ML18219D832: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM<RIDS), DISTRIBUTION FOR INCOMING MATERIAL 50-315 REC: KEPPLER J G NRC ORG: SHALLER D V IN 8(MI PWR DOCDATE: 02/23/78 l3ATE RCVD: 02/27f 78 COPIES RECEIVED LTR 1 ENCL 0 DOCTYPE: I ETTER NOTARIZED:
{{#Wiki_filter:REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)
NO  
        , DISTRIBUTION FOR INCOMING MATERIAL                           50-315 REC:   KEPPLER J G               ORG:   SHALLER D V                     DOCDATE: 02/23/78 NRC                              IN  8( MI PWR                      l3ATE RCVD: 02/ 27f 78 DOCTYPE: I ETTER     NOTARIZED: NO                                         COPIES RECEIVED


==SUBJECT:==
==SUBJECT:==
CONFIRMING VERBAL REPT TO NRC ON 02/23/78 CONCERNING BOTH ENGINNERED SAFEGUARD FANS WERE INOPERABLE FOR A PERIOD OF THREE HOURS AND 14 MINUTES...
LTR 1      ENCL 0 CONFIRMING VERBAL REPT TO NRC ON 02/23/78 CONCERNING BOTH ENGINNERED SAFEGUARD FANS WERE INOPERABLE FOR A PERIOD OF THREE HOURS AND 14 MINUTES... ADVISING FOLLOWUP REPT WILL BE SUBMITTED BY 03/07/78.
ADVISING FOLLOWUP REPT WILL BE SUBMITTED BY 03/07/78.PLANT NAME: COOK-UNIT 1 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL: DISTRIBUTION OF'THIS MATERIAL IS AS FOLLOWS+++++>>>>+>>>>>>>+
PLANT NAME: COOK UNIT     1                                 REVIEWER   INITIAL: X JM DISTRIBUTOR     INITIAL:
INCIDENT REPORTS (DISTRIBUTION CODE AQ02)FOR ACTION: BR (4+LTR ONLY<4)INTERNAL: FXTERNAL: REG FILE+~~l TR ONLY(SCHROEDER/IPPOLITQ~4~LTR ONLY(1)NOVAK/CHECK++LTR ONLY(i>KNIGHT4+LTR ONLY<1)HANAUER~HILTR ONLY(l>EISENHUT++LTR ONLY(i)SHAO++LTR ONLY(l)KREGER/J.COLLINS<+LTR ONLY<1)K SEYFRIT/IE+~LTR QNLY(i)LPDR'S ST.JQSEPHr MI++LTR ONLY<1)TI C+4~LTR ONLY (1>NSIC<+LTR ONLY<1)ACRS, CAT B++LTR ONLY(16>NRC PDR%%LTR ONLY<1)MIPC+~LTR ONLY(3)HOUSTON~~+I.
DISTRIBUTION OF 'THIS MATERIAL IS AS FOLLOWS +++++>>>>+>>>>>>>+
TR ONLY<1)GRIMES++LTR ONLY'(1>BUTLER+4LTR ONLY(3.)TEDESCO+4ILTR ONLY(i>BAER44LTR ONLY<i)VOLLMER/BUNCH++LTR ONLY(1>ROSA++LTR ONLY (1)COPIES ViOT REGULATORY SURIIITTED PER I GUIDE 10.1 DISTRIBUTION:
INCIDENT REPORTS (DISTRIBUTION CODE AQ02)
LTR 45 ENCL 0 SIZE:%4M%%%%%%%%%%%%4%%%%8M%4%%%%0F+0FRM%%
FOR ACTION:       BR (                   4+LTR ONLY<4)
THE ENI3 CONTROL NBR: 780590041 4h-f 0 a~b II'I 8 g 8~~srksn~ecerio swor y SEC III:I",uZ~IIZV I.,'"!:Zjl
INTERNAL:         REG FILE+~~l TR ONLY(                 NRC PDR%%LTR ONLY< 1)
~II..gIIIIt IIIIDIAItIA 8 NICHIGAN PONEB COPSPAiJJY DONALD C.COOK NUCLEAR PLANT P.O.Box 458, Bridgman, Michigan 49106 February 23, 1978 Nr.J.G.Keppler, Regional Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137
MIPC+~LTR ONLY(3)
SCHROEDER/IPPOLITQ~4~LTR ONLY( 1) HOUSTON~~+I. TR ONLY< 1)
NOVAK/CHECK++LTR ONLY(i>             GRIMES++LTR ONLY'(1 >
KNIGHT4+LTR ONLY< 1)                 BUTLER+4LTR ONLY(3.)
HANAUER~HILTR ONLY(l>                 TEDESCO+4ILTR ONLY(i>
EISENHUT++LTR ONLY(i)                 BAER44LTR ONLY<i)
SHAO++LTR ONLY(l)                     VOLLMER/BUNCH++LTR ONLY(1>
KREGER/ J. COLLINS< +LTR ONLY < 1 ) ROSA++LTR ONLY ( 1 )
K SEYFRIT/IE+~LTR QNLY(i)
FXTERNAL:        LPDR'S ST. JQSEPHr MI++LTR ONLY <   1 )
TI C+4~LTR ONLY ( 1 >
NSIC<+LTR ONLY< 1)
ACRS, CAT B++LTR ONLY(16>
COPIES ViOT SURIIITTED PER I
REGULATORY GUIDE   10.1 DISTRIBUTION:     LTR 45     ENCL 0                           CONTROL NBR:      780590041 SIZE:
%4M%%%%%%%%%%%%4%%%%8M%4%%%%0F+0FRM%%         THE ENI3 4h-f


