ML18058B762: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:.,,::,.-,. :./ ** consumers Power POWERIN& MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 | {{#Wiki_filter:e. -- --- *- * . | ||
:* ., . ' '* | .,,::,.- ,. | ||
Reactor Engineer CC: DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Resident Inspector, Palisades | :./ ** | ||
consumers Power POWERIN& | |||
-.-.. -. | MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1993. | ||
---------------*- | If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113. | ||
150023 9304150102 930331** PDR ADOCK 05000255 R | Sincer~l~'.:'.' :* ., | ||
* P*DR I ()' | ~ . | ||
-,, ,r | . ' '* | ||
: 2. REPORTING PERIOD: 930301-930331 | PJ Kl uskowski. | ||
: 3. LICENSED THERMAL POYER CMYt) 2530.0 4. NAMEPLATE RATING (GROSS MYe) 811.7 5. DESIGN ELECTRICAL RATING (NET MYe) 805.0 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MYe) **770 7. MAXIMUM DEPENDABLE CAPACITY (NET MYe) **730 -8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE GIVE REASONS: 9. POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe): 10. REASONS FOR RESTRICTIONS, IF ANY: 11. HOURS IN REPORTING PERIOD 12. NUMBER OF HOURS REACTOR YAS CRITICAL 13. REACTOR RESERVE SHUTDOYN HOURS 14. HOURS GENERATOR ON-LINE* 15. UNIT RESERVE SHUTDOYN HOURS 16. GROSS THERMAL ENERGY GENERATED CMYH) 17. GROSS ELECTRICAL ENERGY GENERATED CMYH) 18. NET ELECTRICAL ENERGY GENERATED CMYH) 19. UNIT SERVICE FACTOR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPACITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACTOR (USING DER NET) | Reactor Engineer CC: DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Pali~ades Resident Inspector, Palisades _ | ||
DRHahn, Div of Rad *Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, P13-121 Administrator, USNRC Document Control, 950*22*35*10/L | |||
F_or:_ecast | -.- | ||
_________ | ..-.-~M~93*10- ---------------*- | ||
Ach.i eved | 150023 9304150102 930331** | ||
** Based on condenser backpressure | PDR ADOCK 05000255 R* P*DR I | ||
* Yeighted Average (635 MYe used as MDC Net prior to October 1985) | ()' | ||
... -..........- | |||
'* AVERAGE DAILY UNIT POWER LEVEL MONTH MARCH 1993 DAY AVERAGE DAILY POWER LEVEL (MWe Net) 1. 790 2. 791 3. 791 4. 791 5. 791 6. 790 7. 190 8. 791 9. 791 10. 792 11. 792 12. 792 13. 793 14. 793. 15. 791 16. 789 INSTRUCTIONS: | - ,, | ||
*---------------- | ,r. . . ' | ||
-*------------------- | :.... | ||
--- | |||
OPERATING DATA REPORT | |||
------------ | -- | ||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to .the nearest whole megawatt. | DOCKET NO DATE 50-255 03-31-93 | ||
;,'. .. ." | --- | ||
COMPLETED BY SMHaridlovits TELEPHONE (616)764-8913 OPERATING STATUS: | |||
NOTES: | |||
: 1. UNIT NAME Palisades | |||
: 2. REPORTING PERIOD: 930301-930331 | |||
: 3. LICENSED THERMAL POYER CMYt) 2530.0 | |||
: 4. NAMEPLATE RATING (GROSS MYe) 811.7 | |||
: 5. DESIGN ELECTRICAL RATING (NET MYe) 805.0 | |||
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MYe) **770 | |||
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MYe) **730 | |||
- 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS: | |||
: 9. POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe): | |||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | |||
This Month Yr-to-Date Cumulative | |||
: 11. HOURS IN REPORTING PERIOD 744.0 2160.0 186567.0 | |||
: 12. NUMBER OF HOURS REACTOR YAS CRITICAL 744.0 2160.0 105892.6 | |||
: 13. REACTOR RESERVE SHUTDOYN HOURS | |||
: 14. HOURS GENERATOR ON-LINE* 744.0 2160.0 101366.6 | |||
: 15. UNIT RESERVE SHUTDOYN HOURS | |||
: 16. GROSS THERMAL ENERGY GENERATED CMYH) 1880544.0 5458488.0 217754460.0 | |||
: 17. GROSS ELECTRICAL ENERGY GENERATED CMYH) 617450.0 1794720.0 68684903.0 | |||
: 18. NET ELECTRICAL ENERGY GENERATED CMYH) 588098.0 1709624.0 64746704.0 | |||
: 19. UNIT SERVICE FACTOR 100.0% 100.0% 54.3% | |||
: 20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 54.3% | |||
: 21. UNIT CAPACITY FACTOR (USING MDC NET) 108.3% 108.4% 51.8%* | |||
: 22. UNIT CAPACITY FACTOR (USING DER NET) 98.2% 98.3% 43.1% | |||
: 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 29.9% | |||
: 24. SHUTDOYNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH): | |||
: 25. IF SHUTDOYN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | |||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | |||
____________ F_or:_ecast _________ Ach.i eved _ _ __ | |||
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION | |||
** Based on condenser backpressure | |||
* Yeighted Average (635 MYe used as MDC Net prior to October 1985) | |||
...-..........- '* | |||
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 04/09/93 COMPLETED BY SMHandlovits MONTH MARCH 1993 TELEPHONE {616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) | |||
: 1. 790 17. 792 | |||
: 2. 791 18. 792 | |||
: 3. 791 19. 789 | |||
: 4. 791 20. 792 | |||
: 5. 791 21. 792 | |||
: 6. 790 22. 790 | |||
: 7. 190 23. 790 | |||
: 8. 791 24. 787 | |||
: 9. 791 25. 790 | |||
: 10. 792 26. 784 | |||
: 11. 792 27. 798 | |||
: 12. 792 28. 790 | |||
: 13. 793 29. 787 | |||
: 14. 793. 30. 788 | |||
: 15. 791 31. 785 | |||
: 16. 789 INSTRUCTIONS: | |||
*- - - - - - - - - - - - - - - - -*------------------- - - *------------- - - - - - - - - - - - - | |||
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to .the nearest whole megawatt. | |||
;,'...." | |||
==SUMMARY== | ==SUMMARY== | ||
OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month. ----------- | OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month. | ||
-------- | - - ------*----- -----------}} | ||
Revision as of 18:00, 21 October 2019
| ML18058B762 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/31/1993 |
| From: | Handlovits S, Kluskowski P CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9304150102 | |
| Download: ML18058B762 (4) | |
Text
e. -- --- *- * .
