refueling Interlocks
8 or more      31 days g 25%
.~3.10/4.10-1 BFN TT>>e a PRIMARY S S Eh 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6.H.Snubbers 4.6.H.Snubbers During all modes of operation, all snubbers shall be OPERABLE except as noted in 3.6.H.1.All safety-related snubbers are listed in Surveillance Instructions BF SI 4.6.H-l and BF SI 4.6.H-2.1.With one or more snubber(s)
                                                *The inspection  interval shall not be lengthened more than one step at a time.
INOPERABLE on a system that is required to be OPERABLE in the current plant condition, within 72 hours replace or restore the INOPERABLE snubber(s) to OPERABLE status and perform an engineering evaluation on the attached component or declare the attached system INOPERABLE and follow the appropriate Limiting Condition statement for that system.Each safety-related snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 3.6.H/4.6.H.
BFN                                3.6/4.6-16 Unit  1
These snubbers are listed in Surveillance Instructions BF SI 4.6.H-l and BF SI 4.6.H-2.l.Ins ection Grou s The snubbers may be categorized into two major groups based on whether the snubbers are accessible or inaccessible during reactor operation.
 
These major groups may be further subdivided into groups based on design, environment, or other features which may be expected to affect the operability of the snubbers within the group.Each group may be inspected independently in accordance with 4.6.H.2 through 4.6.H.9.2.Visual Ins ection Schedule.and Lot S ze The first inservice visual inspection of snubbers not previously included in these technical specifications and whose visual inspection has BFN.Unit 2 3.6/4.6-15 4 PRIMARY SYSTEI'DARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.2.(Cont'd)not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming po~er after the first refueling outage for inaccessible snubbers subsequent to being included in these specifications.
0 ~ r C ~
The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.Snubbers previously included in these technical specifications shall continue on their previously earned inspection schedule without affect from adding snubbers not within their group.No.Inoperable
4  PRIMARY S  STE  OUNDARY LIMITING CONDITIONS  FOR OPERATION        SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 3~  Visual Ins ection Performance and Evaluation Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) bolts attaching the snubber to the foundation or supporting structure are secure, and (3) snubbers attached to sections of systems  'afety-related that have experienced unexpected  potentially damaging  transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, applicable, to confirm if OPERABILITY.
*Subsequent Snubbers per Visual Inspection Inspection Period Period 0 1 2 3,4 5,6,7 8 or more 18 months g 25%12 months g 25%6 months g 25%124 days g 25%62 days g 25%31 days g 25%*The inspection interval shall not be lengthened more than one step at a time.BFN Unit 2 3.6/4.6-16 4 PRIMARY SYSTEM BO ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 3.Visual Ins ection Performance and Evaluation Visual inspections shall verify (1)that there are no visible indications of damage or impaired OPERABILITY, (2)bolts attaching the snubber to the foundation or supporting structure are secure, and (3)snubbers attached to sections of safety-related systems that have experienced unexpected potentially damaging transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, if applicable, to confirm OPERABILITY.
Snubbers which appear INOPERABLE as a result                of visual inspections                may be determined OPERABLE for the purpose of establishing the next visual inspection interval, providing that (1) the cause of the rejection is clearly established and remedied for that particular.
Snubbers which appear INOPERABLE as a result of visual inspections may be determined OPERABLE for the purpose of establishing the next visual inspection interval, providing that (1)the cause of the rejection is clearly established and remedied for that particular.
snubber and for other snubbers that may be generically susceptible; and  (2) the is functionally affected'nubber tested,  if applicable, the as-found condition in and determined OPERABLE per Specification 4.6.H.5.
snubber and for other snubbers that may be generically susceptible; and (2)the affected snubber is functionally tested, if applicable, in the as-found condition and determined OPERABLE per Specification 4.6.H.5.BFN Unit 2 3.6/4.6-17 I
BFN                                3.6/4.6-17 Unit 1
4 PRIMARY SYSTEh 0 AR LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H Snubbers 4.6.H.3 (Cont'd)Also, snubbers which have been made INOPERABLE as the result of unexpected transients, isolated damage, or other such random events, when the provisions of 4.6.H.7 and 4.6.H.8 have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.Functional Test Schedule Lot Size and Com osition During each refueling outage, a representative sample of 10%of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.The representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the-groups.The representative sample should be weighed to'include more snubbers from severe service areas such as near heavy equipment.
 
The stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.BFN Unit 2 3.6/4.6-18 4 PRIMARY SYSTE i OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.~Snubbe s 5.Functional Test Acce tance C ter a The snubber functional test shall verify that: a.Activation (restraining action)is achieved in both tension and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be tested to verify only that activation takes place in both directions of travel.b.Snubber bleed, or release where required, is present in both compression and tension within the specified range.c.For mechanical snubbers, the force, required to initiate or maintain motion of the snubber is not great enough to overstress-the attached piping or component during thermal movement, or to indicate impending failure of the snubber.d.For snubbers specifically required not to displace under continuous load, the ability of the snubber'o withstand load without'isplacement shall be verified.BFN Unit 2 3.6/4.6-19 4 PRIMARY SYSTEM'UNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.~Snubbe s 4.6.H.5 (Cont'd)e.Testing methods may be used to measure parameters indirectly or parameters other than those specified if those results can be correlated to the specified parameters through established methods.6.Functional Test Failure Anal sis and Additional Test Lots An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to determine the cause of the failure.The result of this analysis shall be used, if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.Selection of snubbers for future testing may also be based on the failure analysis.For each snubber that does not meet the functional test acceptance criteria, an additional lot equal to 10 percent of the remainder of that group of snubbers shall be functionally tested.Testing shall continue until no additional inoperable snubbers are found within subsequent lots or all snubbers of the original inspection group have been tested or all suspect snubbers identified by the failure analysis have been tested, as applicable.
4  PR MARY SYSTEt  OU DAR LIMITING CONDITIONS FOR OPERATION       SURVEILLANCE REQUIREMENTS 4.6.H   Snubbers 4.6.H.3 (Cont'd)
BFN Unit 2 3.6/4.6-20
Also, snubbers which have been made INOPERABLE as   the result of unexpected transients, isolated damage, or other such random events,  when the provisions of 4.6.H.7    and 4.6.H.S have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.
: 4. Functional Test Schedule Lot Size and Com osition During each refueling outage, a  representative sample of 10%
of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.
The  representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the groups. The representative sample should be weighed to include more snubbers from severe service areas such as near heavy equipment.
The  stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.
BFN                              3.6/4.6-18 Unit  1
 
C ~
      '
4   PRIMARY SYSTEI'    ARY LIMITINQ CONDITIONS FOR OPERATION      SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers
: 5. Functiona    Test Acce tance Criteria The snubber  functional test shall verify that:
: a. Activation (restraining action) is achieved in both tension  and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be tested to verify only that activation takes place in both directions of travel.
: b. Snubber bleed, or release where required, is present in both compression and tension within the specified range.
c~  For mechanical snubbers, the force required to initiate or  maintain motion of the snubber is not great enough to overstress the attached piping or component during thermal movement, or to indicate impending failure of the  snubber.
: d. For snubbers   specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be verified.
BFN                               3.6/4.6-19 Unit l
 
I 4  PRIMAR  SYS EN  OUNDARY LIMITING CONDITIONS FOR OPERATION       SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.5 (Cont'd)
: e. Testing methods may be used to measure parameters indirectly or parameters  other than those specified  if  those results can correlated to the specified be parameters  through established methods.
: 6. Functional Test Failure nal sis and Additiona Test Lots An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to   determine the cause of the failure.
The result of this analysis shall be used,    if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.
Selection of snubbers for future testing may also be based on the failure analysis.
For each snubber that does not meet the functional test acceptance criteria, an  additional lot equal to 10 percent of the remainder of that group of snubbers shall be functionally tested. Testing shall continue until no additional inoperable snubbers are found  within subsequent lots or  all snubbers of the original inspection group have been tested or all suspect snubbers identified by the failure analysis have been tested, as applicable.
BFN                              3.6/4.6-20 Unit 1
 
0 F
    ~ P
 
4  PRIMARY SYSTE  OUNDAR LIMITING CONDITIONS FOR OPERATION      SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.6  (Cont'd)
If any  snubber selected for functional testing either fails to lockup or fails to move, i.e.,
frozen in place, the cause will be evaluated and caused by manufacturer or if design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.
This testing requirement shall  be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.
The  discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic. The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners,   as  applicable.
: 7. nctional Test Failure Attached  Com onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).
The purpose of this engineering evaluation shall be to determine    if restrained by the the components BFN                               3.6/4.6-21 Unit  1
 
4   PRIMARY SYSTEl  0   ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.7. (Cont'd) snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.
: 8. Functiona    Testin 0 Re  aired and S are Snubbers Snubbers which    fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced. Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit. These snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.
: 9. Exem  tion from Visua Ins ection or Functional Tests Permanent  or other exemptions from visual inspections and/or functional testing for individual  snubbers may be granted by the Commission if a justifiable is basis for exemption      presented and if applicable snubber life destructive  testing was performed  to qualify snubber operability for the applicable design conditions at either the BFN Unit 1
 
4   PRIMARY SYSTE   0  ARY LIMITING CONDITIONS FOR OPERATION       SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.9 (Cont'd) completion of  their fabrication or at    a subsequent date. Snubbers  so exempted shall  continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.
: 10. Snubber Service  Life  Pro ram The  service  life of snubbers may be extended  based on an evaluation of the records of functional tests, maintenance  history,   and environmental conditions to which the snubbers have been exposed.
BFN                                3.SIS.S-23 Unit 1
 
3.6/4.6  BASES 5.6.H/4.6.H    Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown. The consequence of an inoperable snubber is an increase in the probability of structural    damage to piping or components as a result of a seismic or other event initiating dynamic loads. It  is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.
Because  the protection is required only during relatively low probability events, a period of 72 hours is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system. The 'engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.
To  verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.
These tests  will include stroking of the snubbers to verify proper movement, activation, and bleed or release. Ten percent represents an adequate sample for such tests. Observed failures on these samples will require an engineering analysis and testing of additional units.      If the engineering analysis results in the determination that the failure of a snubber to activate or to stroke (i.e., seized components) is the result of manufacture or design deficiency, all snubbers subject to the same defect shall be functionally tested. A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests. The stroke setting of the snubbers selected for functional testing also will be verified.
All safety-related  snubbers are also visually inspected for overall integrity  and operability. The inspection will include verification of proper orientation, adequate fluid level if applicable, and proper attachment of the snubber to piping and structures. The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.
BFN                                        3.6/4.6-34 Unit  1
 
  ~ '.6/4.6      BASES  (Con    ed)
'
The visual inspection frequency is based upon maintaining a constant level of snubber protection. Thus, the required inspection interval varies inversely with the observed snubber failures. The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection. Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection. However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent) may not be used to lengthen the required inspection interval. Any inspection whose results require a shorter inspection interval will override the previous schedule.
When  the cause of the rejection of a snubber in a visual inspection is clearly established and remedied for that snubber and for any other snubbers that may be. generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable,. Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration. Inspection groups may be established based on design features, and installed conditions which may be expected to be generic. Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted. All suspect snubbers are subject to inspection and testing regardless of inspection groupings.
BFN                                      3.6/4.6-35 Unit 1
 