==Dear Hr.Keppler:==
0    ~b a
iso Pj l rg)ly 8'perating License DPR-58 Docket No.50-315 This is to confirm our verbal report to NRC Region III Inspector, Hr.K.R.Baker, at 1030 hours on February 23, 1978.At that time we reported that both Engineered Safeguard Fans were inoperable for a period of three hours and 14 minutes.A followup report will be submitted by Harch 7, 1978, as required by Regulatory Guide 1.16, Revision 4, Section 2.a.Sincerely, D.Y.Shaller Plant Hanager/bab cc: J.E.Dolan R.ll.Jurgensen G.E.Lien R.Kilburn R.J.Yollen BPI K.R.Baker RO:III R.C.Callen HPSC P.H.Steketee, Esq.R.Halsh, Esq.G.Charnoff, Esq.G.Olson J.H.Hennigan PNSRC J.F.Stietzel Dir., IE (40 copies)Dir., NIPC (4 copies)78O59004i o.'}}
II
        'I 8
 
g 8 ~  ~
srksn
      ~ecerio III:I",uZ~IIZVI.,'"!:Zjl ~II..gIIIIt swor      IIIIDIAItIA8 NICHIGANPONEB COPSPAiJJY y SEC DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 February 23, 1978 Nr. J.G. Keppler, Regional Director                                              iso Office of Inspection and Enforcement                                                            Pj United States Nuclear Regulatory Commission Region    III                                                          l rg)     ly 799  Roosevelt Road Glen  Ellyn, IL    60137 8'perating License DPR-58 Docket No. 50-315
 
==Dear Hr. Keppler:==
 
This is to confirm our verbal report to NRC Region             III Inspector, Hr. K.R. Baker, at 1030 hours on February 23, 1978.
At that time     we reported that both Engineered Safeguard Fans were inoperable     for a period of three hours and 14 minutes.
A followup report will be submitted by Harch 7, 1978,           as required by Regulatory Guide 1. 16, Revision 4, Section 2.a.
Sincerely, D.Y. Shaller Plant Hanager
            /bab cc:   J.E. Dolan R.ll. Jurgensen G.E. Lien R. Kilburn R.J. Yollen BPI K.R. Baker RO:III R.C. Callen HPSC P.H. Steketee, Esq.
R. Halsh, Esq.                                                         o.'
G. Charnoff, Esq.
G. Olson                                   78O59004i J.H. Hennigan PNSRC J.F. Stietzel Dir.,   IE (40 copies)
Dir.,   NIPC (4   copies)}}

Latest revision as of 18:43, 20 October 2019

Confirming Verbal Report on 2/23/1978, Concerning Both Engineered Safeguard Fans Were Inoperable for a Period of 3 Hours & 14 Minutes
ML18219D832
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/23/1978
From: Shaller D
Indiana Michigan Power Co, (Formerly Indiana & Michigan Power Co), American Electric Power Service Corp, American Electric Power Company
To: James Keppler
NRC/RGN-III
References
Download: ML18219D832 (3)


Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM <RIDS)

, DISTRIBUTION FOR INCOMING MATERIAL 50-315 REC: KEPPLER J G ORG: SHALLER D V DOCDATE: 02/23/78 NRC IN 8( MI PWR l3ATE RCVD: 02/ 27f 78 DOCTYPE: I ETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 0 CONFIRMING VERBAL REPT TO NRC ON 02/23/78 CONCERNING BOTH ENGINNERED SAFEGUARD FANS WERE INOPERABLE FOR A PERIOD OF THREE HOURS AND 14 MINUTES... ADVISING FOLLOWUP REPT WILL BE SUBMITTED BY 03/07/78.

PLANT NAME: COOK UNIT 1 REVIEWER INITIAL: X JM DISTRIBUTOR INITIAL:

DISTRIBUTION OF 'THIS MATERIAL IS AS FOLLOWS +++++>>>>+>>>>>>>+

INCIDENT REPORTS (DISTRIBUTION CODE AQ02)

FOR ACTION: BR ( 4+LTR ONLY<4)

INTERNAL: REG FILE+~~l TR ONLY( NRC PDR%%LTR ONLY< 1)

MIPC+~LTR ONLY(3)

SCHROEDER/IPPOLITQ~4~LTR ONLY( 1) HOUSTON~~+I. TR ONLY< 1)

NOVAK/CHECK++LTR ONLY(i> GRIMES++LTR ONLY'(1 >

KNIGHT4+LTR ONLY< 1) BUTLER+4LTR ONLY(3.)

HANAUER~HILTR ONLY(l> TEDESCO+4ILTR ONLY(i>

EISENHUT++LTR ONLY(i) BAER44LTR ONLY<i)

SHAO++LTR ONLY(l) VOLLMER/BUNCH++LTR ONLY(1>

KREGER/ J. COLLINS< +LTR ONLY < 1 ) ROSA++LTR ONLY ( 1 )

K SEYFRIT/IE+~LTR QNLY(i)

FXTERNAL: LPDR'S ST. JQSEPHr MI++LTR ONLY < 1 )

TI C+4~LTR ONLY ( 1 >

NSIC<+LTR ONLY< 1)

ACRS, CAT B++LTR ONLY(16>

COPIES ViOT SURIIITTED PER I

REGULATORY GUIDE 10.1 DISTRIBUTION: LTR 45 ENCL 0 CONTROL NBR: 780590041 SIZE:

%4M%%%%%%%%%%%%4%%%%8M%4%%%%0F+0FRM%% THE ENI3 4h-f

0 ~b a

II

'I 8

g 8 ~ ~

srksn

~ecerio III:I",uZ~IIZVI.,'"!:Zjl ~II..gIIIIt swor IIIIDIAItIA8 NICHIGANPONEB COPSPAiJJY y SEC DONALD C. COOK NUCLEAR PLANT P.O. Box 458, Bridgman, Michigan 49106 February 23, 1978 Nr. J.G. Keppler, Regional Director iso Office of Inspection and Enforcement Pj United States Nuclear Regulatory Commission Region III l rg) ly 799 Roosevelt Road Glen Ellyn, IL 60137 8'perating License DPR-58 Docket No. 50-315

Dear Hr. Keppler:

This is to confirm our verbal report to NRC Region III Inspector, Hr. K.R. Baker, at 1030 hours0.0119 days <br />0.286 hours <br />0.0017 weeks <br />3.91915e-4 months <br /> on February 23, 1978.

At that time we reported that both Engineered Safeguard Fans were inoperable for a period of three hours and 14 minutes.

A followup report will be submitted by Harch 7, 1978, as required by Regulatory Guide 1. 16, Revision 4, Section 2.a.

Sincerely, D.Y. Shaller Plant Hanager

/bab cc: J.E. Dolan R.ll. Jurgensen G.E. Lien R. Kilburn R.J. Yollen BPI K.R. Baker RO:III R.C. Callen HPSC P.H. Steketee, Esq.

R. Halsh, Esq. o.'

G. Charnoff, Esq.

G. Olson 78O59004i J.H. Hennigan PNSRC J.F. Stietzel Dir., IE (40 copies)

Dir., NIPC (4 copies)