ML18058B762: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:.,,::,.-,. :./ ** consumers Power POWERIN& MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 e. -----*--* . Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1993. If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
{{#Wiki_filter:e. -- --- *- * .
:* ., . ' '* . PJ Kl uskowski.
.,,::,.- ,.
Reactor Engineer CC: DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Resident Inspector, Palisades
:./                                 **
_ DRHahn, Div of Rad *Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, P13-121 Administrator, USNRC Document Control, 950*22*35*10/L  
consumers Power POWERIN&
-.-.. -.  
MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1993.
---------------*-
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
150023 9304150102 930331** PDR ADOCK 05000255 R
Sincer~l~'.:'.' :* .,
* P*DR I ()'   
                  ~                      .
-,, ,r ..... ' ---: .... OPERATING DATA REPORT OPERATING STATUS: 1. UNIT NAME Palisades
                                  . '       '*
: 2. REPORTING PERIOD: 930301-930331
PJ Kl uskowski.
: 3. LICENSED THERMAL POYER CMYt) 2530.0 4. NAMEPLATE RATING (GROSS MYe) 811.7 5. DESIGN ELECTRICAL RATING (NET MYe) 805.0 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MYe) **770 7. MAXIMUM DEPENDABLE CAPACITY (NET MYe) **730 -8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE GIVE REASONS: 9. POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe): 10. REASONS FOR RESTRICTIONS, IF ANY: 11. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR YAS CRITICAL 13. REACTOR RESERVE SHUTDOYN HOURS 14. HOURS GENERATOR ON-LINE* 15. UNIT RESERVE SHUTDOYN HOURS 16. GROSS THERMAL ENERGY GENERATED CMYH) 17. GROSS ELECTRICAL ENERGY GENERATED CMYH) 18. NET ELECTRICAL ENERGY GENERATED CMYH) 19. UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) 23. UNIT FORCED OUTAGE RATE This Month 744.0 744.0 744.0 1880544.0 617450.0 588098.0 100.0% 100.0% 108.3% 98.2% 0.0% --LAST REPORT, Yr-to-Date 2160.0 2160.0 2160.0 5458488.0 1794720.0 1709624.0 100.0% 100.0% 108.4% 98.3% 0.0% 24. SHUTDOYNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): 25. IF SHUTDOYN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
Reactor Engineer CC:       DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Pali~ades Resident Inspector, Palisades                             _
DOCKET NO 50-255 DATE 03-31-93 COMPLETED BY SMHaridlovits TELEPHONE (616)764-8913 NOTES: Cumulative 186567.0 105892.6 101366.6 217754460.0 68684903.0 64746704.0 54.3% 54.3% 51.8%* 43.1% 29.9% ____________
DRHahn, Div of Rad *Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, P13-121 Administrator, USNRC Document Control, 950*22*35*10/L
F_or:_ecast
                -.-
_________
                  ..-.-~M~93*10-                            ---------------*-
Ach.i eved ___ _ INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION  
150023 9304150102 930331**
** Based on condenser backpressure
PDR       ADOCK 05000255 R*                             P*DR I
* Yeighted Average (635 MYe used as MDC Net prior to October 1985) ---
()'
... -..........-
 
'* AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH 1993 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 1. 790 2. 791 3. 791 4. 791 5. 791 6. 790 7. 190 8. 791 9. 791 10. 792 11. 792 12. 792 13. 793 14. 793. 15. 791 16. 789 INSTRUCTIONS:  
  - ,,
*----------------
,r. . . '
-*-------------------
:....
DAY 17. 18. 19. 20. 21. 22. 23. 24. 25. 26. 27. 28. 29. 30. 31. DOCKET NO 50-255 UNIT Palisades DATE 04/09/93 COMPLETED BY SMHandlovits TELEPHONE
                                            ---
{616)764-8913 AVERAGE DAILY POWER LEVEL (MWe Net) 792 792 789 792 792 790 790 787 790 784 798 790 787 788 785 --*-------------
OPERATING DATA REPORT
------------
                                                                                            --
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to .the nearest whole megawatt.
DOCKET NO DATE 50-255 03-31-93
;,'. .. ."  
                                                                                                                                  ---
COMPLETED BY SMHaridlovits TELEPHONE (616)764-8913 OPERATING STATUS:
NOTES:
: 1. UNIT NAME                                                   Palisades
: 2. REPORTING PERIOD:                                         930301-930331
: 3. LICENSED THERMAL POYER CMYt)                                   2530.0
: 4. NAMEPLATE RATING (GROSS MYe)                                   811.7
: 5. DESIGN ELECTRICAL RATING (NET MYe)                             805.0
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MYe)                         **770
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MYe)                           **730
          - 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:
: 9. POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe):
: 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month      Yr-to-Date    Cumulative
: 11. HOURS IN REPORTING PERIOD                                 744.0          2160.0      186567.0
: 12. NUMBER OF HOURS REACTOR YAS CRITICAL                       744.0          2160.0      105892.6
: 13. REACTOR RESERVE SHUTDOYN HOURS
: 14. HOURS GENERATOR ON-LINE*                                   744.0          2160.0      101366.6
: 15. UNIT RESERVE SHUTDOYN HOURS
: 16. GROSS THERMAL ENERGY GENERATED CMYH)                   1880544.0        5458488.0  217754460.0
: 17. GROSS ELECTRICAL ENERGY GENERATED CMYH)                 617450.0        1794720.0    68684903.0
: 18. NET ELECTRICAL ENERGY GENERATED CMYH)                   588098.0        1709624.0    64746704.0
: 19. UNIT SERVICE FACTOR                                       100.0%          100.0%          54.3%
: 20. UNIT AVAILABILITY FACTOR                                   100.0%          100.0%          54.3%
: 21. UNIT CAPACITY FACTOR (USING MDC NET)                       108.3%          108.4%          51.8%*
: 22. UNIT CAPACITY FACTOR (USING DER NET)                       98.2%           98.3%           43.1%
: 23. UNIT FORCED OUTAGE RATE                                      0.0%             0.0%         29.9%
: 24.     SHUTDOYNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
: 25. IF SHUTDOYN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
____________ F_or:_ecast _________ Ach.i eved _ _ __
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
          ** Based on condenser backpressure
* Yeighted Average (635 MYe used as MDC Net prior to October 1985)
 