Section                                                                ~Pa  e  e C. Coolant Leakage.                                          3.6/4.6-9 D. Relief Valves.                                            3.6/4.6-10 E. Jet  Pumps.                                                3.6/4.6-11 F. Recirculation  Pump    Operation    . . . . . . . . . 3.6/4.6-12 G. Structural Integrity      .                                3.6/4.6-13 H. Snubbers                                                    3.6/4.6-15 3.7/4.7    Containment Systems                                              3.7/4.7-1 A. Primary Containment.                                        3.7/4.7-1 B. Standby Gas Treatment System .                              3.7/4.7-13 C. Secondary Containment.                                      3.7/4.7-17 D. Primary Containment Isolation Valves          . . . . . 3.7/4.7-18 E. Control  Room Emergency      Ventilation  .              3.7/4.7-19 F. Primary Containment Purge System          .                3.7/4.7-21 G. Containment Atmosphere        Dilution System  (CAD) . 3.7/4.7-22 H. Containment Atmosphere Monitoring (CAM)
System H2 Analyzer                                        3.7/4.7-24 3.8/4.8    Radioactive Materials.                                          3.8/4.8-1 A. Liquid Effluents    .                                      3.8/4.8-1 B. Airborne Effluents                                          3.8/4.8-3 C. Radioactive Effluents      -  Dose . . . . . . . . .      3.8/4.8-6 D. Mechanical Vacuum    Pump    .                            3.8/4.8-6 E. Miscellaneous Radioactive Materials Sources.          . 3.8/4.8-7 F. Solid Radwaste  .                                          3.8/4.8-9 3.9/4.9    Auxiliary Electrical    System.                                  3.9/4.9-1 A. Auxiliary Electrical    Equipment                          3.9/4.9-1 B. Operation with Inoperable Equipment.                        3.9/4.9-10 C. Operation  in Cold Shutdown .                              3.9/4.9-17 h
3.10/4.10 Core Alterations                                                  3.10/4.10-1 A. Refueling Interlocks    .                                ~
3.10/4.10-1 BFN TT>>e a
 
PRIMARY  S S  Eh  0  ARY LIMITING CONDITIONS  FOR OPERATION            SURVEILLANCE REQUIREMENTS 3.6.H. Snubbers                                4.6.H. Snubbers During all modes of operation,                  Each  safety-related snubber all snubbers shall be OPERABLE                  shall  be demonstrated OPERABLE except as noted in 3.6.H.1.                    by performance of the following All safety-related snubbers                      augmented inservice inspection are listed in Surveillance                      program and the requirements Instructions BF SI 4.6.H-l                      of Specification 3.6.H/4.6.H.
and BF SI 4.6.H-2.                              These snubbers    are listed in Surveillance Instructions
: 1. With one or more                            BF SI 4.6.H-l and BF SI 4.6.H-2.
snubber(s) INOPERABLE on a system  that is required to be OPERABLE in the
: l. Ins ection Grou  s current plant condition,                        The snubbers  may be within 72 hours replace                          categorized into two major or restore the INOPERABLE                        groups based on whether the snubber(s) to OPERABLE                          snubbers are accessible status and perform an                            or inaccessible during engineering evaluation                          reactor operation. These on the attached component                      major groups may be further or declare the attached                          subdivided into groups system INOPERABLE and                          based on design, follow the appropriate                          environment, or other Limiting Condition statement                    features which may be for that system.                                expected to affect the operability of the snubbers within the group. Each group may be inspected independently in accordance with 4.6.H.2 through 4.6.H.9.
: 2. Visual Ins ection Schedule. and Lot    S ze The  first inservice visual inspection of snubbers not previously included in these technical specifications and whose visual inspection has BFN.                                      3.6/4.6-15 Unit  2
 
4  PRIMARY SYSTEI'    DARY LIMITING CONDITIONS FOR OPERATION        SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.2. (Cont'd) not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming po~er  after the first refueling outage for inaccessible snubbers subsequent to being included in these specifications.
The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.
Snubbers previously included in these technical specifications shall continue on  their previously earned inspection schedule without affect from adding snubbers not within their group.
No. Inoperable    *Subsequent Snubbers per      Visual Inspection        Inspection Period            Period 0              18 months g 25%
1              12 months  g 25%
2                6 months g 25%
3,4            124 days g 25%
5,6,7          62 days g 25%
8 or more      31 days g 25%
                                              *The inspection  interval shall not be lengthened more than one step at a time.
BFN                              3.6/4.6-16 Unit  2
 
4    PRIMARY SYSTEM BO  ARY LIMITING CONDITIONS FOR OPERATION          SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers
: 3. Visual Ins ection Performance and Evaluation Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) bolts attaching the snubber to the foundation or supporting structure are secure, and (3) snubbers attached to sections of safety-related systems that have experienced unexpected  potentially damaging  transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, applicable, to confirm if OPERABILITY.
Snubbers which appear INOPERABLE as a result    of visual inspections  may be determined OPERABLE for the purpose of establishing the next visual inspection interval, providing that (1) the cause of the rejection is clearly established and remedied for that particular.
snubber and for other snubbers that may be generically susceptible; and (2) the affected snubber is functionally tested,  if applicable, in the as-found condition and determined OPERABLE per Specification 4.6.H.5.
BFN                                3.6/4.6-17 Unit 2
 
I 4    PRIMARY SYSTEh  0  AR LIMITING CONDITIONS FOR OPERATION        SURVEILLANCE REQUIREMENTS 4.6.H    Snubbers 4.6.H.3 (Cont'd)
Also, snubbers which have been made INOPERABLE as  the result of unexpected transients, isolated damage, or other such random events,  when the provisions of 4.6.H.7 and 4.6.H.8 have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.
Functional Test Schedule Lot Size and Com osition During each refueling outage, a  representative sample of 10%
of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.
The  representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the
                                                -groups. The representative sample should be weighed to
                                                'include more snubbers from severe service areas such as near heavy equipment.
The  stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.
BFN                                3.6/4.6-18 Unit 2
 
4    PRIMARY SYSTE i OUNDARY LIMITING CONDITIONS FOR OPERATION        SURVEILLANCE REQUIREMENTS 4.6.H.  ~Snubbe  s
: 5. Functional Test Acce tance C  ter  a The snubber    functional test shall verify that:
: a. Activation (restraining action) is achieved in both tension and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be  tested to verify only that activation takes place in both directions of travel.
: b. Snubber bleed, or release where required, is present in both compression and tension within the specified range.
: c. For mechanical snubbers, the force, required to initiate or maintain motion of the snubber is not great enough to overstress -the attached piping or component during thermal movement, or to indicate impending failure of the snubber.
: d. For snubbers  specifically required not to displace under continuous load, the ability of the snubber
                                                    'o    withstand load shall                be without'isplacement verified.
BFN                                3.6/4.6-19 Unit 2
 
4    PRIMARY SYSTEM'UNDARY LIMITING CONDITIONS FOR OPERATION      SURVEILLANCE REQUIREMENTS 4.6.H.  ~Snubbe  s 4.6.H.5 (Cont'd)
: e. Testing methods may be used to measure parameters indirectly or parameters    other than those specified    if  those results can correlated to the specified be parameters    through established methods.
: 6. Functional Test Failure Anal sis and Additional Test Lots An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to    determine the cause of the failure.
The result of this analysis shall be used,      if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.
Selection of snubbers for future testing may also be based on the failure analysis.
For each snubber that does not meet the functional test acceptance criteria, an  additional lot equal to 10 percent of the remainder of that group of snubbers shall be functionally tested. Testing shall continue until no additional inoperable snubbers are found    within subsequent lots or  all  snubbers of the original inspection group have been tested or all suspect snubbers identified by the failure analysis have been tested, as applicable.
BFN                                3.6/4.6-20 Unit 2
 
  'I ~
D 3  4 6  PRIMARY SYSTE  OU  ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.6  (Cont'd)
If any  snubber selected for functional testing either fails to lockup or fails to move, i.e.,
frozen in place, the cause will be evaluated and caused by manufacturer or if design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.
This testing requirement shall  be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.
The  discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic. The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners,  as  applicable.
: 7. Functional Test Failure Attached    Com  onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).
The purpose of this engineering evaluation shall be to determine    if restrained by the the components BFN Unit 2


D'I~3 4 6 PRIMARY SYSTE OU ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.6 (Cont'd)If any snubber selected for functional testing either fails to lockup or fails to move, i.e., frozen in place, the cause will be evaluated and if caused by manufacturer or design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.This testing requirement shall be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.The discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic.The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners, as applicable.
7.Functional Test Failure-Attached Com onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).
The purpose of this engineering evaluation shall be to determine if the components restrained by the BFN Unit 2
~'
~'
4.PRIMARY SYSTE OUNDARY I LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.7.(Cont'd)snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.8.unctional Testin Of Re aired and S are Snubbers Snubbers which fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced.Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit.These.snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.9.Exem tion from Visual Ins ection or Functiona ests Permanent or other exemptions from visual inspections and/or functional testing for individual snubbers may be granted by the Commission if a justifiable basis for exemption is presented and if applicable snubber life destructive testing was performed to qualify snubber operability for the applicable design conditions at either the BFN Unit 2 3.'6/4.6-22 4 PRIMARY SYSTE 4 0 DARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.9 (Cont'd)completion of their fabrication or at a subsequent date.Snubbers so exempted shall continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.
: 4. PRIMARY SYSTE   OUNDARY I
10.Snubber Service Life Pro ram The service life of snubbers may be extended based on an evaluation of the records of functional tests, maintenance history, and environmental conditions to which the snubbers have been exposed.BFN Unit 2 3.6/4.6-23 3.6/4.6 BASES 3.6.H/4.6.H Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown.The consequence of an inoperable snubber is an increase in the probability of structural damage to piping or components as a result of a seismic or other event initiating dynamic loads.It is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.
LIMITING CONDITIONS FOR OPERATION       SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.7. (Cont'd) snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.
Because the protection is required only during relatively low probability events, a period of 72 hours is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system.The engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.To verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.
: 8. unctional Testin Of Re aired and S are Snubbers Snubbers which   fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced. Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit. These .snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.
These tests will include stroking of the snubbers to verify proper movement, activation, and bleed or release.Ten percent represents an adequate sample for such tests.Observed failures on these samples will require an engineering analysis and testing of additional units.If the engineering analysis results in the determination that the failure of a snubber to activate or to stroke (i.e.;seized components) is the result of manufacture or design deficiency", all snubbers'subject to the same defect shall be functionally tested.A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests.The stroke setting of the snubbers selected for functional testing also will be verified.All safety-related snubbers are also visually inspected for overall integrity and operability.
: 9. Exem tion from Visual Ins ection or Functiona ests Permanent or other exemptions from visual inspections and/or functional testing for individual snubbers may be granted by the Commission if a justifiable basis for exemption is presented and if applicable snubber life destructive testing was performed to qualify snubber operability for the applicable design conditions at either the BFN                               3.'6/4.6-22 Unit  2
The inspection will include verification of proper orientation, adequate fluid level if applicable, and proper attachment of the snubber to piping and structures.
 
The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.
4   PRIMARY SYSTE 4 0 DARY LIMITING CONDITIONS FOR OPERATION       SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.9 (Cont'd) completion of   their fabrication or at   a subsequent date. Snubbers so exempted shall continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.
BFN Unit 2 3.6/4.6-34 3.6/4.6 BASES (Conted)e The visual inspection frequency is based upon maintaining a constant level of snubber protection.
: 10. Snubber Service   Life Pro ram The service life of snubbers may be extended   based on an evaluation of the records of functional tests, maintenance history,   and environmental conditions to which the snubbers have been exposed.
Thus, the required inspection interval varies inversely with the observed snubber failures.The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection.
BFN                               3.6/4.6-23 Unit 2
Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection.
 
