{{#Wiki_filter:Good afternoon, and thank you for joining the webinar.  
{{#Wiki_filter:WEBINAR TRANSCRIPT This document provides the transcript from a public meeting (webinar) that was held on June 3, 2019, to update the public on the status of fuel loading at the San Onofre Nuclear Generating Station. Fuel transfer operations were suspended following an August 3, 2018, incident that resulted in the misalignment of a multi-purpose canister loaded with spent fuel at the San Onofre Nuclear Generating Station.
Hosts of Webinar:
Linda Howell, Acting Director Division of Nuclear Materials Safety Region IV Lee Brookhart, Senior ISFSI Inspector Reactor Inspection Branch Division of Nuclear Materials Safety Region IV


My name is Linda Howell, I'm the Acting Director of Region IV's Division of Nuclear Material Safety.  
Good afternoon, and thank you for joining the webinar.
My name is Linda Howell, I'm the Acting Director of Region IV's Division of Nuclear Material Safety.
With me is Mr. Lee Brookhart, the region's Senior Dry Fuel Storage Inspector.
The purpose of this afternoon's meeting is to share information concerning NRC's evaluation of the final outstanding issue that I briefed you on back in March, which involves changes or exceptions planned for the UMAX Final Safety Analysis Report to accept that minor scratching might occur as the result of incidental contact between the multipurpose canisters and internal components of storage vaults in the UMAX dry fuel storage system.
Our discussion this afternoon will also cover the process that we used to make the determination that Southern California Edison could resume fuel transfer operations, and I will talk briefly about some activities that Southern California Edison has identified


With me is Mr. Lee Brookhart, the region's Senior Dry
as needing to occur before they begin active fuel transfer operations.
Next slide please.
As you see on the agenda, following discussion regarding NRC's decision on the resumption of fuel transfer operations we'll open the meeting to accept questions from our audience.
This is a Category 3 meeting, so public participation is encouraged.
However, due to the period of time that we have reserved for this webinar, and in the interest of fairness to all participants, I would like to ask that audience members limit their questions to two, initially, so that we can address questions from as many participants as possible in the time allotted.
As we've done in the past, questions and comments from today's session will be posted to our Spotlight page.
I acknowledge that several of you have provided feedback on our delay in responding to your questions from prior webinars, but we do have those in process now.
Up until now, our staff has been fully occupied with


Fuel Storage Inspector.  
inspecting SONGS efforts.
I'll also note that in addition to today's webinar Scott Morris, our Regional Administrator, and I will also be speaking at the San Onofre Community Engagement Panel meeting this coming Wednesday, June 5th.
We look forward to meeting with some of you directly and answering any questions that you may have.
Next slide please.
In the event of an emergency, all of us in the room will stay together and exit the building through the front doors.
We'll remain in the parking lot until the situation is over and we're allowed to reenter the building.
We will provide notification to the audience participants in the event that we do have an emergency.
Let me also ask the staff in the room to silence your cellphones during the meeting and please keep your voices down because the meeting is being recorded.
Lastly, be mindful that the meeting is being broadcast, so if individuals present need to exit the room,


The purpose of this afternoon's meeting is to share information concerning NRC's evaluation
please use the rear doors.
As noted in the slides, should we have technical difficulties with the webinar broadcast, a telephone bridge will be available.
The phone number for that bridge is on the slide.
The bridge line will only be activated if we experience technical difficulties with the broadcast.
These slides are available on the Spotlight portion of the NRC public webpage at www.nrc.gov.
From the Spotlight section on the left side of the page click on "SONGS Cask Loading Issue".
You'll find a file name with the NRC webinar presentation on our final determination on fuel loading operations.
The slides are also already available on the NRC's Agency-wide Document Access and Management System, or ADAMS.
The video and transcript from today's meeting will also be posted to the Spotlight section of our webpage.
In addition we'll post the comments and questions that we receive this afternoon.
Please note that the transcript of the meeting


of the final outstanding issue
and the questions will take a few weeks to be posted since NRC must receive the transcript from the contractor who is providing the webinar service, and review both the transcript and questions to ensure accuracy of the information.
We are also required by the Americans with Disabilities Act to provide closed captioning for the video.
We apologize in advance for the delays and inconvenience, but we cannot control or expedite this process.
Those of you who have registered for the webinar, however, will be able to access the video shortly after the conclusion of the meeting.
During the presentation, you may submit written comments and questions via the webinar chat room feature.
We'll answer questions and respond to comments as time allows.
This webinar is scheduled to end at 1 p.m. Pacific Time.
Next slide please.
I expect that many of you here today are familiar with the August 3rd incident


that I briefed you on back in March, which involves changes
that occurred at San Onofre.
But because we have some attendees that have not followed this particular event and follow-on activities closely, I am going to provide a brief overview of key activities that have occurred since August 3, 2018.
On August 3rd, Southern California Edison was lowering a loaded spent fuel canister into its underground storage vault.
For the current fuel offload for Units 2 and 3, Southern California Edison is using the HI-STORM UMAX dry fuel storage system designed by Holtec International which provides dry spent fuel storage in a vertical below grade configuration.
As that canister was being lowered into the storage vault, the licensee personnel failed to notice that the canister was misaligned and was not being properly lowered.
Licensee personnel continued to lower the lifting equipment until they believed that the canister was fully lowered into the bottom of the storage vault.
As the staff prepared to approach the ISFSI pad, a radiation protection technician


or exceptions planned
identified elevated radiation levels that were not consistent with a fully-lowered canister.
Licensee personnel participating in the evolution then identified that the loaded spent fuel canister was resting on a metal shield ring near the top of the storage vault, preventing it from being lowered, and that the rigging was completely slack, no longer bearing the load of the canister.
With the vertical cask transfer system lift beam completely lowered, and that equipment is used to lower and lift canisters into and from the storage vaults, the important-to-safety slings were disabled from performing their safety function of suspending and controlling the loaded spent fuel canister.
The licensee estimated that the canister could have experienced an approximate 17 to 18 foot drop into the storage vault if the canister had slipped off the metal ring or if the metal ring failed.
This load drop accident is not a condition analyzed


for the UMAX Final Safety Analysis Report to accept that minor scratching might occur
in the dry fuel storage system's Final Safety Analysis Report, which is tied to the Certificate of Compliance or the licensing document.
The licensee estimated that the canister was in an unanalyzed drop condition for a period of 45 minutes to one hour.
Licensee personnel did restore control of the canister load.
They repositioned the canister and safely lowered it into the storage vault.
The licensee halted all dry fuel storage movements to fully investigate the incident and develop corrective actions.
The licensee also promptly shared operational experience with other users of the UMAX storage system.
Currently there is only one other site that uses the UMAX dry fuel storage system in the United States, and that's the Callaway plant in Missouri.
Region IV became aware of the incident on August 6th when Southern California Edison provided a courtesy phone call to our staff and described the incident as a near-miss event.


as the result of incidental contact
NRC staff determined that the licensee should have made a 24-hour event report to the NRC operations center and informed Southern California Edison staff of their determination.
 
During discussions with Region IV managers on August 6th, including myself, Southern California Edison committed to suspend fuel transfer operations until they completed an investigation of the incident, understood the causes, and implemented corrective actions based on their investigation findings.
between the multipurpose canisters
They further committed to continue to suspend fuel transfer operations until NRC completed an independent investigation, and was satisfied that Southern California Edison's corrective actions were adequate.
 
Hence, the prolonged suspension of fuel transfer operations at the site.
and internal components of storage vaults
Next slide please.
 
NRC initiated a special inspection and had an inspection team onsite the week of September 10, 2018, to interview personnel, observe equipment, and review relevant documentation,
in the UMAX dry fuel storage system.
Our discussion this afternoon will also cover the process
 
that we used to make the determination
 
that Southern California Edison  
 
could resume fuel transfer operations, and I will talk briefly about some activities that Southern California  
 
Edison has identified as needing to occur before they begin active fuel transfer operations.
 
Next slide please.
 
As you see on the agenda, following discussion regarding NRC's decision
 
on the resumption of  
 
fuel transfer operations
 
we'll open the meeting to accept
 
questions from our audience.
This is a Category 3 meeting, so public participation is encouraged.
 
However, due to the period of time
 
that we have reserved for this webinar, and in the interest of
 
fairness to all participants, I would like to ask that audience members limit their questions to two, initially, so that we can address questions
 
from as many participants as
 
possible in the time allotted.  
 
As we've done in the past, questions and comments from today's session will be posted to our Spotlight page.
 
I acknowledge that several
 
of you have provided feedback
 
on our delay in responding
 
to your questions from prior webinars, but we do have those in process now.
Up until now, our staff has been
 
fully occupied with inspecting SONGS efforts.
I'll also note that in
 
addition to today's webinar
 
Scott Morris, our Regional Administrator, and I will also be speaking at the San Onofre Community
 
Engagement Panel meeting
 
this coming Wednesday, June 5th.  
 