.,,::,.- ,.
- ./ **
consumers Power POWERIN&
MICHl&AN'S PRO&RESS Palisades Nuclear Plant: 27780 Blue Star Memorial Highway, Covert. Ml 49043 April 9, 1993 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 LICENSEE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and Summary of Operating Experience for the Palisades Nuclear Plant for the month of March, 1993.
If you have any questions or concerns, please feel free to contact me at (616) 764-8913, extension 0113.
Sincer~l~'.:'.' :* .,
~ .
. ' '*
PJ Kl uskowski.
Reactor Engineer CC: DPHoffman, P26-117B ABDavis, USNRC JLKuemin, Pali~ades Resident Inspector, Palisades _
DRHahn, Div of Rad *Health Services, Lansing, MI BWJorgensen, Michigan Dept of Labor, Lansing, MI JPadgett, Michigan Public Service Commission Records Center, INPO, Atlanta, GA RWTaylor, CE, Palisades MPKnopp, Palisades SMMcintyre, P13-121 Administrator, USNRC Document Control, 950*22*35*10/L
-.-
..-.-~M~93*10- ---------------*-
150023 9304150102 930331**
PDR ADOCK 05000255 R* P*DR I
()'
- ,,
,r. . . '
- ....
---
OPERATING DATA REPORT
--
DOCKET NO DATE 50-255 03-31-93
---
COMPLETED BY SMHaridlovits TELEPHONE (616)764-8913 OPERATING STATUS:
NOTES:
- 1. UNIT NAME Palisades
- 2. REPORTING PERIOD: 930301-930331
- 3. LICENSED THERMAL POYER CMYt) 2530.0
- 4. NAMEPLATE RATING (GROSS MYe) 811.7
- 5. DESIGN ELECTRICAL RATING (NET MYe) 805.0
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MYe) **770
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MYe) **730
- 8. IF CHANGES OCCUR IN CAPCITY RATINGS (ITEM NUMBERS 3 AND 7) SINCE LAST REPORT, GIVE REASONS:
- 9. POYER LEVEL TO YHICH RESTRICTED, IF ANY (NET MYe):
- 10. REASONS FOR RESTRICTIONS, IF ANY:
This Month Yr-to-Date Cumulative
- 11. HOURS IN REPORTING PERIOD 744.0 2160.0 186567.0
- 12. NUMBER OF HOURS REACTOR YAS CRITICAL 744.0 2160.0 105892.6
- 13. REACTOR RESERVE SHUTDOYN HOURS
- 14. HOURS GENERATOR ON-LINE* 744.0 2160.0 101366.6
- 15. UNIT RESERVE SHUTDOYN HOURS
- 16. GROSS THERMAL ENERGY GENERATED CMYH) 1880544.0 5458488.0 217754460.0
- 17. GROSS ELECTRICAL ENERGY GENERATED CMYH) 617450.0 1794720.0 68684903.0
- 18. NET ELECTRICAL ENERGY GENERATED CMYH) 588098.0 1709624.0 64746704.0
- 19. UNIT SERVICE FACTOR 100.0% 100.0% 54.3%
- 20. UNIT AVAILABILITY FACTOR 100.0% 100.0% 54.3%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 108.3% 108.4% 51.8%*
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.2% 98.3% 43.1%
- 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 29.9%
- 24. SHUTDOYNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE AND DURATION OF EACH):
- 25. IF SHUTDOYN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
____________ F_or:_ecast _________ Ach.i eved _ _ __
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure
- Yeighted Average (635 MYe used as MDC Net prior to October 1985)
...-..........- '*
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 04/09/93 COMPLETED BY SMHandlovits MONTH MARCH 1993 TELEPHONE {616)764-8913 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net)
- 1. 790 17. 792
- 2. 791 18. 792
- 3. 791 19. 789
- 4. 791 20. 792
- 5. 791 21. 792
- 6. 790 22. 790
- 7. 190 23. 790
- 8. 791 24. 787
- 9. 791 25. 790
- 10. 792 26. 784
- 11. 792 27. 798
- 12. 792 28. 790
- 13. 793 29. 787
- 14. 793. 30. 788
- 15. 791 31. 785
- 16. 789 INSTRUCTIONS:
- - - - - - - - - - - - - - - - - -*------------------- - - *------------- - - - - - - - - - - - -
On this format, list the average daily unit power level in MWe-NET for each day in the reporting month. Compute to .the nearest whole megawatt.
- ,'...."
SUMMARY
OF OPERATING EXPERIENCE FOR MARCH 1993 The unit operated at full power for the entire month.
- - ------*----- -----------