However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent)may not be used to lengthen the required inspection interval.Any inspection whose results require a shorter inspection interval will override the previous schedule.When the cause of the rejection of a snubber in a visual inspection is clearly established and remedied for that snubber and for any other snubbers that may be generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable,.
3.6/4.6   BASES 3.6.H/4.6.H   Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown. The consequence of an inoperable snubber is an increase in the probability of structural   damage to piping or components as a result of a seismic or other event initiating dynamic loads. It is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.
Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration.
Because   the protection is required only during relatively low probability events, a period of 72 hours is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system. The engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.
Inspection groups may be established based on design features, and installed conditions which may be expected to be generic.Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted.
To verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.
All suspect snubbers are subject to inspection and testing regardless of inspection groupings.
These tests   will include stroking of the snubbers to verify proper movement, activation, and bleed or release.     Ten percent represents an adequate sample for such tests. Observed failures on these samples will require an engineering analysis and testing of additional units.
BFN Unit 2 3.6/4.6-35 I l t  
engineering analysis results in the determination that the failure of a If the snubber to activate or to stroke (i.e.; seized components) is the result of manufacture or design deficiency", all snubbers'subject to the same defect shall be functionally tested. A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests. The stroke setting of the snubbers selected for functional testing also will be verified.
~Seooio~Pa e o C.Coolant Leakage.D.Relief Valves.E~Jet Pumps~~~~~~~~~~~~~~~~~3.6/4.6-9 3.6/4.6-10 3.6/4.6-11 F.Recirculation Pump Operation.........3.6/4.6-12 G.Structural Integrity.H.Snubbers 3.7/4.7 Containment Systems A.Primary Containment.
All safety-related   snubbers are also visually inspected for overall integrity   and operability. The inspection will include verification of proper orientation, adequate fluid level     if applicable, and proper attachment of the snubber to piping and structures. The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.
~~3.6/4.6-13 3.6/4.6-15 3.7/4.7-1 3.7/4.7-1 B.Standby Gas Treatment System.........3.7/4.7-13 C.Secondary Containment.
BFN                                       3.6/4.6-34 Unit  2
3.7/4.7-17 D.Primary Containment Isolation Valves.....'.7/4.7-18 E.Control Room Emergency Ventilation
 
......3.7/4.7-19 F.Primary Containment Purge System,.3.7/4.7-21 G.Containment Atmosphere Dilution System (CAD).3.7/4.7-22 H.Containment Atmosphere Monitoring (CAM)System H2 Analyzer.3.8/4.8 Radioactive Materials.
3.6/4.6   BASES (Conted) e The visual inspection frequency is based upon maintaining a constant level of snubber protection. Thus, the required inspection interval varies inversely with the observed snubber failures. The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection. Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection. However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent) may not be used to lengthen the required inspection interval. Any inspection whose results require a shorter inspection interval will override the previous schedule.
A.Liquid Effluents.B.Airborne Effluents.C.Radioactive Effluents-'Dose.D.Mechanical Vacuum Pump.3,7/4.7-24 3.8/4.8-1 3.8/4.8-1 3.8/4.8-3 3.8/4.8-6 3.8/4.8-6 E.Miscellaneous Radioactive Materials Sources..3.8/4.8-7 F.Solid Radwaste 3.9/4.9 Auxiliary Electrical System.3.8/4.8-9 3.9/4.9-1 A.Auxiliary Electrical Equipment........3.9/4.9-1 B.Operation with Inoperable Equipment.
When   the cause of the rejection of a snubber in a visual inspection is clearly established and remedied for that snubber and for any other snubbers that may be generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable,. Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration. Inspection groups may be established based on design features, and installed conditions which may be expected to be generic. Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted. All suspect snubbers are subject to inspection   and testing regardless of inspection groupings.
.....3.9/4.9-10 C.Operation in Cold Shutdown..........3.9/4.9-17 3.10/4.10 Core Alterations 3.10/4.10-1 A.Refueling Interlocks 3.10/4.10-1 4 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers During all modes of operation, all snubbers shall be OPERABLE except as noted in 3.6.H.l.All safety-related snubbers are listed in Surveillance Instructions BF SI 4.6.H-l and BF SI 4.6.H-2.1.With one or more snubber(s)
BFN                                       3.6/4.6-35 Unit  2
INOPERABLE on a system that is required to be OPERABLE.in the current plant condition, within 72 hours replace or restore the INOPERABLE snubber(s) to OPERABLE status and perform an engineering evaluation on the attached component or declare the attached system INOPERABLE and follow the appropriate Limiting Condition statement for that system.Each safety-related snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 3.6.H/4.6.H.
 
These snubbers are listed in Surveillance Instructions BF SI 4.6.H-l and BF SI 4.6.H-2.l.Ins ection Grou s The snubbers may be categorized into two major groups based on whether the snubbers are accessible or inaccessible during reactor operation.
I   l t
These major groups may be further subdivided into groups based on design, environment, or other features which may be expected to affect the operability of the snubbers within the group.Each group may be inspected independently in accordance with 4;6.H.2 through 4.6.H.9.2.Visual Ins ection S edule and Lot S ze The first inservice visual inspection of snubbers not previously included in these technical specifications and whose visual inspection has BFN Unit 3 3.6/4.6-15 P t E E x)i e 4.PRIMARY S STE 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.2.(Cont'd)not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming power after the first refueling outage for inaccessible snubbers subsequent to being included in these specifications.
 
The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.Snubbers previously included in these technical specifications shall continue on their previously., earned inspection schedule without affect from adding snubbers not within their group.No.Inoperable
~Seooio                                                                           ~Pa   e o C. Coolant Leakage.                                                     3.6/4.6-9 D. Relief Valves.                                                       3.6/4.6-10 E~   Jet Pumps ~ ~ ~   ~ ~   ~ ~ ~ ~ ~   ~ ~ ~ ~ ~   ~ ~         3.6/4.6-11 F. Recirculation     Pump   Operation     . . . . . . . .       . 3.6/4.6-12 G. Structural Integrity         .                                      3.6/4.6-13 H. Snubbers                                                             3.6/4.6-15 3.7/4.7    Containment Systems                                              ~  ~    3.7/4.7-1 A. Primary Containment.                                                  3.7/4.7-1 B. Standby Gas Treatment System . . . . . . . . .                       3.7/4.7-13 C. Secondary Containment.                                               3.7/4.7-17 D. Primary Containment Isolation Valves               . . . .     .'.7/4.7-18 E. Control Room Emergency         Ventilation   . . . . . .           3.7/4.7-19 F. Primary Containment Purge System,.                                   3.7/4.7-21 G. Containment Atmosphere           Dilution System     (CAD) .         3.7/4.7-22 H. Containment Atmosphere Monitoring (CAM)
*Subsequent Snubbers per Visual Inspection Inspection Period Period 0 1 2 3,4 5,6,7 8 or more 18 months g 25%12 months g 25%6 months g 25%124 days g 25%62 days g 25%31 days g 25%*The inspection interval shall not be lengthened more than one step at a time.BFN Unit 3 3.6/4.6-16
System H2 Analyzer         .                                      3,7/4.7-24 3.8/4.8   Radioactive Materials.                                                   3.8/4.8-1 A. Liquid Effluents       .                                            3.8/4.8-1 B. Airborne Effluents         .                                        3.8/4.8-3 C. Radioactive Effluents -'Dose           .                            3.8/4.8-6 D. Mechanical Vacuum       Pump   .                                   3.8/4.8-6 E. Miscellaneous Radioactive Materials Sources.                   . 3.8/4.8-7 F. Solid Radwaste                                                      3.8/4.8-9 3.9/4.9   Auxiliary Electrical       System.                                       3.9/4.9-1 A. Auxiliary Electrical         Equipment . . . . . . . .             3.9/4.9-1 B. Operation with Inoperable Equipment.               . . . . .         3.9/4.9-10 C. Operation   in Cold Shutdown . . . . . .             .   . . .     3.9/4.9-17 3.10/4.10 Core Alterations                                                           3.10/4.10-1 A. Refueling Interlocks                                                 3.10/4.10-1
~I 4 PRIMARY SYST 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 3.Visual Ins ection erformance and Evaluation Visual inspections shall verify (1)that there are no visible indications of damage or impaired OPERABILITY, (2)bolts attaching the snubber to the-foundation or supporting structure are secure, and (3)snubbers attached to sections of safety-related systems that have experienced unexpected potentially damaging transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, if applicable, to confirm OPERABILITY.
 
Snubbers which appear INOPERABLE as a result of visual inspections may be determined OPERABLE for the purpose of establishing the next visual'inspection interval, providing that (1)the cause of the rejection is clearly established and remedied for that particular-snubber and for other snubbers that may be generically susceptible; and (2)the affected snubber is functionally tested, if applicable, in the as-found condition and determined OPERABLE per Specification 4.6.H.5.BFN Unit 3 3.6/4.6-17 4 PRIMARY SYSTE 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H Snubbers 4.6.H.3 (Cont'd)Also, snubbers which have been made INOPERABLE as the result of unexpected transients, isolated damage, or other such random events, when the provisions of 4.6.H.7 and 4.6.H.S have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.4~Functional Test Schedule Lot Size and Com osition During each refueling outage, a representative sample of 10%of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.The representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the groups.The representative
4   PRIMARY SYSTE   OUNDARY LIMITING CONDITIONS FOR OPERATION           SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers During all modes of operation,               Each  safety-related snubber all snubbers shall be OPERABLE                shall  be demonstrated OPERABLE except as noted in 3.6.H.l.                   by performance of the following All safety-related snubbers                   augmented    inservice inspection are listed in Surveillance                   program and the requirements Instructions BF SI 4.6.H-l                   of Specification 3.6.H/4.6.H.
" sample should be weighed to include more snubbers from severe service areas such as near heavy equipment., The stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.BFN Unit 3 3.6/4.6-18 4 PRIMARY SYST OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 5.Functional Test Acce tance Criteria The snubber functional test shall verify that: a.Activation (restraining action)is achieved in both tension and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be tested to verify only that activation takes place in both directions of travel.b.Snubber bleed, or release where required, is present in both compression and tension within the specified range..c.For mechanical snubbers, the force required to initiate or maintain motion of the snubber is not great enough to overstress the attached piping or component during thermal movement, or to indicate impending failure of the snubber.d.For snubbers specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be verified.BFN Unit 3 3.6/4.6-19 4 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.5 (Cont'd)e.Testing methods may be used to measure parameters indirectly or parameters other than those specified if those results can be correlated to the specified parameters through established methods.6.Functional Test Failure Anal sis and Additiona Test Lots An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to determine the cause of the failure.The result of this analysis shall be used, if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.Selection of snubbers for future testing may also be based on the failure analysis.For each snubber that does not meet the functional test acceptance criteria, an additional lot equal to 10 percent, of the remainder of that group of snubbers shall be functionally tested.Testing shall continue until no additional inoperable snubbers are found within subsequent lots or all snubbers of the original inspection group have been tested or all suspect snubbers identified by the failure analysis have been tested,'as applicable.
and BF SI   4.6.H-2.                           These snubbers    are listed in Surveillance Instructions
BFN Unit 3 3.6/4.6-20 t 4 PRIMARY SYSTE 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.6 (Cont'd)If any snubber selected for functional testing either fails to lockup or fails to move, i.e., frozen in place, the cause will be evaluated and if caused by manufacturer or design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.This testing requirement shall be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.The discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic.The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners, as applicable.
: 1. With one or more                         BF SI 4.6.H-l and BF SI 4.6.H-2.
7.Functional Test Failure-Attached Com onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).
snubber(s) INOPERABLE on a system that is required                 l. Ins ection Grou  s to be OPERABLE.in the current plant condition,                       The snubbers  may be within 72 hours replace                       categorized into two major or restore the INOPERABLE                     groups based on whether the snubber(s) to OPERABLE                         snubbers are accessible status and perform an                         or inaccessible during engineering evaluation                         reactor operation. These on the attached component                     major groups may be further or declare the attached                       subdivided into groups system INOPERABLE and                         based on design, follow the appropriate                         environment, or other Limiting Condition statement                   features which may be for that system.                               expected to affect the operability of the snubbers within the group. Each group may be inspected independently in accordance with 4;6.H.2 through 4.6.H.9.
The purpose of this engineering evaluation shall be to determine if the components restrained by the BFN Unit 3  
: 2. Visual Ins ection S  edule and Lot  S ze The   first inservice visual inspection of snubbers not previously included in these technical specifications and whose visual inspection has BFN                                    3.6/4.6-15 Unit  3
~)~
 
3 4 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.7.(Cont'd)snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.8.Functional Testin Of Re aired and S are Snubbers Snubbers which fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced.Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit.These snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.9.xem tion from Visual Ins ection or Functional Tests Permanent or other exemptions from visual inspections and/or functional testing for individual snubbers may be granted by the Commission if a Justifiable basis for exemption is presented and if applicable snubber life destructive testing was performed to qualify snubber operability for the applicable design conditions at either the BFN Unit 3 3.6/4.6-22 4 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H.Snubbers 4.6.H.9 (Cont'd)completion of their fabrication or at a subsequent date.Snubbers so exempted shall continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.
P t
10.Snubber Service L fe Pro ram The service life of snubbers may be extended based on an evaluation of the records of functional tests, maintenance history, and environmental conditions to which the snubbers have been exposed.BFN Unit 3 3.6/4.6-23 3.6/4.6 BASES'3.6.H/4.6.H Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown.The consequence of an inoperable snubber is an increase in the probability of structural damage to piping or components as a result of a seismic or other event initiating dynamic loads.It is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.
E E
Because the protection is required only during relatively low probability events, a period of 72 hours is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system.The engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.To verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.
 