We look forward to meeting
 
with some of you directly and answering any questions that you may have.
 
Next slide please.  
 
In the event of an emergency, all of us in the room
 
will stay together and exit
 
the building through the front doors.
We'll remain in the parking lot until the situation is over
 
and we're allowed to reenter the building.
 
We will provide notification
 
to the audience participants
 
in the event that we do have an emergency.
Let me also ask the staff in the room to silence your cellphones
 
during the meeting
 
and please keep your voices down
 
because the meeting is being recorded.
 
Lastly, be mindful that the meeting is being broadcast, so if individuals present
 
need to exit the room, please use the rear doors.
As noted in the slides, should we have technical difficulties
 
with the webinar broadcast, a telephone bridge will be available.
The phone number for that
 
bridge is on the slide.
 
The bridge line will only be activated
 
if we experience technical
 
difficulties with the broadcast.
These slides are available on the Spotlight portion
 
of the NRC public webpage at www.nrc.gov.
 
From the Spotlight section
 
on the left side of the page
 
click on "SONGS Cask Loading Issue".
 
You'll find a file name with the NRC webinar presentation on our final determination
 
on fuel loading operations.
 
The slides are also already available
 
on the NRC's Agency-wide Document Access
 
and Management System, or ADAMS.
The video and transcript from today's meeting
 
will also be posted to the
 
Spotlight section of our webpage.
 
In addition we'll post
 
the comments and questions that we receive this afternoon.
Please note that the
 
transcript of the meeting and the questions will take a few weeks to be posted
 
since NRC must receive the
 
transcript from the contractor who is providing the webinar service, and review both the
 
transcript and questions
 
to ensure accuracy of the information.
 
We are also required by the Americans
 
with Disabilities Act to provide closed captioning for the video.
We apologize in advance for
 
the delays and inconvenience, but we cannot control or
 
expedite this process.
 
Those of you who have
 
registered for the webinar, however, will be able to access the video shortly after the
 
conclusion of the meeting.
 
During the presentation, you
 
may submit written comments


and questions via the webinar chat room feature.
including the licensee's investigation and proposed corrective actions.
We'll answer questions
The inspection included many hours of subsequent in-office review of the licensee's many causal analyses and technical assessments that were not complete at the time of the onsite portion of our inspection.
 
The special inspection report was issued on November 28, 2018, with an errata published on December 19th.
and respond to comments as time allows.  
The report documented three Severity Level IV Violations, which are the lowest safety significance for cited violations under our enforcement policy.
 
The report also described two apparent violations, which were considered for escalated enforcement action.
This webinar is scheduled to
The three Severity Level IV violations involved failures to establish measures to ensure that conditions adverse to quality were promptly identified and corrected, and that refers to the licensee's formal corrective action program, failure to ensure operations of equipment and controls identified as important to safety
 
end at 1 p.m. Pacific Time.


were limited to trained and certified personnel, and a failure to provide qualitative or quantitative acceptance criteria in procedures to ensure that important activities are accomplished as planned during dry fuel storage operations.
Correspondence transmitting the special inspection report offered the choice of participation in a predecisional enforcement conference or an alternate dispute resolution session to address the apparent violations.
Southern California Edison elected to participate in a predecisional enforcement conference.
That conference was conducted on January 24, 2019, and was broadcast via public webinar.
Next slide please.
Next slide please.
I expect that many of you here today are familiar
NRC inspectors began Follow-up inspections at SONGS in November 2018 to independently assess the licensee's corrective actions and technical assessments.
 
with the August 3rd incident that occurred at San Onofre.
But because we have some
 
attendees that have not followed
 
this particular event and follow-on activities closely, I am going to provide a brief overview of
 
key activities that have
 
occurred since August 3, 2018.
 
On August 3rd, Southern California Edison
 
was lowering a loaded spent fuel canister into its underground storage vault.
For the current fuel offload
 
for Units 2 and 3, Southern California Edison
 
is using the HI-STORM UMAX
 
dry fuel storage system
 
designed by Holtec International which provides dry spent fuel storage in a vertical below grade configuration.
 
As that canister was being
 
lowered into the storage vault, the licensee personnel failed to notice
 
that the canister was misaligned and was not being properly lowered.
Licensee personnel continued
 
to lower the lifting equipment
 
until they believed that the
 
canister was fully lowered
 
into the bottom of the storage vault.
As the staff prepared to approach the ISFSI pad, a radiation protection technician identified elevated radiation levels that were not consistent
 
with a fully-lowered canister.
 
Licensee personnel participating in the evolution then identified that the
 
loaded spent fuel canister
 
was resting on a metal shield ring
 
near the top of the storage vault, preventing it from being lowered, and that the rigging was completely slack, no longer bearing the load of the canister.
 
With the vertical cask
 
transfer system lift
 
beam completely lowered, and that equipment is used
 
to lower and lift canisters into and from the storage vaults, the important-to-safety
 
slings were disabled
 
from performing their safety
 
function of suspending
 
and controlling the loaded spent fuel canister.
The licensee estimated that the canister
 
could have experienced an
 
approximate 17 to 18 foot drop
 
into the storage vault if the canister
 
had slipped off the metal ring or if the metal ring failed.
This load drop accident is
 
not a condition analyzed in the dry fuel storage system's Final Safety Analysis Report, which is tied to the
 
Certificate of Compliance or the licensing document.
The licensee estimated that the canister
 
was in an unanalyzed drop condition
 
for a period of 45 minutes to one hour.
 
Licensee personnel did restore
 
control of the canister load.
They repositioned the canister and safely lowered it
 
into the storage vault.
 
The licensee halted all
 
dry fuel storage movements
 
to fully investigate the incident
 
and develop corrective actions.
The licensee also promptly shared operational experience
 
with other users of the
 
UMAX storage system.
 
Currently there is only one other site
 
that uses the UMAX dry fuel storage system in the United States, and that's the Callaway plant in Missouri.
 
Region IV became aware of
 
the incident on August 6th
 
when Southern California Edison
 
provided a courtesy phone call to our staff and described the incident
 
as a near-miss event.
NRC staff determined that the licensee should have
 
made a 24-hour event report
 
to the NRC operations center and informed Southern California Edison staff
 
of their determination.
 
During discussions with Region IV managers
 
on August 6th, including myself, Southern California Edison committed to suspend fuel transfer operations until they
 
completed an investigation
 
of the incident, understood the causes, and
 
implemented corrective actions
 
based on their investigation findings.
They further committed to continue to suspend fuel transfer operations
 
until NRC completed an
 
independent investigation, and was satisfied that
 
Southern California Edison's corrective actions were adequate.
Hence, the prolonged suspension
 
of fuel transfer operations at the site.
 
Next slide please.
 
NRC initiated a special inspection
 
and had an inspection team onsite the week of September 10, 2018, to interview personnel, observe equipment, and review relevant documentation, including the licensee's investigation and proposed corrective actions.
 
The inspection included
 
many hours of subsequent in-office review of the licensee's many causal analyses
 
and technical assessments
 
that were not complete
 
at the time of the onsite
 
portion of our inspection.
The special inspection report was issued on November 28, 2018, with an errata published on December 19th.
 
The report documented three
 
Severity Level IV Violations, which are the lowest safety significance
 
for cited violations under our enforcement policy.
The report also described
 
two apparent violations, which were considered for
 
escalated enforcement action.
 
The three Severity Level IV violations involved failures to establish measures to ensure that conditions
 
adverse to quality
 
were promptly identified and corrected, and that refers to the licensee's
 
formal corrective action program, failure to ensure operations of equipment and controls identified
 
as important to safety were limited to trained and certified personnel, and a failure to provide
 
qualitative or quantitative acceptance criteria in procedures to ensure
 
that important activities
 
are accomplished as planned
 
during dry fuel storage operations.
 
Correspondence transmitting the special inspection report offered the choice of participation
 
in a predecisional enforcement conference
 
or an alternate dispute resolution session
 
to address the apparent violations.
 
Southern California Edison
 
elected to participate in a predecisional enforcement conference.
That conference was conducted
 
on January 24, 2019, and was broadcast via public webinar.
 
Next slide please.
 
NRC inspectors began Follow-up inspections at SONGS in November 2018 to independently  
 
assess the licensee's  
 
corrective actions and  
 
technical assessments.  
 