...-..........- '*
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO        50-255 UNIT    Palisades DATE      04/09/93 COMPLETED BY SMHandlovits MONTH MARCH 1993                                                 TELEPHONE {616)764-8913 DAY      AVERAGE DAILY POWER LEVEL                      DAY     AVERAGE DAILY POWER LEVEL (MWe Net)                                           (MWe Net)
: 1.                   790                               17.            792
: 2.                   791                               18.            792
: 3.                   791                               19.            789
: 4.                   791                               20.            792
: 5.                   791                               21.            792
: 6.                   790                              22.            790
: 7.                   190                               23.            790
: 8.                   791                               24.            787
: 9.                   791                               25.            790
: 10.                   792                               26.            784
: 11.                   792                               27.            798
: 12.                   792                               28.            790
: 13.                   793                               29.            787
: 14.                   793.                             30.            788
: 15.                   791                               31.            785
: 16.                   789 INSTRUCTIONS:
                    *- - - - - - - - - - - - - - - - -*-------------------     - - *------------- - - - - - - - - - - - -
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month.           Compute to .the nearest whole megawatt.
 
;,'...."


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month. -----------
OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month.
--------*-----}}
                                        - - ------*-----               -----------}}

Revision as of 18:00, 21 October 2019

Monthly Operating Rept for Mar 1993 for Palisades Nuclear Plant.W/930409 Ltr
ML18058B762
Person / Time
Site: Palisades 
Issue date: 03/31/1993
From: Handlovits S, Kluskowski P
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9304150102
Download: ML18058B762 (4)


Text

e. -- --- *- * .

.,,::,.- ,.

./ **

consumers Power POWERIN&

MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1993.

If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.

Sincer~l~'.:'.' :* .,

~ .

. ' '*

PJ Kl uskowski.

Reactor Engineer CC: DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Pali~ades Resident Inspector, Palisades _

DRHahn, Div of Rad *Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, P13-121 Administrator, USNRC Document Control, 950*22*35*10/L

-.-

..-.-~M~93*10- ---------------*-

150023 9304150102 930331**

PDR ADOCK 05000255 R* P*DR I

()'

- ,,

,r. . . '

....

---

OPERATING DATA REPORT

--

DOCKET NO DATE 50-255 03-31-93

---

COMPLETED BY SMHaridlovits TELEPHONE (616)764-8913 OPERATING STATUS:

NOTES:

1. UNIT NAME Palisades
2. REPORTING PERIOD: 930301-930331
3. LICENSED THERMAL POYER CMYt) 2530.0
4. NAMEPLATE RATING (GROSS MYe) 811.7
5. DESIGN ELECTRICAL RATING (NET MYe) 805.0
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MYe) **770
7. MAXIMUM DEPENDABLE CAPACITY (NET MYe) **730

- 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:

9. POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe):
10. REASONS FOR RESTRICTIONS, IF ANY:

This Month Yr-to-Date Cumulative

11. HOURS IN REPORTING PERIOD 744.0 2160.0 186567.0
12. NUMBER OF HOURS REACTOR YAS CRITICAL 744.0 2160.0 105892.6
13. REACTOR RESERVE SHUTDOYN HOURS
14. HOURS GENERATOR ON-LINE* 744.0 2160.0 101366.6
15. UNIT RESERVE SHUTDOYN HOURS
16. GROSS THERMAL ENERGY GENERATED CMYH) 1880544.0 5458488.0 217754460.0
17. GROSS ELECTRICAL ENERGY GENERATED CMYH) 617450.0 1794720.0 68684903.0
18. NET ELECTRICAL ENERGY GENERATED CMYH) 588098.0 1709624.0 64746704.0
19. UNIT SERVICE FACTOR 100.0% 100.0% 54.3%
20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 54.3%
21. UNIT CAPACITY FACTOR (USING MDC NET) 108.3% 108.4% 51.8%*
22. UNIT CAPACITY FACTOR (USING DER NET) 98.2% 98.3% 43.1%
23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 29.9%
24. SHUTDOYNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
25. IF SHUTDOYN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

____________ F_or:_ecast _________ Ach.i eved _ _ __

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

    • Based on condenser backpressure
  • Yeighted Average (635 MYe used as MDC Net prior to October 1985)

...-..........- '*

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 04/09/93 COMPLETED BY SMHandlovits MONTH MARCH 1993 TELEPHONE {616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)

1. 790 17. 792
2. 791 18. 792
3. 791 19. 789
4. 791 20. 792
5. 791 21. 792
6. 790 22. 790
7. 190 23. 790
8. 791 24. 787
9. 791 25. 790
10. 792 26. 784
11. 792 27. 798
12. 792 28. 790
13. 793 29. 787
14. 793. 30. 788
15. 791 31. 785
16. 789 INSTRUCTIONS:
  • - - - - - - - - - - - - - - - - -*------------------- - - *------------- - - - - - - - - - - - -

On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to .the nearest whole megawatt.

,'...."

SUMMARY

OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month.

- - ------*----- -----------