These tests will include stroking of the snubbers to verify proper movement, activation, and bleed or release.Ten percent represents an adequate sample for such tests.Observed failures on these samples will require an engineering analysis and testing of additional units.If the engineering analysis results in the determination that the failure of a snubber to activate or to stroke (i.e., seized components) is the result of manufacture or design deficiency, all snubbers subject to the same defect shall be functionally tested.A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests.The stroke setting of the snubbers selected for functional testing also will be verified.All safety-related snubbers are also visually inspected for overall integrity and operability.
x )i e
The inspection will include verification of proper orientation, adequate fluid level if applicable, and proper attachment of the snubber to piping and structures.
: 4. PRIMARY S  STE  0  ARY LIMITING CONDITIONS  FOR OPERATION          SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.2. (Cont'd) not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming power after the  first refueling outage for inaccessible snubbers subsequent to being included in these specifications.
The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.
The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.
BFN Unit 3 3.6/4.6-34 3.6/4.6 BASES (Con ed)The visual inspection frequency is based upon maintaining a constant level of snubber protection.
Snubbers previously included in these technical specifications shall continue on their previously.,
Thus, the required inspection interval varies inversely with the observed snubber failures.The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection.
earned inspection schedule without affect from adding snubbers not within their group.
Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection.
No. Inoperable    *Subsequent Snubbers per      Visual Inspection        Inspection Period            Period 0              18 months g 25%
However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent)may not be used to lengthen the required inspection interval.Any inspection whose results require a shorter inspection interval will override the previous schedule.When the cause of the rejection.
1              12 months g 25%
of a snubber in a visual inspection is clearly established'nd remedied for that snubber and for any other snubbers that may be generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable.
2                6 months g 25%
Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration.
3,4            124 days g 25%
Inspection groups may be established based on design features, and installed conditions which may be expected to be generic.Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted.
5,6,7          62 days g 25%
All suspect snubbers are subject to inspection and testing regardless of inspection groupings.
8 or more      31 days g 25%
BFN Unit 3 3.6/4.6-35 ENCLOSURE 2 DESCRIPTION AND JUSTIFICATION BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2 and 3 DESCRIPTIO OF CHANGE TVA proposes to delete the reference to seismic restraints and supports from sections 3.6.H and 4.6.H of the Units 1, 2 and 3 BFN Technical Specifications and appropriately revising the bases for these two sections.I REASO FOR THE CHANGE The current section 3.6.H is not consistent with industry practice or the GE Standard Technical Specification (NUREG 0123).The 72 hours currently allowed to replace and/or restore seismic restraints and supports or declare the attached system inoperable is unique to the BFN Technical Specifications.
                                                      *The inspection  interval shall not be lengthened more than one step at a time.
It is unnecessarily restrictive in that it precludes performance of an engineering evaluation to determine system operability.
BFN                                3.6/4.6-16 Unit 3
In addition, the surveillance requirements of section 4.6.H are applicable to snubbers only.JUST F CATION FOR CHANGE The deletion of seismic restraints and supports from section 3.6.H and 4.6.H will totally dedicate these sections to snubbers which is consistent with industry practice and GE Standard Technical Specification.
 
Pipe supports will not be specifically addressed in the technical specifications.
~ I 4    PRIMARY SYST    0  ARY LIMITING CONDITIONS FOR OPERATION          SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers
This is consistent with GE Standard Technical Specifications.
: 3. Visual Ins ection erformance and Evaluation Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) bolts attaching the snubber to the -foundation or supporting structure are secure, and (3) snubbers attached to sections of safety-related systems that have experienced unexpected potentially damaging transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, applicable, to confirm if OPERABILITY.
The technical specifications do define operability for systems.Technical specification definition 1.0.E states,"Implicit in the definition of operability shall be the assumptions that all necessary attendant instrumentation
Snubbers which appear INOPERABLE as a result    of visual inspections   may be determined OPERABLE for the purpose of establishing the next visual'inspection interval, providing that (1) the cause of the rejection is clearly established and remedied for that particular-snubber and for other snubbers that may be generically susceptible; and (2) the affected snubber is functionally tested,  if applicable, in the as-found condition and determined OPERABLE per Specification 4.6.H.5.
...or other auxiliary equipment that are required for the system...to perform its function(s) are also capable of performing their related support functions(s)." Pipe supports, through not explicitly mentioned, must.be capable of performing their function, or the associated system operability requirements are not met.If a support is found to be damaged, an engineering evaluation would have to be made to determine if the support is capable of performing its function.If the support is judged to be inoperable, the limiting condition for operation (LCO)requirements apply and generally include an allowed outage time for the system or subsystem.
BFN                                3.6/4.6-17 Unit 3
If the support/restraint cannot be repaired in the allowable LCO timeframe, then the prescribed action statement(s) must be complied with.A further engineering evaluation may also be performed during the LCO timeframe to justify operability of the affected system.If the engineering evaluation concludes the support has no affect on operability, the system would be operable and the LCO requirements would no longer apply.If an engineering evaluation is used to justify that a damaged or inoperable support does not render the associated system inoperable, the evaluation would have to be completed within the allowable outage time for that system.The allowable outage time for the associated system would be applicable from the point in time that it is recognized that the support is damaged.
 
P~4 0 Enc.2-2 JUSTIFIC TION FOR THE CHANGE (cont'd)It should be noted that the LCO for snubbers requires restoration and performance of an engineering evaluation on the components to which the inoperable snubbers are attached.The purpose of the engineering evaluation is to determine if the components to which the snubbers are attached were adversely affected by the failed snubber.The technical specification requires that the restoration and engineering evaluation be completed in 72 hours.These requirements do not apply to other supports.Snubbers are active components and can fail by locking up and imposing loads on the piping or attached components not considered in the design of the system.Supports are passive.Damage to structural components should only generally occur because of unusual events while failure of'nubbers is recognized as a probable occurrence.
4  PRIMARY SYSTE  0  ARY LIMITING CONDITIONS FOR OPERATION      SURVEILLANCE REQUIREMENTS 4.6.Snubbers 4.6.H.3 (Cont'd)
Snubbers have surveillance requirements which confirm their operability; Supports and restraints that are American Society of Mechanical Engineers (ASME)code Class 1, 2 or 3 components are inspected in accordance with Section XI of the ASME Boiler and Pressure Vessel Code as required by 10 CFR 50, Section 50.55a(g)in accordance with BFN Technical Specification 3.6.G.This proposed change does not modify the surveillance requirements under this section in any manner.The deletion of the outage time (72 hours)granted in the technical specifications before entering into the affected system LCO is a conservative change.The use of'an engineering evaluation to support system operability is consistent with industry practice.
Also, snubbers which have been made INOPERABLE as the result of unexpected transients, isolated damage, or other such random events,  when the provisions of 4.6.H.7  and 4.6.H.S have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.
ENCLOSURE 3 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION BROWNS FERRY NUCLEAR PLANT (BFN)UNITS 1, 2 and 3 DISCRIPTION OF AMENDME RE VEST The proposed amendment would change the Technical Specifications, Sections 3.6.H and 4.6.H, of Browns Ferry Nuclear Plant (BFN)Units 1, 2, and 3, to pertain specifically to snubbers and to delete references to seismic restraints and supports from these sections.NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c).A proposed amendment to an operating license involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not (1)involve a significant increase in the probability or consequence of an accident previously evaluated, or (2)create the possibility of a new or different kind of accident from an accident previously evaluated, or (3)involve a significant reduction in a margin of safety.1.The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
4~  Functional Test Schedule Lot Size and Com osition During each refueling outage, a representative sample of 10%
Deleting the seismic restraints and supports from these sections of the technical specifications does not invalidate nor change the, calculations or design basis in which BFN was built and licensed.The current BFN technical specification 3.6.H does not provide any surveillance requirements in order to declare seismic restraints and supports operable.If a restraint or support is found to be damaged or there is a question about its ability to perform it function, the operations department will be informed and the operability of the affected system will be determined.
of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.
If it is determined that the restraint or support will render a technical specification system inoperable, the appropriate system limiting conditions for operation (LCO)will apply.2.This change does not create the possibility of a new or different kind of accident from an accident previously evaluated.
The  representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the groups. The representative "
This proposed change does not add, eliminate, or modify any equipment or operational conditions.
sample should be weighed to include more snubbers from severe service areas such as near heavy equipment.,
These changes still support and are bounded by the design calculations and the Final Safety Analysis Report by which BFN is currently licensed.
The  stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.
Ia~5~Enc.3-2 DESCRIPTIO OF AME MENT RE UEST (cont'd)3.This change does not involve a significant reduction in a margin of safety.Although the proposed changes remove the explicit technical specification requirements for seismic restraints and supports, the overall plant margin of safety will be maintained in that restraints and supports will be considered for system operability.
BFN                              3.6/4.6-18 Unit  3
As stated above, any restraint or support found to be damaged or otherwise incapable of performing its intended function will be evaluated for operability.
 
If a technical specification system or component is found to be adversely affected, thus rendering it inoperable, the appropriate LCO will be followed until the restraint or support is repaired or an engineering evaluation establishes operability without the need for the damaged support or restraint.
4    PRIMARY SYST    OUNDARY LIMITING CONDITIONS FOR OPERATION      SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers
If the restraint or support cannot be repaired or operability established via an engineering evaluation, the appropriate action identified in the technical specification LCO for the associated system will be followed.Deletion of the restraints and supports from the technical specification also eliminates the requirements to repair them within 72 hours as currently stated.This does not reduce the margin of safety since an evaluation will be performed to determine operability of the system or the system LCO and action statements will be followed.The times allowed by the technical specification for a system to be inoperable have been evaluated by NRC, vendors, and the utility and found to be acceptable as issued and utilized throughout the industry.The definition of operability would require the operator to evaluate and determine system operability if a problem arose with a restraint or support since it would be considered a subsystem to the technical specification related piece of equipment.
: 5. Functional Test Acce tance Criteria The snubber  functional test shall verify that:
Determination of Basis for Pro osed No Si nificant Hazards Since the application for amendment involves a proposed change that is encompassed by the criteria for which no significant hazards consideration exists, TVA has made a proposed determination that the application involves no significant hazards consideration.
: a. Activation (restraining action) is achieved in both tension  and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be tested to verify only that activation takes place in both directions of travel.
I 1>~y(<fl t~~}}
: b. Snubber bleed, or release where required, is present in both compression and tension within the specified range.
                                                .c. For mechanical snubbers, the force required to initiate or  maintain motion of the snubber    is not great enough to overstress the attached piping or component during thermal movement, or to indicate impending failure of the   snubber.
: d. For snubbers  specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be verified.
BFN                               3.6/4.6-19 Unit 3
 
4   PRIMARY SYSTE  OUNDARY LIMITING CONDITIONS FOR OPERATION       SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.5 (Cont'd)
: e. Testing methods may be used to measure parameters indirectly or parameters  other than those specified  if  those results can correlated to the specified be parameters    through established methods.
: 6. Functional Test Failure Anal sis and Additiona Test Lots An  engineering evaluation shall  be made  of each failure to meet the functional test acceptance criteria to determine the cause of the failure.
The result of this analysis shall be used, if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.
Selection of snubbers for future testing may also be based on the failure analysis.
For each snubber that does not meet the functional test acceptance criteria, an  additional lot equal to 10 percent, of the remainder of that group of snubbers shall be functionally tested. Testing shall continue until no additional inoperable snubbers are found  within subsequent lots or  all  snubbers of the original inspection group have been tested or all suspect snubbers identified by the  failure analysis have been tested, 'as applicable.
BFN                              3.6/4.6-20 Unit 3
 
t 4   PRIMARY SYSTE   0  ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.(Cont'd)
If any  snubber selected for functional testing either fails to lockup or fails to move, i.e.,
frozen in place, the cause will be evaluated and caused by manufacturer or if design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.
This testing requirement shall be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.
The  discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic. The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners,   as  applicable.
: 7. Functional Test Failure Attached    Com  onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).
The purpose of this engineering evaluation shall be to determine    if restrained by the the components BFN Unit 3
 