The inspection effort is now reaching its conclusion.
The inspection effort is now reaching its conclusion.
During the follow-up inspections, NRC identified several weaknesses and corrective actions implemented by the licensee.
During the follow-up inspections, NRC identified several


These included: causal evaluations  
weaknesses and corrective actions implemented by the licensee.
These included: causal evaluations did not address radiation protection issues, which we believed contributed to some of the causal factors associated with the incident, and changes made to the executive oversight board process were inadequate, meaning they were more administrative than substantive.
Procedure changes, particularly for the downloading procedure, lacked contingency steps for equipment failures, had incomplete criteria for suspending downloading operations, and had incomplete steps to meet seismic criteria during canister transport from the fuel building to the spent fuel storage pad.
We also noted a weakness in review of maintenance procedures.
The new equipment enhancements put in place were improperly designated as not important-to-safety, when they should have been important-to-safety,


did not address radiation protection issues, which we believed contributed
the new load sensing devices were not procured in accordance with the vendor's design purchase specifications, and the load sensing devices were not tested to the appropriate load capacity.
 
While we did identify weaknesses, I want to note specifically that the equipment was not used to transfer fuel prior to correcting these issues.
to some of the causal factors
The licensee also identified that past movement of loaded canisters from the fuel building to the storage pad may have resulted in the transport unit coming too close to structures along the route.
 
NRC inspectors identified that when the Vertical Cask Transporter, which again, is used to move the canister on the storage pad, approached the storage vault mating device, licensee personnel prematurely removed a seismic restraint, contrary to the associated seismic analysis.
associated with the
These weaknesses factored into the NRC's decision on proposing a civil penalty
 
incident, and changes made
 
to the executive oversight board process were inadequate, meaning they were more
 
administrative than substantive.
 
Procedure changes, particularly
 
for the downloading procedure, lacked contingency steps
 
for equipment failures, had incomplete criteria for suspending downloading operations, and had incomplete steps to
 
meet seismic criteria
 
during canister transport
 
from the fuel building to the spent fuel storage pad.
We also noted a weakness
 
in review of maintenance procedures.
 
The new equipment
 
enhancements put in place
 
were improperly designated as not important-to-safety, when they should have
 
been important-to-safety, the new load sensing devices were not procured  
 
in accordance with the vendor's  
 
design purchase specifications, and the load sensing devices were not tested to the appropriate load capacity.  
 
While we did identify weaknesses, I want to note specifically  
 
that the equipment  
 
was not used to transfer fuel prior to correcting these issues.
The licensee also identified  
 
that past movement  
 
of loaded canisters from the fuel building  
 
to the storage pad may have  
 
resulted in the transport unit  
 
coming too close to structures along the route.
NRC inspectors identified that when  
 
the Vertical Cask  
 
Transporter, which again, is used to move the  
 
canister on the storage pad, approached the storage vault mating device, licensee personnel prematurely  
 
removed a seismic restraint, contrary to the associated  
 
seismic analysis.
These weaknesses factored into the NRC's decision  
 
on proposing a civil penalty for the escalated enforcement action.
Next slide please.
 
On March 25, 2019, the final
 
enforcement action was issued, and a public webinar was conducted the same day
 
to discuss the final action
 
with public stakeholders.
 
The final enforcement action
 
included two violations.
The first violation involved the failure to ensure
 
that important-to-safety
 
equipment was available
 
to provide redundant drop protection
 
for a loaded spent fuel canister
 
during canister downloading.
The spent fuel storage system used by Southern California Edison
 
requires its spent fuel canister be lifted
 
and carried with redundant
 
drop protection features.


for the escalated enforcement action.
Next slide please.
On March 25, 2019, the final enforcement action was issued, and a public webinar was conducted the same day to discuss the final action with public stakeholders.
The final enforcement action included two violations.
The first violation involved the failure to ensure that important-to-safety equipment was available to provide redundant drop protection for a loaded spent fuel canister during canister downloading.
The spent fuel storage system used by Southern California Edison requires its spent fuel canister be lifted and carried with redundant drop protection features.
This was categorized as a Severity Level II violation.
This was categorized as a Severity Level II violation.
The NRC considered whether  
The NRC considered whether credit was warranted for identification and corrective action.
No identification credit was given because the violation was identified through a self-revealing event.
No corrective action credit was granted based on several considerations,


credit was warranted  
including the weaknesses that I just discussed.
In accordance with the NRC enforcement policy, this violation was assessed a $116,000 civil penalty.
I just want to pause and note that issuance of a Severity Level II violation, the second most safety significant category under our enforcement policy, has never been done for a spent fuel storage licensee.
The second violation involved failure to make timely notification to the NRC.
Licensees are required to notify the NRC within [[estimated NRC review hours::24 hours]] of the discovery of events involving spent fuel in which important-to-safety equipment is disabled or fails to function as designed.
This violation was categorized as a Severity Level III violation.
Since SONGS has not been the subject of escalated enforcement within the past two years, corrective action credit was considered.
The NRC did determine a corrective action credit was warranted, and no civil penalty was assessed for that violation.
A response to the Notice


for identification and corrective action.  
of Violation was received by NRC on April 23, 2019.
We reviewed the licensee's response and found it satisfactory.
But I want to note that our review of the licensee's corrective actions, as described in their correspondence, was supplemented by our many months of inspection activities.
Region IV representatives subsequently attended the SONGS Community Engagement Panel meeting in California on March 28th.
We were represented by the Region IV Regional Administrator, Scott Morris, and myself.
Along with staff from the Office of Public Affairs and the Office of Congressional Affairs, Scott and I also met with congressional district staffers on March 28th while we were in Southern California.
We discussed all the observations of our follow-on inspection and the final enforcement action during those engagements.
I also want to note or remind you that during the March 25th public webinar, and the March 28th Community


No identification credit was given
Engagement Panel meeting, we discussed the licensee's corrective actions and observations from the NRC's follow-up inspection that was initiated back in November 2018, and which is still ongoing.
NRC noted that while certain weaknesses in the licensee's corrective actions were observed, with one exception, all corrective actions and observed weaknesses had been addressed as of the March 25th webinar.
The one outstanding issue involves scratching of canisters during fabrication or handling prior to insertion, during canister insertion, and possibly during future canister withdrawal.
This was determined to be an outstanding compliance issue, not a safety issue, which needed to be resolved before the licensee resumed fuel transfer operations.
And with that, let's move on to the next slide, and resolution of that outstanding issue and the path to resuming fuel transfer operations.
The issue of incidental contact


because the violation was identified through a self-revealing event.
during canister insertion and the potential for scratching was initially discussed with Southern California Edison when we began our follow-up inspection back in November 2018.
No corrective action credit was granted
Southern California Edison reviewed several approaches to demonstrate that potential scratching, due to incidental contact between canisters and the internal storage vault components, would not exceed allowable American Society of Mechanical Engineers, or ASME, code limits.
I'll also note that the technical specifications associated with this Certificate of Compliance do reference Section III of the ASME Code.
Southern California Edison ultimately initiated in situ visual assessments of downloaded canisters using robotics and three-dimensional video imaging.
We talked a little bit about this at the March 28th Community Engagement Panel meeting.
That method of examination


based on several considerations, including the weaknesses that I just discussed.  
is commonly used in the aeronautics industry and is being examined for future use as an option in spent fuel canister aging management programs.
The statistically suitable number of canisters, a total of eight, were examined with imaging of the canister wall surfaces.
Using a statistical analysis methodology, and the actual canister wear data, as visualized during the three-dimensional imaging, the licensee concluded that there is 95% probability with a 95% confidence level that a scratch after canister insertion and withdrawal would not be any deeper than what is allowed under the ASME Code.
Their evaluation encompasses scratches that might occur during insertion, scratches that might occur during withdrawal, and assumes that those two models of scratches may be superimposed.
The evaluation also considers the potential for these scratches to overlay flaws that may have resulted during fabrication


In accordance with the
or handling prior to downloading.
 
The scratch depth calculated by the licensee's analysis is viewed as conservative within the allowable ASME Boiler and Pressure Vessel Code limits.
NRC enforcement policy, this violation was assessed a $116,000 civil penalty.  
For this situation, the applicable limit for wear is less than 10% of the canister wall thickness.
 
The licensee then used the 10 CFR 72.48 review process to support a change to sections of the UMAX Final Safety Analysis Report to acknowledge that some canister scratching or wear may occur during operational activities.
I just want to pause and note that issuance
And if you recall our earlier discussions in March, there are two subsections of the Final Safety Analysis Report that stated that there was ample room between the canister and the interior wall of the storage vault such that no scratching could occur.
 
That's since been demonstrated to not be the case.
of a Severity Level II violation, the second most safety
Next slide please.
 
So let's move on to the NRC's evaluation.
significant category under our enforcement policy, has never been done
Now that I've shared what
 
for a spent fuel storage licensee.  
 
The second violation involved failure
 
to make timely notification to the NRC.  
 
Licensees are required to notify the NRC
 
within [[estimated NRC review hours::24 hours]] of the discovery of events involving spent fuel in which important-to-safety equipment
 
is disabled or fails to
 
function as designed.  
 
This violation was categorized as
 
a Severity Level III violation.
Since SONGS has not been the subject of escalated enforcement
 
within the past two years, corrective action credit was considered.
 
