ML18139B737: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:.,* | ||
VIRGINIA 2 3 2 61 R. H. LEA.SBUBG Vxon PRESXDENT NUCLE4R OPERATIONS Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555 | v' e | ||
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,. VIRGINIA 2 3 2 61 R. H. LEA.SBUBG Vxon PRESXDENT NUCLE4R OPERATIONS February 8, 1982 Mr. H. R. Denton, Director Serial No. 065 Office of Nuclear Reactor Regulation FR/CTS:ceb Attn: Mr. Steven A. Varga, Chief Docket No.: 50-281 Operating Reactors Branch No. 1 Division of Licensing License No.: DPR-37 U. S. Nuclear Regulatory Commission Washington, D. C. 20555 | |||
==Dear Sir:== | ==Dear Sir:== | ||
SURRY POWER STATION | |||
Should you have any questions on these test results, do not hesitate to contact us. Attachment cc: Mr. James P. O'Reilly Office of Inspection and Enforcement Region II ('8202190177 820208 /: J:>DR ADOCK 05000281 >-,P. * ' . PDR | SURRY POWER STATION UNIT 2,. CYCLE 6 STARTUP PHYSICS ROD SWAP RESULTS In our letter to you dated January 16, 1982 {Serial No. 023), | ||
we stated our intention to submit a test results summary report to the NRC within 45 days after the first use of rod swap for each unit. The control rod reactivity worth testing, using the rod swap technique, was completed on December 31, 1981 for Surry Unit 2,. Cycle 6. Attachment 1 summarizes the measured rod swap test results, and shows that all measured values were within the established review criteria. | |||
e e ATTACHMENT 1 SURRY UNIT 2, CYCLE 6 MEASURED ROD SWAP REACTIVITY WORTH Reference Bank | Should you have any questions on these test results, do not hesitate to contact us. | ||
Very.'AAtr, y .r ou~s, JJ!l ,' | |||
-3.5% -5.1% 33 pcm -6.4% +7.3% -0.3% | /!fll R. H. Leasburg r' | ||
Attachment cc: Mr. James P. O'Reilly Office of Inspection and Enforcement Region II | |||
('8202190177 820208 | |||
/: J:>DR ADOCK 05000281 | |||
>-,P. * ' . PDR | |||
e e ATTACHMENT 1 SURRY UNIT 2, CYCLE 6 MEASURED ROD SWAP REACTIVITY WORTH Measured Predicted Review Reference Bank Worth (pcm) Worth (pcm) Difference Criterion 1371 1355 +1. 2% +10% | |||
Measured Predicted Review Test Bank Worth (pcm) Worth (pcm) Difference Criteria D 1115 1156 -3.5% +15% | |||
C 793 836 -5.1% +15% | |||
A 595 562 33 pcm 100 pcm SB 848 906 -6.4% +15% | |||
SA 1134 1057 +7.3% +15% | |||
Total 5856 5872 -0.3% +10%}} | |||
Revision as of 02:05, 21 October 2019
| ML18139B737 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 02/08/1982 |
| From: | Leasburg R VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, Varga S Office of Nuclear Reactor Regulation |
| References | |
| 065, 65, NUDOCS 8202190177 | |
| Download: ML18139B737 (2) | |
Text
.,*
v' e
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND,. VIRGINIA 2 3 2 61 R. H. LEA.SBUBG Vxon PRESXDENT NUCLE4R OPERATIONS February 8, 1982 Mr. H. R. Denton, Director Serial No. 065 Office of Nuclear Reactor Regulation FR/CTS:ceb Attn: Mr. Steven A. Varga, Chief Docket No.: 50-281 Operating Reactors Branch No. 1 Division of Licensing License No.: DPR-37 U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Sir:
SURRY POWER STATION UNIT 2,. CYCLE 6 STARTUP PHYSICS ROD SWAP RESULTS In our letter to you dated January 16, 1982 {Serial No. 023),
we stated our intention to submit a test results summary report to the NRC within 45 days after the first use of rod swap for each unit. The control rod reactivity worth testing, using the rod swap technique, was completed on December 31, 1981 for Surry Unit 2,. Cycle 6. Attachment 1 summarizes the measured rod swap test results, and shows that all measured values were within the established review criteria.
Should you have any questions on these test results, do not hesitate to contact us.
Very.'AAtr, y .r ou~s, JJ!l ,'
/!fll R. H. Leasburg r'
Attachment cc: Mr. James P. O'Reilly Office of Inspection and Enforcement Region II
('8202190177 820208
/: J:>DR ADOCK 05000281
>-,P. * ' . PDR
e e ATTACHMENT 1 SURRY UNIT 2, CYCLE 6 MEASURED ROD SWAP REACTIVITY WORTH Measured Predicted Review Reference Bank Worth (pcm) Worth (pcm) Difference Criterion 1371 1355 +1. 2% +10%
Measured Predicted Review Test Bank Worth (pcm) Worth (pcm) Difference Criteria D 1115 1156 -3.5% +15%
C 793 836 -5.1% +15%
A 595 562 33 pcm 100 pcm SB 848 906 -6.4% +15%
SA 1134 1057 +7.3% +15%
Total 5856 5872 -0.3% +10%