~ ) ~
3   4   PRIMARY SYSTE   OUNDARY LIMITING CONDITIONS FOR OPERATION       SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.7. (Cont'd) snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.
: 8. Functional Testin Of Re aired and S are Snubbers Snubbers which    fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced. Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit. These snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.
: 9. xem tion from Visual Ins ection or Functional Tests Permanent  or other exemptions from visual inspections and/or functional testing for individual  snubbers may be granted by the Commission if a Justifiable basis for exemption is presented and if applicable snubber life destructive testing was performed  to qualify snubber  operability for the applicable design conditions at either the BFN                              3.6/4.6-22 Unit 3
 
4   PRIMARY SYSTE   OUNDARY LIMITING CONDITIONS FOR OPERATION       SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.9 (Cont'd) completion of their fabrication or at a subsequent date. Snubbers so exempted shall continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.
: 10. Snubber Service L fe Pro ram The  service  life of snubbers may be extended based on an evaluation of the records of functional tests, maintenance  history,  and environmental conditions to which the snubbers have been exposed.
BFN                                3.6/4.6-23 Unit 3
 
3.6/4.6    BASES
'3.6.H/4.6.H    Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown. The consequence of an inoperable snubber is an increase in the probability of structural  damage to piping or components as a result of a seismic or other event initiating dynamic loads. It is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.
Because  the protection is required only during relatively low probability events, a period of 72 hours is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system. The engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.
To  verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.
These tests  will include stroking of the snubbers to verify proper movement, activation, and bleed or release. Ten percent represents an adequate sample for such tests. Observed failures on these samples will require an engineering analysis and testing of additional units.     If engineering analysis results in the determination that the failure of a the snubber to activate or to stroke (i.e., seized components) is the result of manufacture or design deficiency, all snubbers subject to the same defect shall be functionally tested. A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests. The stroke setting of the snubbers selected for functional testing also will be verified.
All safety-related  snubbers are also visually inspected for overall integrity  and operability. The inspection will include verification of proper orientation, adequate fluid level if applicable, and proper attachment of the snubber to piping and structures. The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.
BFN                                      3.6/4.6-34 Unit 3
 
3.6/4.6    BASES  (Con    ed)
The visual inspection frequency is based upon maintaining a constant level of snubber protection. Thus, the required inspection interval varies inversely with the observed snubber failures. The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection. Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection. However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent) may not be used to lengthen the required inspection interval. Any inspection whose results require a shorter inspection interval will override the previous schedule.
When  the cause of the rejection. of a snubber in a visual inspection is clearly established'nd remedied for that snubber and for any other snubbers that may be generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable. Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration. Inspection groups may be established based on design features, and installed conditions which may be expected to be generic. Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted. All suspect snubbers are subject to inspection and testing regardless of inspection groupings.
BFN                                      3.6/4.6-35 Unit  3
 
ENCLOSURE 2 DESCRIPTION AND JUSTIFICATION BROWNS FERRY NUCLEAR PLANT    (BFN)
UNITS 1, 2 and 3 DESCRIPTIO    OF CHANGE TVA  proposes to delete the reference to seismic restraints and supports from sections 3.6.H and 4.6.H of the Units 1, 2 and 3 BFN Technical Specifications and appropriately revising the bases for these two sections.
I REASO    FOR THE CHANGE The  current section 3.6.H is not consistent with industry practice or the          GE Standard Technical Specification      (NUREG  0123). The 72 hours  currently allowed to replace and/or restore seismic restraints and supports or declare the attached system inoperable is unique to the BFN Technical Specifications. It is unnecessarily restrictive in that      it  precludes performance of an engineering evaluation to determine system operability. In addition, the surveillance requirements of section 4.6.H are applicable to snubbers only.
JUST F CATION FOR CHANGE The  deletion of seismic restraints      and supports from section 3.6.H and 4.6.H will totally  dedicate these sections to snubbers which is consistent with industry practice and GE Standard Technical Specification.
Pipe supports   will not  be  specifically  addressed in the technical specifications. This is consistent with      GE Standard Technical Specifications. The technical specifications do define operability for systems. Technical specification definition 1.0.E states, "Implicit in the definition of operability shall be the assumptions that all necessary attendant instrumentation ... or other auxiliary equipment that are required for the system ... to perform its function(s) are also capable of performing their related support functions(s)." Pipe supports, through not explicitly mentioned, must .be capable of performing their function, or the associated system operability requirements are not met.
If a  support is found to be damaged, an engineering evaluation would have to be made  to determine   if  the support is capable of performing its function.       If the support is judged to be inoperable, the limiting condition for operation (LCO) requirements apply and generally include an allowed outage time for the system or subsystem.     If  the support/restraint cannot be repaired in the allowable LCO timeframe, then the prescribed action statement(s) must be complied with. A further engineering evaluation may also be performed during the LCO timeframe to justify operability of the affected system.         If the engineering evaluation concludes the support has no affect on operability, the system would be operable and the LCO requirements would no longer apply.           If an engineering evaluation is used to justify that a damaged or inoperable support does not render the associated system inoperable, the evaluation would have to be completed within the allowable outage time for that system. The allowable outage time for the associated system would be applicable from the point in time that    it  is recognized that the support is damaged.
 
P~
4
 
0 Enc. 2-2 JUSTIFIC TION  FOR THE CHANGE  (cont'd)
It  should be noted that the LCO for snubbers requires restoration and performance of an engineering evaluation on the components to which the inoperable snubbers are attached. The purpose of the engineering evaluation is to determine  if the components to which the snubbers are attached were adversely affected by the failed snubber. The technical specification requires that the restoration and engineering evaluation be completed in 72 hours. These requirements do not apply to other supports. Snubbers are active components and can fail by locking up and imposing loads on the piping or attached components not considered in the design of the system. Supports are passive. Damage to structural components should only generally occur because of unusual events while failure of'nubbers is recognized as a probable occurrence. Snubbers have surveillance requirements which confirm their operability; Supports and restraints that are American Society of Mechanical Engineers (ASME) code  Class 1, 2 or 3 components are inspected in accordance with Section XI of the ASME Boiler and Pressure Vessel Code as required by 10 CFR 50, Section 50.55a(g) in accordance with BFN Technical Specification 3.6.G. This proposed change does not modify the surveillance requirements under this section in any manner.
The  deletion of the outage time (72 hours) granted in the technical specifications before entering into the affected system LCO is a conservative change. The use of 'an engineering evaluation to support system operability is consistent with industry practice.
 
ENCLOSURE 3 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2 and 3 DISCRIPTION OF  AMENDME    RE VEST The proposed amendment would change the Technical Specifications, Sections 3.6.H and 4.6.H, of Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, to pertain specifically to snubbers and to delete references to seismic restraints and supports from these sections.
NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c). A proposed amendment to an operating license involves no significant hazards consideration      if of the facility in accordance with the proposed amendment would not (1) operation involve a significant increase in the probability or consequence of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from an accident previously evaluated, or (3) involve a significant reduction in a margin of safety.
: 1. The proposed change does   not involve a significant increase in the probability or  consequences  of an accident previously evaluated.
Deleting the seismic restraints and supports from these sections of the technical specifications does not invalidate nor change the, calculations or design basis in which BFN was built and licensed. The current BFN technical specification 3.6.H does not provide any surveillance requirements in order to declare seismic restraints and supports operable. If a restraint or support is found to be damaged      or there is a question about its ability to perform      it function, the operations department will be informed and the operability of the affected system it will be determined. If is determined that the restraint or support will render a technical specification system inoperable, the appropriate system limiting conditions for operation (LCO) will apply.
: 2. This change does not create the possibility of      a new or different kind of accident from an accident previously evaluated.
This proposed change does not add, eliminate, or modify any equipment or operational conditions. These changes      still  support and are bounded by the design calculations and the Final Safety Analysis Report by which BFN is currently licensed.
 
Ia
~ ~
5 Enc. 3-2 DESCRIPTIO  OF AME  MENT RE UEST  (cont'd)
: 3. This change does not involve   a significant reduction in a margin of safety.
Although the proposed changes remove the explicit technical specification requirements for seismic restraints and supports, the overall plant margin of safety will be maintained in that restraints and supports will be considered for system operability. As stated above, any restraint or support found to be damaged or otherwise incapable of performing its intended function will be evaluated for operability. If a technical specification system or component is found to be adversely affected, thus rendering  it inoperable, the appropriate LCO will be followed until the restraint or support is repaired or an engineering evaluation establishes operability without the need for the damaged support or restraint.
the restraint or support cannot be repaired or operability established If via an engineering evaluation, the appropriate action identified in the technical specification LCO for the associated system will be followed.
Deletion of the restraints and supports from the technical specification also eliminates the requirements to repair them within 72 hours as currently stated. This does not reduce the margin of safety since an evaluation will be performed to determine operability of the system or the system LCO and action statements will be followed. The times allowed by the technical specification for a system to be inoperable have been evaluated by NRC, vendors, and the utility and found to be acceptable as issued and utilized throughout the industry. The definition of operability would require the operator to evaluate and determine system operability  if a problem arose with a restraint or support since    it be considered a subsystem to the technical specification related piece of would equipment.
Determination of Basis for Pro osed    No  Si nificant Hazards Since the application for amendment involves a proposed change that is encompassed by the criteria for which no significant hazards consideration exists, TVA has made a proposed determination that the application involves no significant hazards consideration.
 
I 1> ~y( <fl t
  ~ ~}}

Revision as of 00:54, 22 October 2019

Proposed Tech Specs,Including Sections 3.7/4.7 & 3.8/4.8,re Limiting Condition for Operation Surveillance Requirements for Primary Sys Boundary Snubbers & Supports
ML18033A392
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 09/29/1988
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18033A391 List:
References
NUDOCS 8810070013
Download: ML18033A392 (52)


Text

ENCLOSURE 1 PROPOSED TECHNICAL'SPECIFICATION REVISION BROWNS FERRY NUCLEAR PLANT UNITS I, 2, AND 3 (TVA BFN TS 255) 88i 0070013 880929 PDR P

ADO', 05000259 PNU

~Sectio Pae o C. Coolant Leakage. 3.6/4.6-9 D. Relief Valves. 3.6/4.6-10 E. Jet Pumps. 3.6/4.6-11 F. Recirculation Pump Operation . 3.6/4.6-12 G. Structural Integrity . 3.6/4.6-13 H. Snubbers 3.6/4.6-15 3.7/4.7 Containment Systems 3.7/4.7-1 A. Primary Containment. 3.7/4.7-1 B. Standby Gas Treatment System . 3.7/4.7-13 C. Secondary Containment. 3.7/4.7-17 D. Primary Containment Isolation Valves . . . . . 3.7/4.7-18 E. Control Room Emergency Ventilation . . . . . . 3.7/4.7-19 F. Primary Containment Purge System . 3.7/4.7-21 G. Containment Atmosphere Dilution System (CAD) 3.7/4.7-22 H. Containment Atmosphere Monitoring (CAM)

System H2 Analyzer . 3.7/4.7-24 3.8/4.8 Radioactive Materials. 3.8/4.8-1 A. Liquid Effluents 3.8/4.8-1 B. Airborne Effluents 3.8/4.8-3 C. Radioactive Effluents Dose . . . . . . . . . 3.8/4.8-6 D. Mechanical Vacuum Pump . 3.8/4.8-6 E. Miscellaneous Radioactive Materials Sources. . 3.8/4.8-7.