The NRC did determine
 
a corrective action credit was warranted, and no civil penalty was assessed for that violation.  
 
A response to the Notice of Violation was received by NRC on April 23, 2019.  
 
We reviewed the licensee's response
 
and found it satisfactory.
But I want to note that our review of the licensee's corrective
 
actions, as described
 
in their correspondence, was supplemented
 
by our many months of
 
inspection activities.
Region IV representatives subsequently attended
 
the SONGS Community
 
Engagement Panel meeting
 
in California on March 28th.
 
We were represented
 
by the Region IV Regional Administrator, Scott Morris, and myself.
Along with staff from the
 
Office of Public Affairs


and the Office of Congressional Affairs, Scott and I also met with
Southern California Edison has completed in its evaluation, I'll explain what the NRC has done in terms of our assessment of that evaluation.
First, we had an inspector on site to observe seven of the eight canister examinations.
Our inspection activities were focused on verifying the effectiveness of the process and the validity of the data obtained, so that we would be better prepared to review Southern California Edison's report.
So our inspector was actually standing side by side with Southern California Edison's contractor looking at the data as it was transmitted so that we could verify that the data in Southern California Edison's report was the same as what we saw while the examination was ongoing.
We did not simply accept a report from Southern California Edison.
We independently validated the data obtained during the canister examinations.
NRC staff also performed independent statistical assessments using several methods which verified that the licensee's evaluation reasonably bounds


congressional district staffers on March 28th while we were in Southern California.  
the maximum scratch depth.
 
We used a staff member who has a doctorate degree in statistics to verify the licensee's analysis.
We discussed all the observations
That staff member also used the actual data obtained through the visual assessments to perform independent statistical analyses using several models that were appropriate for the sample size.
 
Our conclusion, through our independent assessments, is that the conclusion presented by Southern California Edison was conservative and reasonably bounds the maximum anticipated scratch or wear resulting from operational activities.
of our follow-on inspection
 
and the final enforcement
 
action during those engagements.
I also want to note or remind you that during the March 25th public webinar, and the March 28th Community Engagement Panel meeting, we discussed the licensee's
 
corrective actions
 
and observations from the NRC's follow-up inspection that was initiated back in November 2018, and which is still ongoing.
 
NRC noted that while certain weaknesses
 
in the licensee's corrective
 
actions were observed, with one exception, all corrective actions and observed weaknesses had been addressed
 
as of the March 25th webinar.
 
The one outstanding issue
 
involves scratching of canisters
 
during fabrication or
 
handling prior to insertion, during canister insertion, and possibly during
 
future canister withdrawal.
 
This was determined to be an
 
outstanding compliance issue, not a safety issue, which needed to be resolved before the licensee resumed
 
fuel transfer operations.
 
And with that, let's move
 
on to the next slide, and resolution of that outstanding issue and the path to resuming fuel transfer operations.  
 
The issue of incidental contact during canister insertion and the potential for scratching
 
was initially discussed with
 
Southern California Edison when we began our follow-up inspection back in November 2018.
 
Southern California Edison
 
reviewed several approaches
 
to demonstrate that potential scratching, due to incidental contact between canisters and the internal storage vault components, would not exceed
 
allowable American Society
 
of Mechanical Engineers, or ASME, code limits.
 
I'll also note that the technical specifications associated with this
 
Certificate of Compliance
 
do reference Section III
 
of the ASME Code.
 
Southern California Edison ultimately initiated in situ visual assessments  
 
of downloaded canisters
 
using robotics and
 
three-dimensional video imaging.
 
We talked a little bit about this at the March 28th Community Engagement Panel meeting.
 
That method of examination is commonly used in the aeronautics industry
 
and is being examined
 
for future use as an option in spent fuel canister aging management programs.
 
The statistically suitable
 
number of canisters, a total of eight, were examined
 
with imaging of the canister wall surfaces.
Using a statistical analysis methodology, and the actual canister wear data, as visualized during the
 
three-dimensional imaging, the licensee concluded that
 
there is 95% probability with a 95% confidence level that a scratch after canister insertion
 
and withdrawal would not be any deeper
 
than what is allowed under the ASME Code.
 
Their evaluation encompasses
 
scratches that might occur during insertion, scratches that might occur
 
during withdrawal, and
 
assumes that those two models
 
of scratches may be superimposed.
 
The evaluation also considers the potential for these scratches to overlay flaws
 
that may have resulted during fabrication or handling prior to downloading.
The scratch depth calculated
 
by the licensee's analysis
 
is viewed as conservative within the allowable ASME Boiler and Pressure
 
Vessel Code limits.
 
For this situation, the  
 
applicable limit for wear
 
is less than 10% of the canister wall thickness.
The licensee then used the
 
10 CFR 72.48 review process
 
to support a change to sections
 
of the UMAX Final Safety Analysis Report
 
to acknowledge that
 
some canister scratching or wear may occur during operational activities.
 
And if you recall our
 
earlier discussions in March, there are two subsections
 
of the Final Safety Analysis Report that stated that there was ample room between the canister and the interior wall
 
of the storage vault such that
 
no scratching could occur.
 
That's since been demonstrated
 
to not be the case.
Next slide please.
Next slide please.
So let's move on to the NRC's evaluation.  
I and my staff briefed senior agency management on our conclusions, and on May 17th I was authorized to notify senior Southern California Edison management that NRC had completed its review of the canister scratching analysis and accepted the Southern California Edison evaluations.
Southern California Edison was informed that once they confirmed that they were confident


Now that I've shared what Southern California Edison has completed in its evaluation, I'll explain what the
that all corrective actions had been completed to their satisfaction, the NRC has no objection to them resuming fuel transfer operations.
Southern California Edison documented the basis for their decision to prepare to resume fuel transfer operations in a letter to the NRC dated May 17th.
That letter is now publicly available in our electronic document system, or ADAMS, and the document is also available in the Spotlight section of the NRC webpage.
In its correspondence Southern California Edison described additional activities that must occur prior to resuming fuel transfer operations.
These include training employees, ensuring that personnel qualifications are in place, and completing certain equipment checks.
Completion of these activities is expected to take several weeks, and Southern California Edison is committed to provide us verbal notification when they are ready to resume fuel transfer operations, in


NRC has done in terms of our assessment of that evaluation.
advance of actually doing so.
First, we had an inspector
In the interim, I and my staff continue weekly teleconferences with senior Southern California Edison managers to obtain updates on site activities so that we can plan our inspection and oversight activities effectively.
Depending on the type and extent of training that will need to be done prior to resuming fuel loading we may be on site to observe those activities.
Once the licensee resumes fuel transfer operations, we will initiate unannounced inspections that will be performed frequently to observe the licensee's implementation of their enhanced programs.
I anticipate performing inspections several times for a few days during the calendar quarter, and then we will produce formal reports to let the public know how the activities are proceeding.
We'll continue to engage with the public to keep you informed.
We plan to support the upcoming June 5th Community Engagement Panel meeting,


on site to observe
and we are developing strategies for holding a public meeting in a community local to SONGS.
With that, I'd like to turn the meeting over to our facilitator, Mr. Austin Roberts.
Austin has been monitoring questions as they've been submitted during the webinar.
And again, I want to note that in the interest of fairness, we'll limit questions from a single audience member to two, so that we can maximize the ability for all participants to submit questions, and then we'll come back for additional submittals as time permits.
Thank you.
- Good morning, or good afternoon.
My name is Austin Roberts and as facilitator for this meeting I will be asking questions and addressing comments from the public and putting them to our panel here.
From the back of the room, so far we have not had any public questions put to us through the attendees of the webinar.


seven of the eight canister examinations.
If you are attending the webinar, you have a Questions tab at the side of your screen, which you can use to put questions to us.
 
It is similar to an instant message feature.
Our inspection activities were focused on
We'll be seeing those on our side, and we'd be happy to address any public comments or questions that you may have regarding our decision to allow the resumption of fuel transfer operations.
 
Our first question from the public, how is the NRC factoring lessons learned from the San Onofre event into its oversight efforts at other sites?
verifying the effectiveness of the process and the validity of the data obtained, so that we would be
- That's a great question, and we have talked about that in the past.
 
We will be collectively, with our peers in the other regional offices and the applicable division in the Office of Nuclear Materials Safety and Safeguards, taking a look at the oversight process.
better prepared to review
By that I mean our inspection procedures, to see if anything can be enhanced to either look at things in different sequences or at different frequencies.
 
- Thank you.
Southern California Edison's report.
If there are any other
 
So our inspector was actually
 
standing side by side
 
with Southern California Edison's contractor looking at the data as it was transmitted
 
so that we could verify that the data
 
in Southern California Edison's report
 
was the same as what we saw
 
while the examination was ongoing.
We did not simply accept a report from Southern California Edison.
 
We independently validated the data
 
obtained during the canister examinations.
 