F. Solid Radwaste . 3.8/4.8-9 3.9/4.9 Auxiliary Electrical System. 3.9/4.9-1 A. Auxiliary Electrical Equipment . . . . . . . . 3.9/4.9-1 B. Operation with Inoperable Equipment. . . . . . 3.9/4.9-10 C. Operation in Cold Shutdown . . . . . . . . . . 3.9/4.9-17 3.10/4.10 Core Alterations . 3.10/4.10-1 A. Refueling Interlocks . . . . . . . . . . . . . '.10/4.10-1

I 4 PR MARY SYSTE 0 DARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers During all modes of operation, Each safety-related snubber all snubbers shall be OPERABLE shall be demonstrated OPERABLE except as noted in 3.6.H.l. by performance of the following All safety-related snubbers augmented inservice inspection are listed in Surveillance program and the requirements Instructions BF SI 4.6.H-1 of Specification 3.6.H/4.6.H.

and BF SI 4.6.H-2. These snubbers are listed in Surveillance Instructions

1. With one or more BF SI 4.6.H-l and BF SI 4.6.H-2.

snubber(s) INOPERABLE on a system that is required 1. Ins ection Grou s to be OPERABLE in the current plant condition, The snubbers may be within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace categorized into two major or restore the INOPERABLE groups based on whether the snubber(s) to OPERABLE snubbers are accessible status and perform an or inaccessible during engineering evaluation reactor operation. These on the attached component major groups may be further or declare the attached subdivided into groups system INOPERABLE and based on design, follow the appropriate environment, or other Limiting Condition statement features which may be for that system. expected to affect the operability of the snubbers within the group. Each group may be inspected independently in accordance with 4.6.H.2 through 4.6.H.9.

2. Visual Ins ection Schedule and Lot Size The first inservice visual inspection of snubbers not previously included.in these technical specifications and whose visual inspection has BFN 3.6/4.6-15 Unit 1

I 3.6\ 4 6 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.2. (Cont'd) not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming power after the first refueling outage for inaccessible snubbers subsequent to being included in these specifications.

The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.

Snubbers previously included in these technical specifications shall continue on their previously earned inspection schedule without affect from adding snubbers not within their group.

No. Inoperable *Subsequent Snubbers per Visual Inspection Inspection Period Period 0 18 months g 25%

1 12 months g 25%

2 6 months g 25%

3,4 124 days + 25%

5,6,7 62 days g 25%

8 or more 31 days g 25%

  • The inspection interval shall not be lengthened more than one step at a time.

BFN 3.6/4.6-16 Unit 1

0 ~ r C ~

4 PRIMARY S STE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 3~ Visual Ins ection Performance and Evaluation Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) bolts attaching the snubber to the foundation or supporting structure are secure, and (3) snubbers attached to sections of systems 'afety-related that have experienced unexpected potentially damaging transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, applicable, to confirm if OPERABILITY.

Snubbers which appear INOPERABLE as a result of visual inspections may be determined OPERABLE for the purpose of establishing the next visual inspection interval, providing that (1) the cause of the rejection is clearly established and remedied for that particular.

snubber and for other snubbers that may be generically susceptible; and (2) the is functionally affected'nubber tested, if applicable, the as-found condition in and determined OPERABLE per Specification 4.6.H.5.

BFN 3.6/4.6-17 Unit 1

4 PR MARY SYSTEt OU DAR LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H Snubbers 4.6.H.3 (Cont'd)

Also, snubbers which have been made INOPERABLE as the result of unexpected transients, isolated damage, or other such random events, when the provisions of 4.6.H.7 and 4.6.H.S have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.

4. Functional Test Schedule Lot Size and Com osition During each refueling outage, a representative sample of 10%

of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.

The representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the groups. The representative sample should be weighed to include more snubbers from severe service areas such as near heavy equipment.

The stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.

BFN 3.6/4.6-18 Unit 1

C ~

'

4 PRIMARY SYSTEI' ARY LIMITINQ CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers

5. Functiona Test Acce tance Criteria The snubber functional test shall verify that:
a. Activation (restraining action) is achieved in both tension and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be tested to verify only that activation takes place in both directions of travel.
b. Snubber bleed, or release where required, is present in both compression and tension within the specified range.

c~ For mechanical snubbers, the force required to initiate or maintain motion of the snubber is not great enough to overstress the attached piping or component during thermal movement, or to indicate impending failure of the snubber.

d. For snubbers specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be verified.

BFN 3.6/4.6-19 Unit l

I 4 PRIMAR SYS EN OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.5 (Cont'd)

e. Testing methods may be used to measure parameters indirectly or parameters other than those specified if those results can correlated to the specified be parameters through established methods.
6. Functional Test Failure nal sis and Additiona Test Lots An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to determine the cause of the failure.

The result of this analysis shall be used, if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.

Selection of snubbers for future testing may also be based on the failure analysis.

For each snubber that does not meet the functional test acceptance criteria, an additional lot equal to 10 percent of the remainder of that group of snubbers shall be functionally tested. Testing shall continue until no additional inoperable snubbers are found within subsequent lots or all snubbers of the original inspection group have been tested or all suspect snubbers identified by the failure analysis have been tested, as applicable.

BFN 3.6/4.6-20 Unit 1

0 F

~ P

4 PRIMARY SYSTE OUNDAR LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.6 (Cont'd)

If any snubber selected for functional testing either fails to lockup or fails to move, i.e.,

frozen in place, the cause will be evaluated and caused by manufacturer or if design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.

This testing requirement shall be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.

The discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic. The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners, as applicable.

7. nctional Test Failure Attached Com onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).

The purpose of this engineering evaluation shall be to determine if restrained by the the components BFN 3.6/4.6-21 Unit 1

4 PRIMARY SYSTEl 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.7. (Cont'd) snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.

8. Functiona Testin 0 Re aired and S are Snubbers Snubbers which fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced. Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit. These snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.
9. Exem tion from Visua Ins ection or Functional Tests Permanent or other exemptions from visual inspections and/or functional testing for individual snubbers may be granted by the Commission if a justifiable is basis for exemption presented and if applicable snubber life destructive testing was performed to qualify snubber operability for the applicable design conditions at either the BFN Unit 1

4 PRIMARY SYSTE 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.9 (Cont'd) completion of their fabrication or at a subsequent date. Snubbers so exempted shall continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.

10. Snubber Service Life Pro ram The service life of snubbers may be extended based on an evaluation of the records of functional tests, maintenance history, and environmental conditions to which the snubbers have been exposed.

BFN 3.SIS.S-23 Unit 1

3.6/4.6 BASES 5.6.H/4.6.H Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown. The consequence of an inoperable snubber is an increase in the probability of structural damage to piping or components as a result of a seismic or other event initiating dynamic loads. It is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.

Because the protection is required only during relatively low probability events, a period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system. The 'engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.

To verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.

These tests will include stroking of the snubbers to verify proper movement, activation, and bleed or release. Ten percent represents an adequate sample for such tests. Observed failures on these samples will require an engineering analysis and testing of additional units. If the engineering analysis results in the determination that the failure of a snubber to activate or to stroke (i.e., seized components) is the result of manufacture or design deficiency, all snubbers subject to the same defect shall be functionally tested. A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests. The stroke setting of the snubbers selected for functional testing also will be verified.

All safety-related snubbers are also visually inspected for overall integrity and operability. The inspection will include verification of proper orientation, adequate fluid level if applicable, and proper attachment of the snubber to piping and structures. The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.

BFN 3.6/4.6-34 Unit 1

~ '.6/4.6 BASES (Con ed)

'

The visual inspection frequency is based upon maintaining a constant level of snubber protection. Thus, the required inspection interval varies inversely with the observed snubber failures. The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection. Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection. However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent) may not be used to lengthen the required inspection interval. Any inspection whose results require a shorter inspection interval will override the previous schedule.

When the cause of the rejection of a snubber in a visual inspection is clearly established and remedied for that snubber and for any other snubbers that may be. generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable,. Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration. Inspection groups may be established based on design features, and installed conditions which may be expected to be generic. Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted. All suspect snubbers are subject to inspection and testing regardless of inspection groupings.

BFN 3.6/4.6-35 Unit 1

Section ~Pa e e C. Coolant Leakage. 3.6/4.6-9 D. Relief Valves. 3.6/4.6-10 E. Jet Pumps. 3.6/4.6-11 F. Recirculation Pump Operation . . . . . . . . . 3.6/4.6-12 G. Structural Integrity . 3.6/4.6-13 H. Snubbers 3.6/4.6-15 3.7/4.7 Containment Systems 3.7/4.7-1 A. Primary Containment. 3.7/4.7-1 B. Standby Gas Treatment System . 3.7/4.7-13 C. Secondary Containment. 3.7/4.7-17 D. Primary Containment Isolation Valves . . . . . 3.7/4.7-18 E. Control Room Emergency Ventilation . 3.7/4.7-19 F. Primary Containment Purge System . 3.7/4.7-21 G. Containment Atmosphere Dilution System (CAD) . 3.7/4.7-22 H. Containment Atmosphere Monitoring (CAM)

System H2 Analyzer 3.7/4.7-24 3.8/4.8 Radioactive Materials. 3.8/4.8-1 A. Liquid Effluents . 3.8/4.8-1 B. Airborne Effluents 3.8/4.8-3 C. Radioactive Effluents - Dose . . . . . . . . . 3.8/4.8-6 D. Mechanical Vacuum Pump . 3.8/4.8-6 E. Miscellaneous Radioactive Materials Sources. . 3.8/4.8-7 F. Solid Radwaste . 3.8/4.8-9 3.9/4.9 Auxiliary Electrical System. 3.9/4.9-1 A. Auxiliary Electrical Equipment 3.9/4.9-1 B. Operation with Inoperable Equipment. 3.9/4.9-10 C. Operation in Cold Shutdown . 3.9/4.9-17 h

3.10/4.10 Core Alterations 3.10/4.10-1 A. Refueling Interlocks . ~

3.10/4.10-1 BFN TT>>e a

PRIMARY S S Eh 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 3.6.H. Snubbers 4.6.H. Snubbers During all modes of operation, Each safety-related snubber all snubbers shall be OPERABLE shall be demonstrated OPERABLE except as noted in 3.6.H.1. by performance of the following All safety-related snubbers augmented inservice inspection are listed in Surveillance program and the requirements Instructions BF SI 4.6.H-l of Specification 3.6.H/4.6.H.

and BF SI 4.6.H-2. These snubbers are listed in Surveillance Instructions

1. With one or more BF SI 4.6.H-l and BF SI 4.6.H-2.

snubber(s) INOPERABLE on a system that is required to be OPERABLE in the

l. Ins ection Grou s current plant condition, The snubbers may be within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace categorized into two major or restore the INOPERABLE groups based on whether the snubber(s) to OPERABLE snubbers are accessible status and perform an or inaccessible during engineering evaluation reactor operation. These on the attached component major groups may be further or declare the attached subdivided into groups system INOPERABLE and based on design, follow the appropriate environment, or other Limiting Condition statement features which may be for that system. expected to affect the operability of the snubbers within the group. Each group may be inspected independently in accordance with 4.6.H.2 through 4.6.H.9.
2. Visual Ins ection Schedule. and Lot S ze The first inservice visual inspection of snubbers not previously included in these technical specifications and whose visual inspection has BFN. 3.6/4.6-15 Unit 2

4 PRIMARY SYSTEI' DARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.2. (Cont'd) not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming po~er after the first refueling outage for inaccessible snubbers subsequent to being included in these specifications.

The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.

Snubbers previously included in these technical specifications shall continue on their previously earned inspection schedule without affect from adding snubbers not within their group.

No. Inoperable *Subsequent Snubbers per Visual Inspection Inspection Period Period 0 18 months g 25%

1 12 months g 25%

2 6 months g 25%

3,4 124 days g 25%

5,6,7 62 days g 25%

8 or more 31 days g 25%

  • The inspection interval shall not be lengthened more than one step at a time.

BFN 3.6/4.6-16 Unit 2

4 PRIMARY SYSTEM BO ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers

3. Visual Ins ection Performance and Evaluation Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) bolts attaching the snubber to the foundation or supporting structure are secure, and (3) snubbers attached to sections of safety-related systems that have experienced unexpected potentially damaging transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, applicable, to confirm if OPERABILITY.

Snubbers which appear INOPERABLE as a result of visual inspections may be determined OPERABLE for the purpose of establishing the next visual inspection interval, providing that (1) the cause of the rejection is clearly established and remedied for that particular.

snubber and for other snubbers that may be generically susceptible; and (2) the affected snubber is functionally tested, if applicable, in the as-found condition and determined OPERABLE per Specification 4.6.H.5.

BFN 3.6/4.6-17 Unit 2

I 4 PRIMARY SYSTEh 0 AR LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H Snubbers 4.6.H.3 (Cont'd)

Also, snubbers which have been made INOPERABLE as the result of unexpected transients, isolated damage, or other such random events, when the provisions of 4.6.H.7 and 4.6.H.8 have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.

Functional Test Schedule Lot Size and Com osition During each refueling outage, a representative sample of 10%

of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.

The representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the

-groups. The representative sample should be weighed to

'include more snubbers from severe service areas such as near heavy equipment.

The stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.

BFN 3.6/4.6-18 Unit 2

4 PRIMARY SYSTE i OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. ~Snubbe s

5. Functional Test Acce tance C ter a The snubber functional test shall verify that:
a. Activation (restraining action) is achieved in both tension and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be tested to verify only that activation takes place in both directions of travel.
b. Snubber bleed, or release where required, is present in both compression and tension within the specified range.
c. For mechanical snubbers, the force, required to initiate or maintain motion of the snubber is not great enough to overstress -the attached piping or component during thermal movement, or to indicate impending failure of the snubber.
d. For snubbers specifically required not to displace under continuous load, the ability of the snubber

'o withstand load shall be without'isplacement verified.

BFN 3.6/4.6-19 Unit 2

4 PRIMARY SYSTEM'UNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. ~Snubbe s 4.6.H.5 (Cont'd)

e. Testing methods may be used to measure parameters indirectly or parameters other than those specified if those results can correlated to the specified be parameters through established methods.
6. Functional Test Failure Anal sis and Additional Test Lots An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to determine the cause of the failure.

The result of this analysis shall be used, if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.

Selection of snubbers for future testing may also be based on the failure analysis.

For each snubber that does not meet the functional test acceptance criteria, an additional lot equal to 10 percent of the remainder of that group of snubbers shall be functionally tested. Testing shall continue until no additional inoperable snubbers are found within subsequent lots or all snubbers of the original inspection group have been tested or all suspect snubbers identified by the failure analysis have been tested, as applicable.

BFN 3.6/4.6-20 Unit 2

'I ~

D 3 4 6 PRIMARY SYSTE OU ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.6 (Cont'd)

If any snubber selected for functional testing either fails to lockup or fails to move, i.e.,

frozen in place, the cause will be evaluated and caused by manufacturer or if design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.

This testing requirement shall be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.

The discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic. The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners, as applicable.

7. Functional Test Failure Attached Com onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).

The purpose of this engineering evaluation shall be to determine if restrained by the the components BFN Unit 2

~'

4. PRIMARY SYSTE OUNDARY I

LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.7. (Cont'd) snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.

8. unctional Testin Of Re aired and S are Snubbers Snubbers which fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced. Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit. These .snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.
9. Exem tion from Visual Ins ection or Functiona ests Permanent or other exemptions from visual inspections and/or functional testing for individual snubbers may be granted by the Commission if a justifiable basis for exemption is presented and if applicable snubber life destructive testing was performed to qualify snubber operability for the applicable design conditions at either the BFN 3.'6/4.6-22 Unit 2

4 PRIMARY SYSTE 4 0 DARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.9 (Cont'd) completion of their fabrication or at a subsequent date. Snubbers so exempted shall continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.

10. Snubber Service Life Pro ram The service life of snubbers may be extended based on an evaluation of the records of functional tests, maintenance history, and environmental conditions to which the snubbers have been exposed.

BFN 3.6/4.6-23 Unit 2

3.6/4.6 BASES 3.6.H/4.6.H Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown. The consequence of an inoperable snubber is an increase in the probability of structural damage to piping or components as a result of a seismic or other event initiating dynamic loads. It is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.

Because the protection is required only during relatively low probability events, a period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system. The engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.

To verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.

These tests will include stroking of the snubbers to verify proper movement, activation, and bleed or release. Ten percent represents an adequate sample for such tests. Observed failures on these samples will require an engineering analysis and testing of additional units.

engineering analysis results in the determination that the failure of a If the snubber to activate or to stroke (i.e.; seized components) is the result of manufacture or design deficiency", all snubbers'subject to the same defect shall be functionally tested. A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests. The stroke setting of the snubbers selected for functional testing also will be verified.

All safety-related snubbers are also visually inspected for overall integrity and operability. The inspection will include verification of proper orientation, adequate fluid level if applicable, and proper attachment of the snubber to piping and structures. The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.

BFN 3.6/4.6-34 Unit 2

3.6/4.6 BASES (Conted) e The visual inspection frequency is based upon maintaining a constant level of snubber protection. Thus, the required inspection interval varies inversely with the observed snubber failures. The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection. Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection. However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent) may not be used to lengthen the required inspection interval. Any inspection whose results require a shorter inspection interval will override the previous schedule.

When the cause of the rejection of a snubber in a visual inspection is clearly established and remedied for that snubber and for any other snubbers that may be generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable,. Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration. Inspection groups may be established based on design features, and installed conditions which may be expected to be generic. Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted. All suspect snubbers are subject to inspection and testing regardless of inspection groupings.

BFN 3.6/4.6-35 Unit 2

I l t

~Seooio ~Pa e o C. Coolant Leakage. 3.6/4.6-9 D. Relief Valves. 3.6/4.6-10 E~ Jet Pumps ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 3.6/4.6-11 F. Recirculation Pump Operation . . . . . . . . . 3.6/4.6-12 G. Structural Integrity . 3.6/4.6-13 H. Snubbers 3.6/4.6-15 3.7/4.7 Containment Systems ~ ~ 3.7/4.7-1 A. Primary Containment. 3.7/4.7-1 B. Standby Gas Treatment System . . . . . . . . . 3.7/4.7-13 C. Secondary Containment. 3.7/4.7-17 D. Primary Containment Isolation Valves . . . . .'.7/4.7-18 E. Control Room Emergency Ventilation . . . . . . 3.7/4.7-19 F. Primary Containment Purge System,. 3.7/4.7-21 G. Containment Atmosphere Dilution System (CAD) . 3.7/4.7-22 H. Containment Atmosphere Monitoring (CAM)

System H2 Analyzer . 3,7/4.7-24 3.8/4.8 Radioactive Materials. 3.8/4.8-1 A. Liquid Effluents . 3.8/4.8-1 B. Airborne Effluents . 3.8/4.8-3 C. Radioactive Effluents -'Dose . 3.8/4.8-6 D. Mechanical Vacuum Pump . 3.8/4.8-6 E. Miscellaneous Radioactive Materials Sources. . 3.8/4.8-7 F. Solid Radwaste 3.8/4.8-9 3.9/4.9 Auxiliary Electrical System. 3.9/4.9-1 A. Auxiliary Electrical Equipment . . . . . . . . 3.9/4.9-1 B. Operation with Inoperable Equipment. . . . . . 3.9/4.9-10 C. Operation in Cold Shutdown . . . . . . . . . . 3.9/4.9-17 3.10/4.10 Core Alterations 3.10/4.10-1 A. Refueling Interlocks 3.10/4.10-1

4 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers During all modes of operation, Each safety-related snubber all snubbers shall be OPERABLE shall be demonstrated OPERABLE except as noted in 3.6.H.l. by performance of the following All safety-related snubbers augmented inservice inspection are listed in Surveillance program and the requirements Instructions BF SI 4.6.H-l of Specification 3.6.H/4.6.H.

and BF SI 4.6.H-2. These snubbers are listed in Surveillance Instructions

1. With one or more BF SI 4.6.H-l and BF SI 4.6.H-2.

snubber(s) INOPERABLE on a system that is required l. Ins ection Grou s to be OPERABLE.in the current plant condition, The snubbers may be within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace categorized into two major or restore the INOPERABLE groups based on whether the snubber(s) to OPERABLE snubbers are accessible status and perform an or inaccessible during engineering evaluation reactor operation. These on the attached component major groups may be further or declare the attached subdivided into groups system INOPERABLE and based on design, follow the appropriate environment, or other Limiting Condition statement features which may be for that system. expected to affect the operability of the snubbers within the group. Each group may be inspected independently in accordance with 4;6.H.2 through 4.6.H.9.

2. Visual Ins ection S edule and Lot S ze The first inservice visual inspection of snubbers not previously included in these technical specifications and whose visual inspection has BFN 3.6/4.6-15 Unit 3

P t

E E

x )i e

4. PRIMARY S STE 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.2. (Cont'd) not been performed and documented previously, shall be performed within six months for accessible snubbers and before resuming power after the first refueling outage for inaccessible snubbers subsequent to being included in these specifications.

The results of these inspections shall be used in the schedule table below to determine the subsequent visual inspection period.

Snubbers previously included in these technical specifications shall continue on their previously.,

earned inspection schedule without affect from adding snubbers not within their group.

No. Inoperable *Subsequent Snubbers per Visual Inspection Inspection Period Period 0 18 months g 25%

1 12 months g 25%

2 6 months g 25%

3,4 124 days g 25%

5,6,7 62 days g 25%

8 or more 31 days g 25%

  • The inspection interval shall not be lengthened more than one step at a time.

BFN 3.6/4.6-16 Unit 3

~ I 4 PRIMARY SYST 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers

3. Visual Ins ection erformance and Evaluation Visual inspections shall verify (1) that there are no visible indications of damage or impaired OPERABILITY, (2) bolts attaching the snubber to the -foundation or supporting structure are secure, and (3) snubbers attached to sections of safety-related systems that have experienced unexpected potentially damaging transients since the last inspection period shall be evaluated for the possibility of concealed damage and functionally tested, applicable, to confirm if OPERABILITY.

Snubbers which appear INOPERABLE as a result of visual inspections may be determined OPERABLE for the purpose of establishing the next visual'inspection interval, providing that (1) the cause of the rejection is clearly established and remedied for that particular-snubber and for other snubbers that may be generically susceptible; and (2) the affected snubber is functionally tested, if applicable, in the as-found condition and determined OPERABLE per Specification 4.6.H.5.

BFN 3.6/4.6-17 Unit 3

4 PRIMARY SYSTE 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H Snubbers 4.6.H.3 (Cont'd)

Also, snubbers which have been made INOPERABLE as the result of unexpected transients, isolated damage, or other such random events, when the provisions of 4.6.H.7 and 4.6.H.S have been met and any other appropriate corrective action implemented, shall not be counted in determining the next visual inspection interval.

4~ Functional Test Schedule Lot Size and Com osition During each refueling outage, a representative sample of 10%

of the total of each group of safety-related snubbers in use in the plant shall be functionally tested either in place or in a bench test.

The representative sample selected for functional testing shall include the various configurations, operating environments, and the range of size and capacity of snubbers within the groups. The representative "

sample should be weighed to include more snubbers from severe service areas such as near heavy equipment.,

The stroke setting and the security of fasteners for attachment of the snubbers to the component and to the snubber anchorage shall be verified on snubbers selected for functional tests.

BFN 3.6/4.6-18 Unit 3

4 PRIMARY SYST OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers

5. Functional Test Acce tance Criteria The snubber functional test shall verify that:
a. Activation (restraining action) is achieved in both tension and compression within the specified range, except that inertia dependent, acceleration limiting mechanical snubbers may be tested to verify only that activation takes place in both directions of travel.
b. Snubber bleed, or release where required, is present in both compression and tension within the specified range.

.c. For mechanical snubbers, the force required to initiate or maintain motion of the snubber is not great enough to overstress the attached piping or component during thermal movement, or to indicate impending failure of the snubber.

d. For snubbers specifically required not to displace under continuous load, the ability of the snubber to withstand load without displacement shall be verified.

BFN 3.6/4.6-19 Unit 3

4 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.5 (Cont'd)

e. Testing methods may be used to measure parameters indirectly or parameters other than those specified if those results can correlated to the specified be parameters through established methods.
6. Functional Test Failure Anal sis and Additiona Test Lots An engineering evaluation shall be made of each failure to meet the functional test acceptance criteria to determine the cause of the failure.

The result of this analysis shall be used, if applicable, in selecting snubbers to be tested in the subsequent lot in an effort to determine the OPERABILITY of other snubbers which may be subject to the same failure mode.

Selection of snubbers for future testing may also be based on the failure analysis.