NRC staff also performed
 
independent statistical assessments using several methods which verified that the licensee's
 
evaluation reasonably bounds the maximum scratch depth.
We used a staff member
 
who has a doctorate degree
 
in statistics to verify the licensee's analysis.
That staff member also used
 
the actual data obtained
 
through the visual assessments
 
to perform independent
 
statistical analyses using several models that were appropriate for the sample size.
Our conclusion, through our
 
independent assessments, is that the conclusion
 
presented by Southern California Edison
 
was conservative and reasonably bounds
 
the maximum anticipated scratch or wear resulting from operational activities.
Next slide please.
 
I and my staff briefed
 
senior agency management
 
on our conclusions, and on May 17th I was authorized to notify senior Southern California Edison management
 
that NRC had completed its review
 
of the canister scratching analysis
 
and accepted the Southern
 
California Edison evaluations.
Southern California Edison was informed that once they confirmed
 
that they were confident that all corrective actions had been completed
 
to their satisfaction, the NRC has no objection to them resuming fuel transfer operations.
Southern California Edison documented
 
the basis for their decision to prepare
 
to resume fuel transfer operations
 
in a letter to the NRC dated May 17th.
 
That letter is now publicly available in our electronic document system, or ADAMS, and the document is also
 
available in the Spotlight section
 
of the NRC webpage.
 
In its correspondence
 
Southern California Edison described additional activities that must occur
 
prior to resuming fuel
 
transfer operations.
 
These include training employees, ensuring that personnel qualifications are in place, and completing certain equipment checks.
 
Completion of these activities
 
is expected to take several weeks, and Southern California Edison
 
is committed to provide us verbal notification when they are ready to resume
 
fuel transfer operations, in advance of actually doing so.
In the interim, I and my staff
 
continue weekly teleconferences
 
with senior Southern California Edison managers to obtain updates on site activities
 
so that we can plan our inspection
 
and oversight activities effectively.
 
Depending on the type
 
and extent of training that will need to be done prior to resuming fuel loading
 
we may be on site to
 
observe those activities.
 
Once the licensee resumes
 
fuel transfer operations, we will initiate unannounced inspections that will be performed frequently to observe the licensee's implementation
 
of their enhanced programs.
 
I anticipate performing
 
inspections several times
 
for a few days during the calendar quarter, and then we will produce formal reports
 
to let the public know how
 
the activities are proceeding.
 
We'll continue to engage with the public
 
to keep you informed.
We plan to support the upcoming June 5th Community
 
Engagement Panel meeting, and we are developing strategies for holding
 
a public meeting in a
 
community local to SONGS.
With that, I'd like to turn the meeting over to our facilitator, Mr. Austin Roberts.
 
Austin has been monitoring questions
 
as they've been submitted
 
during the webinar.
And again, I want to note that in the interest of fairness, we'll limit questions from a
 
single audience member to two, so that we can maximize the
 
ability for all participants
 
to submit questions, and then we'll come back for additional submittals as time permits.
 
Thank you.
- Good morning, or good afternoon.
 
My name is Austin Roberts
 
and as facilitator for this meeting I will be asking questions
 
and addressing comments from the public
 
and putting them to our panel here.
 
From the back of the room, so far we have not had any public questions put to us through the
 
attendees of the webinar.
If you are attending the webinar, you have a Questions tab  
 
at the side of your screen, which you can use to put questions to us.
It is similar to an instant message feature.  
 
We'll be seeing those on our side, and we'd be happy to  
 
address any public comments  
 
or questions that you may have regarding our decision to allow the resumption of  
 
fuel transfer operations.  
 
Our first question from the public, how is the NRC factoring lessons learned  
 
from the San Onofre event into its  
 
oversight efforts at other sites? - That's a great question, and we have talked about that in the past.  
 
We will be collectively, with our peers  
 
in the other regional offices  
 
and the applicable division  
 
in the Office of Nuclear Materials Safety and Safeguards, taking a look at the oversight process.  
 
By that I mean our inspection procedures, to see if anything can be enhanced  
 
to either look at things  
 
in different sequences or at different frequencies. - Thank you.  
 
If there are any other questions from the public, again, it's the Questions tab, it should be
 
on the right-hand side of your screen.
 
Our second question from the public, excuse me one second, the contents of can number 30 were removed
 
from the spent fuel pool 10 months ago.
 
Canister number 30 is now in
 
the fuel handling building
 
inside a transfer cask; is the NRC concerned about dangerous heat buildup
 
inside canister number 30?
 
And they also want to
 
know if you can tell us
 
what is the internal and
 
exterior temperatures of can number 30? - When we were on site
 
during January and February
 
we did go into the building
 
that contains the canister number 30.


questions from the public, again, it's the Questions tab, it should be on the right-hand side of your screen.
Our second question from the public, excuse me one second, the contents of can number 30 were removed from the spent fuel pool 10 months ago.
Canister number 30 is now in the fuel handling building inside a transfer cask; is the NRC concerned about dangerous heat buildup inside canister number 30?
And they also want to know if you can tell us what is the internal and exterior temperatures of can number 30?
- When we were on site during January and February we did go into the building that contains the canister number 30.
We are not concerned with the heat on the canister.
We are not concerned with the heat on the canister.
They go in every day, I  
They go in every day, I think two times a day, every [[estimated NRC review hours::12 hours]] and take measurements on the outside of the canister, and is well below any kind of the design safety values.
So there's no concern on the canister.
It can stay in the fuel building


think two times a day, every [[estimated NRC review hours::12 hours]] and take measurements
indefinitely, if need be.
 
- Thank you.
on the outside of the canister, and is well below any kind of the design safety values.
Will there be any design changes to the ceiling alignment rings in the vaults?
So there's no concern on the canister.
- At the present time we have no indication from Holtec that they anticipate any design change with those components.
 
It can stay in the fuel building indefinitely, if need be. - Thank you.  
 
Will there be any design  
 
changes to the ceiling alignment rings in the vaults? - At the present time we have  
 
no indication from Holtec  
 
that they anticipate any design change  
 
with those components.  
- I have another design related question:
- I have another design related question:
Are you addressing the substandard thin casings issue?  
Are you addressing the substandard thin casings issue?
We need the super thick casings that are transportable to be used instead.
- I'll take that one.
The canisters that are in use for the UMAX spent fuel storage system have been approved, and there is no foreseeable safety issue with them.
- Thank you.
Did the NRC's root cause analysis determine that gouging on the walls is caused by a lack of a precision canister downloading system?
- The NRC evaluated the root cause analyses completed by Holtec- or by Southern California Edison and its contractor Holtec.
And we have no indication that the gouging


We need the super thick casings
needs to have any further evaluation.
We're comfortable with their conclusions on how the gouging, actual scratching occurred.
- Thank you.
Will the NRC be on hand for the first canister loading once it resumes?
- Yes, we do plan to be on hand when the licensee resumes fuel transfer operations.
I mentioned in my discussion that we are holding weekly conversations with Southern California Edison, and the purpose of those conversations is to actually be aware of what their schedule and their anticipated resumption date is.
- Our next question is about the physical condition of the canisters.
The canisters would have months of coastal salt air and soot baked onto the surface.
How did the licensee clean the surface of the canisters before the visual inspection with the cameras?
- There was no need to clean the exterior of the canister.
The robot could very easily determine where, if any, scratches or where marks were


that are transportable to be used instead.  
and what the depth were, or the depth was, each scratch that it found.
- I'll take that one.
There was no reason to clean it.
- Another question, can you tell us what the target date to resume loading is?
- No, we actually can't speak to that.
That will be a decision made by Southern California Edison.
And as I mentioned, it depends on several factors including the need to do training and qualified personnel as well as equipment checks.
So we have no projected timeline for that at this point.
- Thank you.
According to a number given by-according to a number given at the predecisional enforcement conference, canisters one through four have an estimated 51 broken bolts and shims between them, or shim standoffs, has the NRC determined that these canisters are safe?
- Yes, so the four canisters in question relating to the shim standoff was an issue that has been identified by the licensee to the NRC, and that has been, went through-the Division of Spent


The canisters that are in use for
Fuel Management reviewed, because it's a generic concern.
 
It's not just Southern California Edison's canisters that were affected.
the UMAX spent fuel storage system have been approved, and there is no foreseeable
They did provide analysis to our Division of Spent Fuel Management that they did review, and those canisters are safe for storage, and there's no issues with them continuing to be stored at Southern California Edison.
 
- I have another question about the thickness of the canister walls, or a comment, rather.
safety issue with them.
The lack of concern about what a leak out of these thin canisters would mean to containment is still evident by the nonchalant answers provided.
- Thank you.
Thick-walled canisters should be provided for public safety.
 
- That's a comment?
Did the NRC's root
- That's a comment, not a question, but we do want to respect those comments and make sure that your comments are brought to attention.
 
What ASME pressure vessel in service code was used to determine that less than 10% gouging is acceptable?
cause analysis determine that gouging on the walls is caused by a lack of a precision
- That value comes from Section III of the ASME Boiler and
 
canister downloading system?
- The NRC evaluated
 
the root cause analyses
 
completed by Holtec- or by Southern California Edison and its contractor Holtec.
 
And we have no indication that the gouging needs to have any further evaluation.
We're comfortable with their conclusions
 
on how the gouging, actual
 
scratching occurred. - Thank you.
Will the NRC be on hand
 
for the first canister
 
loading once it resumes?
- Yes, we do plan to be
 
on hand when the licensee resumes fuel transfer operations.
I mentioned in my discussion that we
 
are holding weekly conversations
 
with Southern California Edison, and the purpose of those conversations
 
is to actually be aware
 
of what their schedule and their anticipated resumption date is. - Our next question is about
 
the physical condition of the canisters.
 
The canisters would have months
 
of coastal salt air and soot
 
baked onto the surface.
How did the licensee clean the surface of the canisters
 
before the visual
 
inspection with the cameras?
- There was no need to clean
 
the exterior of the canister.
The robot could very easily determine where, if any, scratches or where marks were and what the depth were, or the depth was, each scratch that it found.
 
There was no reason to clean it.
- Another question, can you tell us what the target date to resume loading is? - No, we actually can't speak to that.
 
That will be a decision made
 
by Southern California Edison.
 
And as I mentioned, it
 
depends on several factors including the need to do training and qualified personnel
 
as well as equipment checks.
 
So we have no projected
 
timeline for that at this point.
- Thank you.
 
According to a number given by-according to a number given at the predecisional
 
enforcement conference, canisters one through
 
four have an estimated
 
51 broken bolts and shims between them, or shim standoffs, has the NRC determined that
 
these canisters are safe?
- Yes, so the four canisters in question
 
relating to the shim standoff was an issue
 
that has been identified by the licensee to the NRC, and that has been, went through-
 
the Division of Spent Fuel Management reviewed, because it's a generic concern.  
 
It's not just Southern California Edison's  
 
canisters that were affected.
They did provide analysis to our Division of Spent Fuel Management  
 
that they did review, and those canisters  
 
are safe for storage, and  
 
there's no issues with them continuing to be stored at Southern California Edison.  
- I have another question  
 
about the thickness of the canister walls, or a comment, rather.  
 
The lack of concern about what a leak  
 
out of these thin canisters would mean to containment is still evident by the  
 
nonchalant answers provided.  
 
Thick-walled canisters should  
 
be provided for public safety.  
- That's a comment? - That's a comment, not a question, but we do want to respect those comments  
 
and make sure that your comments  
 
are brought to attention.  
 
What ASME pressure vessel in service code  
 
was used to determine that less than 10% gouging is acceptable? - That value comes from Section III  
 
of the ASME Boiler and Pressure Vessel Code. - Thank you.
 
A question I asked earlier, that you did answer, was about whether the NRC determined that a root cause
 
from our root cause analysis
 
determined that gouging of the walls
 
was caused by the contractor's
 
lack of precision canister downloading system; a follow-on question to that is, what was the root cause that
 
was derived from that root cause analysis?
- The root cause was more than
 
just looking into the design.
 
It was looking at the training, the corrective action program, the procedures, and what led to the two individuals
 
being out on the pad that
 
disabled the important-to-safety slings.


Pressure Vessel Code.
- Thank you.
A question I asked earlier, that you did answer, was about whether the NRC determined that a root cause from our root cause analysis determined that gouging of the walls was caused by the contractor's lack of precision canister downloading system; a follow-on question to that is, what was the root cause that was derived from that root cause analysis?
- The root cause was more than just looking into the design.
It was looking at the training, the corrective action program, the procedures, and what led to the two individuals being out on the pad that disabled the important-to-safety slings.
So it really looked at the root cause.
So it really looked at the root cause.
And the root cause was basically that the management  
And the root cause was basically that the management had failed to recognize the implications of a long storage campaign operation where usually they're a lot shorter unless they're unloading the whole pool to pad, and all the new influx of new individuals,
 
had failed to recognize  
 
the implications of a long  
 
storage campaign operation  
 
where usually they're a lot shorter unless they're unloading the whole pool to pad, and all the new influx of new individuals, the training, the procedures.
So it really combined a


bunch of contributing causes.  
the training, the procedures.
So it really combined a bunch of contributing causes.
- Thank you.
- Thank you.
We still have time for some more questions.  
We still have time for some more questions.
 
Again, we would like the focus of this question and comment to be about our decision to allow the resumption of fuel transfer operations.
Again, we would like the focus  
Here we have one, another question.
 
Does the NRC agree that the scratches heal over time?
of this question and comment  
- On stainless steel There is, it's called, re-, re-,
 
to be about our decision  
 
to allow the resumption of fuel transfer operations.
Here we have one, another question.  
 
Does the NRC agree that the  
 
scratches heal over time?  
- On stainless steel There  
 
is, it's called, re-, re-,
I can't think of the word.
I can't think of the word.
Cast, bind, or something.
Cast, bind, or something.
Yes, I don't know if  
Yes, I don't know if they necessarily heal.
 
But I have heard of that term.
they necessarily heal.  
I don't know if I definitely believe that.
 
- I believe that's terminology that has been used by Southern California Edison at various public meetings.
But I have heard of that term.  
- Thank you.
 
We have a question about the licensee, how are public safety concerns being addressed given that Edison has discontinued the alert system?
I don't know if I definitely believe that.  
- I believe that's terminology that has been used by Southern California Edison  
 
at various public meetings.  
- Thank you.  
 
We have a question about the licensee, how are public safety concerns being addressed given that Edison has  
 
discontinued the alert system?
- The alert system, if it's the notification system
 
required under Emergency
 
Preparedness Programs, is something that needs to be active while the facility is in operation.
 
Once they decommission and
 
they are no longer operating, that system can be eliminated
 
under exemption authorized by the NRC. - Thank you.
Our next question from the public:
 
the NRC has claimed that
 
the cans are compliant
 
with ASME code but they
 
are not ASME certified.


- The alert system, if it's the notification system required under Emergency Preparedness Programs, is something that needs to be active while the facility is in operation.
Once they decommission and they are no longer operating, that system can be eliminated under exemption authorized by the NRC.
- Thank you.
Our next question from the public:
the NRC has claimed that the cans are compliant with ASME code but they are not ASME certified.
Can you explain the difference?
Can you explain the difference?
Can you explain why not? - Sure, I'll take that and Lee  
Can you explain why not?
- Sure, I'll take that and Lee can supplement if he chooses to.
These canisters under 10 CFR Part 72, they are not required to be fully ASME certified because they are not a true pressure vessel.
However, the ASME code is recognized as an acceptable method of demonstrating certain design features.
And for the technical specifications associated with this Certificate of Compliance,


can supplement if he chooses to.  
Holtec International did refer to certain sections of the ASME Code.
 
- Thank you.
These canisters under
What monitoring mechanism is being provided on the storage canisters?
 
And what schedule to guarantee that no leaks are about to occur?
10 CFR Part 72, they are not required to be fully ASME certified because they are not a  
- Do you want to take that?
 
- Well the licensee does have radiation protection, TLDs or monitoring systems, set up around their owner controlled barrier and around the ISFSI that would monitor for any type of release.
true pressure vessel.  
On the system itself there's temperature monitoring and they also inspect the vents to ensure that they're open on a daily basis.
So if any kind of rise in temperature above a certain degree, they would go out and look at the canister and verify everything's acceptable.
- Thank you.
How was the Final Safety Analysis Report able to be revised regarding possibility of an acceptability of scratches without approval from the NRC?
- Under the 72.48 process, the licensee


However, the ASME code is  
is allowed to make design changes to their systems.
 
They have a set of questions to go through that's listed in the regs that they must answer, and that if they do pass, then they can make that change.
recognized as an acceptable method
Only when they do not pass those questions would they have to submit it to the NRC for review and approval.
 
And the scratches did pass all those questions.
of demonstrating certain design features.
And for the technical specifications associated with this
 
Certificate of Compliance, Holtec International did refer to certain sections
 
of the ASME Code.  
- Thank you.
- Thank you.
What monitoring mechanism is being provided on the storage canisters?
We have a follow-up to our question from before about the alert system at San Onofre.
 
And what schedule to guarantee
 
that no leaks are about to occur?
- Do you want to take that?
- Well the licensee does have radiation protection, TLDs or monitoring systems, set up around their
 
owner controlled barrier
 
and around the ISFSI
 
that would monitor
 
for any type of release.
On the system itself there's temperature monitoring
 
and they also inspect the vents to ensure
 
that they're open on a daily basis.
 
So if any kind of rise in temperature
 
above a certain degree, they would go out and look at the canister and verify everything's acceptable.
- Thank you.
 