For each snubber that does not meet the functional test acceptance criteria, an additional lot equal to 10 percent, of the remainder of that group of snubbers shall be functionally tested. Testing shall continue until no additional inoperable snubbers are found within subsequent lots or all snubbers of the original inspection group have been tested or all suspect snubbers identified by the failure analysis have been tested, 'as applicable.

BFN 3.6/4.6-20 Unit 3

t 4 PRIMARY SYSTE 0 ARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.6 (Cont'd)

If any snubber selected for functional testing either fails to lockup or fails to move, i.e.,

frozen in place, the cause will be evaluated and caused by manufacturer or if design deficiency, all snubbers of the same design subject to the same defect shall be functionally tested.

This testing requirement shall be independent of the requirements stated above for snubbers not meeting the functional test acceptance criteria.

The discovery of loose or missing attachment fasteners will be evaluated to determine whether the cause may be localized or generic. The result of the evaluation will be used to select other suspect snubbers for verifying the attachment fasteners, as applicable.

7. Functional Test Failure Attached Com onent Anal sis For the snubber(s) found INOPERABLE, an engineering evaluation shall be performed on the components which are restrained by the snubber(s).

The purpose of this engineering evaluation shall be to determine if restrained by the the components BFN Unit 3

~ ) ~

3 4 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.7. (Cont'd) snubber(s) were adversely affected by the inoperability of the snubber(s), and in order to ensure that the restrained component remains capable of meeting the designed service.

8. Functional Testin Of Re aired and S are Snubbers Snubbers which fail the visual inspection or the functional test acceptance criteria shall be repaired or replaced. Replacement snubbers and snubbers which have repairs which might affect the functional test results shall meet the functional test criteria before installation in the unit. These snubbers shall have met the acceptance criteria subsequent to their most recent service, and the functional test must have been performed within 12 months before being installed in the unit.
9. xem tion from Visual Ins ection or Functional Tests Permanent or other exemptions from visual inspections and/or functional testing for individual snubbers may be granted by the Commission if a Justifiable basis for exemption is presented and if applicable snubber life destructive testing was performed to qualify snubber operability for the applicable design conditions at either the BFN 3.6/4.6-22 Unit 3

4 PRIMARY SYSTE OUNDARY LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS 4.6.H. Snubbers 4.6.H.9 (Cont'd) completion of their fabrication or at a subsequent date. Snubbers so exempted shall continue to be listed in the plant instructions with footnotes indicating the extent of the exemptions.

10. Snubber Service L fe Pro ram The service life of snubbers may be extended based on an evaluation of the records of functional tests, maintenance history, and environmental conditions to which the snubbers have been exposed.

BFN 3.6/4.6-23 Unit 3

3.6/4.6 BASES

'3.6.H/4.6.H Snubbers Snubbers are designed to prevent unrestrained pipe or component motion under dynamic loads as might occur during an earthquake or severe transient, while allowing normal thermal motion during startup and shutdown. The consequence of an inoperable snubber is an increase in the probability of structural damage to piping or components as a result of a seismic or other event initiating dynamic loads. It is therefore required that all snubbers required to protect the primary coolant system or any other safety system or component be operable during reactor operation.

Because the protection is required only during relatively low probability events, a period of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> is allowed to replace or restore the inoperable snubber to operable status and perform an engineering evaluation on the supported component or declare the supported system inoperable and follow the appropriate limiting condition for operation statement for that system. The engineering evaluation is performed to determine whether the mode of failure of the snubber has adversely affected any safety-related component or system.

To verify snubber operability functional tests shall be performed during the refueling outages, at approximately 18-month intervals.

These tests will include stroking of the snubbers to verify proper movement, activation, and bleed or release. Ten percent represents an adequate sample for such tests. Observed failures on these samples will require an engineering analysis and testing of additional units. If engineering analysis results in the determination that the failure of a the snubber to activate or to stroke (i.e., seized components) is the result of manufacture or design deficiency, all snubbers subject to the same defect shall be functionally tested. A thorough inspection of the snubber threaded attachments to the pipe or components and the anchorage will be made in conjunction with all required functional tests. The stroke setting of the snubbers selected for functional testing also will be verified.

All safety-related snubbers are also visually inspected for overall integrity and operability. The inspection will include verification of proper orientation, adequate fluid level if applicable, and proper attachment of the snubber to piping and structures. The removal of insulation or the verification of torque values for threaded fasteners is not required for visual inspections.

BFN 3.6/4.6-34 Unit 3

3.6/4.6 BASES (Con ed)

The visual inspection frequency is based upon maintaining a constant level of snubber protection. Thus, the required inspection interval varies inversely with the observed snubber failures. The number of inoperable snubbers found during a required inspection determines the time interval for the next required inspection. Inspections performed before that interval has elapsed may be used as a new reference point to determine the next inspection. However, the results of such early inspections performed before the original required time interval has elapsed (nominal time less 25 percent) may not be used to lengthen the required inspection interval. Any inspection whose results require a shorter inspection interval will override the previous schedule.

When the cause of the rejection. of a snubber in a visual inspection is clearly established'nd remedied for that snubber and for any other snubbers that may be generically susceptible and operability verified by inservice functional testing, if applicable, that snubber may be exempted from being counted as inoperable. Generically susceptible snubbers are those which are of a specific make or model and have the same design features directly related to rejection of the snubber, or are similarly located or exposed to the same environmental conditions such as temperature, radiation, and vibration. Inspection groups may be established based on design features, and installed conditions which may be expected to be generic. Each of these inspection groups is inspected and tested separately unless an engineering analysis indicates the inspection group is improperly constituted. All suspect snubbers are subject to inspection and testing regardless of inspection groupings.

BFN 3.6/4.6-35 Unit 3

ENCLOSURE 2 DESCRIPTION AND JUSTIFICATION BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2 and 3 DESCRIPTIO OF CHANGE TVA proposes to delete the reference to seismic restraints and supports from sections 3.6.H and 4.6.H of the Units 1, 2 and 3 BFN Technical Specifications and appropriately revising the bases for these two sections.

I REASO FOR THE CHANGE The current section 3.6.H is not consistent with industry practice or the GE Standard Technical Specification (NUREG 0123). The 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> currently allowed to replace and/or restore seismic restraints and supports or declare the attached system inoperable is unique to the BFN Technical Specifications. It is unnecessarily restrictive in that it precludes performance of an engineering evaluation to determine system operability. In addition, the surveillance requirements of section 4.6.H are applicable to snubbers only.

JUST F CATION FOR CHANGE The deletion of seismic restraints and supports from section 3.6.H and 4.6.H will totally dedicate these sections to snubbers which is consistent with industry practice and GE Standard Technical Specification.

Pipe supports will not be specifically addressed in the technical specifications. This is consistent with GE Standard Technical Specifications. The technical specifications do define operability for systems. Technical specification definition 1.0.E states, "Implicit in the definition of operability shall be the assumptions that all necessary attendant instrumentation ... or other auxiliary equipment that are required for the system ... to perform its function(s) are also capable of performing their related support functions(s)." Pipe supports, through not explicitly mentioned, must .be capable of performing their function, or the associated system operability requirements are not met.

If a support is found to be damaged, an engineering evaluation would have to be made to determine if the support is capable of performing its function. If the support is judged to be inoperable, the limiting condition for operation (LCO) requirements apply and generally include an allowed outage time for the system or subsystem. If the support/restraint cannot be repaired in the allowable LCO timeframe, then the prescribed action statement(s) must be complied with. A further engineering evaluation may also be performed during the LCO timeframe to justify operability of the affected system. If the engineering evaluation concludes the support has no affect on operability, the system would be operable and the LCO requirements would no longer apply. If an engineering evaluation is used to justify that a damaged or inoperable support does not render the associated system inoperable, the evaluation would have to be completed within the allowable outage time for that system. The allowable outage time for the associated system would be applicable from the point in time that it is recognized that the support is damaged.

P~

4

0 Enc. 2-2 JUSTIFIC TION FOR THE CHANGE (cont'd)

It should be noted that the LCO for snubbers requires restoration and performance of an engineering evaluation on the components to which the inoperable snubbers are attached. The purpose of the engineering evaluation is to determine if the components to which the snubbers are attached were adversely affected by the failed snubber. The technical specification requires that the restoration and engineering evaluation be completed in 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. These requirements do not apply to other supports. Snubbers are active components and can fail by locking up and imposing loads on the piping or attached components not considered in the design of the system. Supports are passive. Damage to structural components should only generally occur because of unusual events while failure of'nubbers is recognized as a probable occurrence. Snubbers have surveillance requirements which confirm their operability; Supports and restraints that are American Society of Mechanical Engineers (ASME) code Class 1, 2 or 3 components are inspected in accordance with Section XI of the ASME Boiler and Pressure Vessel Code as required by 10 CFR 50, Section 50.55a(g) in accordance with BFN Technical Specification 3.6.G. This proposed change does not modify the surveillance requirements under this section in any manner.

The deletion of the outage time (72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />) granted in the technical specifications before entering into the affected system LCO is a conservative change. The use of 'an engineering evaluation to support system operability is consistent with industry practice.

ENCLOSURE 3 DETERMINATION OF NO SIGNIFICANT HAZARDS CONSIDERATION BROWNS FERRY NUCLEAR PLANT (BFN)

UNITS 1, 2 and 3 DISCRIPTION OF AMENDME RE VEST The proposed amendment would change the Technical Specifications, Sections 3.6.H and 4.6.H, of Browns Ferry Nuclear Plant (BFN) Units 1, 2, and 3, to pertain specifically to snubbers and to delete references to seismic restraints and supports from these sections.

NRC has provided standards for determining whether a significant hazards consideration exists as stated in 10 CFR 50.92(c). A proposed amendment to an operating license involves no significant hazards consideration if of the facility in accordance with the proposed amendment would not (1) operation involve a significant increase in the probability or consequence of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from an accident previously evaluated, or (3) involve a significant reduction in a margin of safety.

1. The proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.

Deleting the seismic restraints and supports from these sections of the technical specifications does not invalidate nor change the, calculations or design basis in which BFN was built and licensed. The current BFN technical specification 3.6.H does not provide any surveillance requirements in order to declare seismic restraints and supports operable. If a restraint or support is found to be damaged or there is a question about its ability to perform it function, the operations department will be informed and the operability of the affected system it will be determined. If is determined that the restraint or support will render a technical specification system inoperable, the appropriate system limiting conditions for operation (LCO) will apply.

2. This change does not create the possibility of a new or different kind of accident from an accident previously evaluated.

This proposed change does not add, eliminate, or modify any equipment or operational conditions. These changes still support and are bounded by the design calculations and the Final Safety Analysis Report by which BFN is currently licensed.

Ia

~ ~

5 Enc. 3-2 DESCRIPTIO OF AME MENT RE UEST (cont'd)

3. This change does not involve a significant reduction in a margin of safety.

Although the proposed changes remove the explicit technical specification requirements for seismic restraints and supports, the overall plant margin of safety will be maintained in that restraints and supports will be considered for system operability. As stated above, any restraint or support found to be damaged or otherwise incapable of performing its intended function will be evaluated for operability. If a technical specification system or component is found to be adversely affected, thus rendering it inoperable, the appropriate LCO will be followed until the restraint or support is repaired or an engineering evaluation establishes operability without the need for the damaged support or restraint.

the restraint or support cannot be repaired or operability established If via an engineering evaluation, the appropriate action identified in the technical specification LCO for the associated system will be followed.

Deletion of the restraints and supports from the technical specification also eliminates the requirements to repair them within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> as currently stated. This does not reduce the margin of safety since an evaluation will be performed to determine operability of the system or the system LCO and action statements will be followed. The times allowed by the technical specification for a system to be inoperable have been evaluated by NRC, vendors, and the utility and found to be acceptable as issued and utilized throughout the industry. The definition of operability would require the operator to evaluate and determine system operability if a problem arose with a restraint or support since it be considered a subsystem to the technical specification related piece of would equipment.

Determination of Basis for Pro osed No Si nificant Hazards Since the application for amendment involves a proposed change that is encompassed by the criteria for which no significant hazards consideration exists, TVA has made a proposed determination that the application involves no significant hazards consideration.