How was the Final Safety Analysis
 
Report able to be revised
 
regarding possibility of an acceptability of scratches without approval from the NRC?
- Under the 72.48 process, the licensee is allowed to make design changes to their systems.
 
They have a set of questions to go through
 
that's listed in the regs that they must answer, and that if they do pass, then
 
they can make that change.
 
Only when they do not pass those questions
 
would they have to submit it
 
to the NRC for review and approval.
And the scratches did pass all those questions.
- Thank you.
 
We have a follow-up to  
 
our question from before  
 
about the alert system at San Onofre.  
 
It's a follow-up:
It's a follow-up:
Given the near accident being discussed today, is it possible that the NRC can require  
Given the near accident being discussed today, is it possible that the NRC can require the licensee to restart the alert system?
 
- We generally would not do that.
the licensee to restart the alert system?  
And I don't know who posed the question, but we've stated in several public meetings that even if the canister would have dropped into the storage vault, its integrity would have been maintained and there would have been no release of radioactive materials.
- We generally would not do that.  
 
And I don't know who posed the question, but we've stated in several public meetings  
 
that even if the canister  
 
would have dropped  
 
into the storage vault, its integrity would have been maintained and there would have been no release of radioactive materials.  
- Thank you.
- Thank you.
Could you describe your coordination with SCE
and the Community Engagement Panel
regarding presenting at the CEP meeting?
Please advise the names of persons from the NRC
that communicate with SCE
and the Community Engagement Panel.
Who from the licensee has
communicated with the NRC about the same issue? - Could you repeat That question please?
- I think they want the
names of individuals
from the NRC and from the licensee
that were in communication
in preparing for the Community Engagement Panel. - I generally serve as the
primary communication point
between the Community Engagement Panel, and that's independent from my contacts
with Southern California Edison.
I'm also one of the primary contacts for the regional office, at least for inspection


oversight activities, with Southern California Edison managers.  
Could you describe your coordination with SCE and the Community Engagement Panel regarding presenting at the CEP meeting?
Please advise the names of persons from the NRC that communicate with SCE and the Community Engagement Panel.
Who from the licensee has communicated with the NRC about the same issue?
- Could you repeat That question please?
- I think they want the names of individuals from the NRC and from the licensee that were in communication in preparing for the Community Engagement Panel.
- I generally serve as the primary communication point between the Community Engagement Panel, and that's independent from my contacts with Southern California Edison.
I'm also one of the primary contacts for the regional office, at least for inspection oversight activities, with Southern California Edison managers.
- Thank you.
- Thank you.
We have a question about, again about ASME compliance.  
We have a question about, again about ASME compliance.
 
What about internal pressure
What about internal pressure buildup from hydrogen off gassing from damaged fuel.


Would that not make the fuel  
buildup from hydrogen off gassing from damaged fuel.
 
Would that not make the fuel canister a pressure vessel?
canister a pressure vessel? - The canisters are drained of all water, down to vacuum levels, and  
- The canisters are drained of all water, down to vacuum levels, and then back-filled with helium.
 
So there is no hydrogen generation in here because there's no water to be separated to make hydrogen.
then back-filled with helium.  
 
So there is no hydrogen generation in here  
 
because there's no water to  
 
be separated to make hydrogen.
Helium's a noble gas.
Helium's a noble gas.
It's not going to divide on its own.  
It's not going to divide on its own.
 
So there would be no risk of hydrogen buildup inside the canister.
So there would be no  
So once they're back filled with helium to a certain value it's going to stay that value until it's eventually opened to remove the canisters, or the fuel.
 
- Next question is, if monitoring shows that a breach has happened, how would you transport the breached canister, to which location and structure, to prevent further leaks from the damaged canister and then what would be the ultimate fate if there were a breach of the canister?
risk of hydrogen buildup  
- At the present time there's no anticipated breaching of canisters.
 
They're stable, they're designed
inside the canister.  
 
So once they're back filled  
 
with helium to a certain value it's going to stay that value until it's eventually opened  
 
to remove the canisters, or the fuel.  
- Next question is, if monitoring shows  
 
that a breach has happened, how would you transport the breached canister, to which location and structure, to prevent further leaks  
 
from the damaged canister  
 
and then what would be the ultimate fate  
 
if there were a breach of the canister? - At the present time there's no anticipated breaching of canisters.  
 
They're stable, they're designed to remain in dry storage for many, many years.
 
If a canister, if something
 
happened to a canister, the licensee would have to come up with a plan.
 
Generally we believe they would
 
probably use an overpack of the canister.
- Thank you.


to remain in dry storage for many, many years.
If a canister, if something happened to a canister, the licensee would have to come up with a plan.
Generally we believe they would probably use an overpack of the canister.
- Thank you.
We have a couple questions along the same lines.
We have a couple questions along the same lines.
The commenter says: my  
The commenter says: my understanding is that there is at least a liter of water in each canister; can the expert prove his claim?
 
And again, a second question, are you saying there is no water in the canister?
understanding is that there  
- Yeah, they're vacuumed down to very low levels, and at the system used at Southern California Edison they used forced helium dehydration to remove all water from the system.
 
So there is no, there is no water in these systems, definitely not a liter of water, really none.
is at least a liter of  
- Thank you.
 
Looking at long-term storage, a question from the public is,
water in each canister;  
 
can the expert prove his claim?  
 
And again, a second question, are you saying there is no water in the canister?  
- Yeah, they're vacuumed  
 
down to very low levels, and at the system used at  
 
Southern California Edison they used forced helium dehydration to remove all water from the system.  
 
So there is no, there is no water in these systems, definitely not a liter  
 
of water, really none. - Thank you.
Looking at long-term storage, a question from the public is, would you say that these canisters can safely
 
store nuclear waste at its current site
 
for over 50 years or over 100 years? - The Certificates of Compliance are being renewed
 
for a period of 40 years.
 
So the 50-year period, yes it is likely.
 
They are designed to be
 
able to be both stored in the dry fuel storage system as well as transported
 
to a final storage site.
- We have a follow-up
 
about the names of people
 
and the nature of
 
coordination with the licensee regarding the Community Engagement Panel:
please answer the question as
 
to whom you communicate with
 
to coordinate your
 
appearance and presentation.


would you say that these canisters can safely store nuclear waste at its current site for over 50 years or over 100 years?
- The Certificates of Compliance are being renewed for a period of 40 years.
So the 50-year period, yes it is likely.
They are designed to be able to be both stored in the dry fuel storage system as well as transported to a final storage site.
- We have a follow-up about the names of people and the nature of coordination with the licensee regarding the Community Engagement Panel:
please answer the question as to whom you communicate with to coordinate your appearance and presentation.
Who from Southern California Edison?
Who from Southern California Edison?
Who from the CEP? - When we're invited to attend  
Who from the CEP?
 
- When we're invited to attend a Community Engagement Panel meeting, it's Dr. David Victor, the chair of the panel, who typically extends the invitation.
a Community Engagement Panel meeting, it's Dr. David Victor, the chair of the panel, who typically extends the invitation.
I am not sure who Southern California Edison communicates, who they designate for
I am not sure who Southern California Edison communicates, who they designate for communicating with the CEP is.
I cannot speak for them.
- And a follow-up to the


question before that.
communicating with the CEP is.
I cannot speak for them.
- And a follow-up to the question before that.
Over 50 years of storage you'd say wouldn't exactly be safe, is the question from the public.
Over 50 years of storage you'd say wouldn't exactly be safe, is the question from the public.
(inaudible)  
(inaudible)
- That was not the statement.  
- That was not the statement.
 
We said that there is ample evidence that it would be safe in 50 years and beyond.
We said that there is ample evidence that it would be safe in 50 years and beyond.  
The canisters are not only designed to be maintained safely in the dry fuel storage system, but they are also designed for transportation to a final repository or an interim repository site.
 
- Yeah, I'll add onto that.
The canisters are not only  
There's many systems that have gone beyond their 20 years, and they've gone and done these inspections on these canisters and they're not seeing any issues of corrosion or deformation to the canisters.
 
And they're easily again renewed for another 40-year licensing period.
designed to be maintained safely  
- The questions have slowed down a little bit coming in.
 
in the dry fuel storage system, but they are also designed  
 
for transportation to a final repository or an interim repository site.  
- Yeah, I'll add onto that.  
 
There's many systems that have  
 
gone beyond their 20 years, and they've gone and done these inspections on these canisters and  
 
they're not seeing any issues  
 
of corrosion or deformation  
 
to the canisters.  
 
And they're easily again renewed for another 40-year licensing period. - The questions have slowed  
 
down a little bit coming in.
We want to remind everybody we have about 10, 15 minutes remaining here.
 
We do want to focus on
 
questions and comments that you might have about our decision to allow the resuming of
 
fuel transfer operations
 
at SONGS, at San Onofre.
 
Given the public health risks at stake, and given that the NRC is the regulating body, don't you feel that to simply
 
say that you don't anticipate
 
something to a canister, without
 
a backup plan, is a sufficient answer?


We want to remind everybody we have about 10, 15 minutes remaining here.
We do want to focus on questions and comments that you might have about our decision to allow the resuming of fuel transfer operations at SONGS, at San Onofre.
Given the public health risks at stake, and given that the NRC is the regulating body, don't you feel that to simply say that you don't anticipate something to a canister, without a backup plan, is a sufficient answer?
The canisters are scratched, on a seismic fault line, and in a tsunami zone.
The canisters are scratched, on a seismic fault line, and in a tsunami zone.
That is a-  
That is a-that's more of a comment than a question, but we do want to voice those so that they are part of the record.
 
- (inaudible)
that's more of a comment than a question, but we do want to voice those  
(inaudible)
 
- We have another request for additional-for elaboration from the public.
so that they are part of the record.  
The commenter says, I question your saying that the canisters are transportable as is, please cite your sources that ascertain that the present canisters with
- (inaudible) (inaudible) - We have another request for additional-  
 
for elaboration from the public.  
 
The commenter says, I  


question your saying
overpack are transportable.
 
- Yeah, these licenses, Holtec has a Part 71 license for them to be transportable.
that the canisters are transportable as is, please cite your sources that ascertain
So that's why they're called the multi-purpose canister.
 
They're both for storage and transportation.
that the present canisters with overpack are transportable. - Yeah, these licenses, Holtec has a Part 71 license  
So there is an NRC approved transportation license for these canisters.
 
I used to know the docket number, but I'd have to go to my computer to find it.
for them to be transportable.
- That's good.
So that's why they're called the multi-purpose canister.  
- Another question, do you anticipate that the NRC will be frequently monitoring the remaining spent fuel transfer to the dry cask storage?
 
- Yes, I do expect to do that.
They're both for storage  
I mentioned in my discussion that we anticipate conducting frequent inspections, on the order of several times a calendar quarter in order to observe ongoing activities since it'll be an ongoing continuous fuel loading, offloading campaign, sorry.
 
- I'd like to point out that
and transportation.  
 
So there is an NRC approved  
 
transportation license for these canisters.
I used to know the docket number, but I'd have to go to  
 
my computer to find it.  
- That's good.  
- Another question, do you  
 
anticipate that the NRC will be frequently monitoring the remaining  
 
spent fuel transfer to  
 
the dry cask storage?  
- Yes, I do expect to do that.  
 
I mentioned in my discussion that we anticipate conducting frequent inspections, on  
 
the order of several times  
 
a calendar quarter in order  
 
to observe ongoing activities  
 
since it'll be an ongoing continuous fuel loading, offloading campaign, sorry.  
- I'd like to point out that the transportation package has a name and it's
 
called the HI-STAR system.
 
And that's Holtec's transportation overpack. - Seems like the pace of questions
 
has slowed down quite a bit.
 
We want to give a last
 
opportunity for the attendees
 
who are viewing the webinar to add a few last questions and comments.
We're about 10 minutes from the
 
scheduled end of our discussion.
 
All right, we have another comment.
 
That there is no plan
 
for breached canisters, as in a backup plan if a canister were to breach, is extremely concerning and inadequate.
 
The thin-walled canisters do
 
not have a very long lifetime.
 
Your resistance to use better canisters
 
can only be explained by not wanting to pay the higher cost.
Is the public not important to you?
 
I think we can call that a
 
comment, as opposed to a question, but that is for the record.


the transportation package has a name and it's called the HI-STAR system.
And that's Holtec's transportation overpack.
- Seems like the pace of questions has slowed down quite a bit.
We want to give a last opportunity for the attendees who are viewing the webinar to add a few last questions and comments.
We're about 10 minutes from the scheduled end of our discussion.
All right, we have another comment.
That there is no plan for breached canisters, as in a backup plan if a canister were to breach, is extremely concerning and inadequate.
The thin-walled canisters do not have a very long lifetime.
Your resistance to use better canisters can only be explained by not wanting to pay the higher cost.
Is the public not important to you?
I think we can call that a comment, as opposed to a question, but that is for the record.
Oh and we have a request from the public, would the lady please restate her name?
Oh and we have a request from the public, would the lady please restate her name?
I missed it at first.  
I missed it at first.
- Yes, I'm Linda Howell.
- Yes, I'm Linda Howell.
I'm the Acting Director of the Region IV Division
of Nuclear Materials Safety.
- With that I think we're ready to end the-oh we have a couple
more comments coming in.
Getting that indication.


I'm the Acting Director of the Region IV Division of Nuclear Materials Safety.
- With that I think we're ready to end the-oh we have a couple more comments coming in.
Getting that indication.
The NRC approved license for transport, what is its name?
The NRC approved license for transport, what is its name?
Semi One and then there's a question mark.
Semi One and then there's a question mark.
Looking for the name that  
Looking for the name that we use for that license.
 
- It's called the HI-STAR system.
we use for that license.  
is what Holtec's name for it is.
- It's called the HI-STAR system.  
 
is what Holtec's name for it is.  
 
Has a Part 71 docket number, which is its license.
Has a Part 71 docket number, which is its license.
I don't know if it has a name other than that.  
I don't know if it has a name other than that.
- Actually it's another  
- Actually it's another Certificate of Compliance that's issued for transportation package, and I'm sure that if the questioner wanted to find more information on that, you could probably go to the NRC public webpage and actually just do a search on ours, using the name of the package and you should be able to locate information on it.
 
- All right, and with that we're going to bring a close
Certificate of Compliance  
 
that's issued for transportation package, and I'm sure that if the questioner wanted to find more information on that, you could  
 
probably go to the NRC public webpage  
 
and actually just do a search on ours, using the name of the package  
 
and you should be able to locate information on it. - All right, and with that  
 
we're going to bring a close to the public questions and comments period.
 
Linda if you have any, Linda or Lee, if you have any closing remarks. - Sure, thank you, Austin.
Again, I thank the audience
 
for participating this afternoon.
 
We think it's an important
 
part of our mission
 
is to be transparent and keep you informed.
The video and transcript from
 
this webinar will be posted
 
to the NRC Spotlight page under
 
the San Onofre Cask Loading issue portion
 
of the page along with other documents
 
that are relevant to the event and our follow-up activities.
We will be producing an inspection report
 
on those follow-on inspection activities
 
that I mentioned during my discussion.
 
That is probably a few weeks away.
 
We will continue to post inspection reports on the Spotlight page for San Onofre, when we do the future, as


of yet to be determined, resumption of fuel transfer operations, so that we can keep you informed.
to the public questions and comments period.
Linda if you have any, Linda or Lee, if you have any closing remarks.
- Sure, thank you, Austin.
Again, I thank the audience for participating this afternoon.
We think it's an important part of our mission is to be transparent and keep you informed.
The video and transcript from this webinar will be posted to the NRC Spotlight page under the San Onofre Cask Loading issue portion of the page along with other documents that are relevant to the event and our follow-up activities.
We will be producing an inspection report on those follow-on inspection activities that I mentioned during my discussion.
That is probably a few weeks away.
We will continue to post inspection reports on the Spotlight page for San Onofre, when we do the future, as of yet to be determined, resumption of fuel transfer operations, so that we can keep you informed.
And with that, we'll conclude the meeting.
And with that, we'll conclude the meeting.
Thank you.}}
Thank you.}}

Revision as of 16:10, 19 October 2019

Audio Transcript of June 3, 2019, Webinar
ML19183A362
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 06/03/2019
From:
Division of Nuclear Materials Safety IV
To:
References
Download: ML19183A362 (47)


Text

WEBINAR TRANSCRIPT This document provides the transcript from a public meeting (webinar) that was held on June 3, 2019, to update the public on the status of fuel loading at the San Onofre Nuclear Generating Station. Fuel transfer operations were suspended following an August 3, 2018, incident that resulted in the misalignment of a multi-purpose canister loaded with spent fuel at the San Onofre Nuclear Generating Station.

Hosts of Webinar:

Linda Howell, Acting Director Division of Nuclear Materials Safety Region IV Lee Brookhart, Senior ISFSI Inspector Reactor Inspection Branch Division of Nuclear Materials Safety Region IV

Good afternoon, and thank you for joining the webinar.

My name is Linda Howell, I'm the Acting Director of Region IV's Division of Nuclear Material Safety.

With me is Mr. Lee Brookhart, the region's Senior Dry Fuel Storage Inspector.

The purpose of this afternoon's meeting is to share information concerning NRC's evaluation of the final outstanding issue that I briefed you on back in March, which involves changes or exceptions planned for the UMAX Final Safety Analysis Report to accept that minor scratching might occur as the result of incidental contact between the multipurpose canisters and internal components of storage vaults in the UMAX dry fuel storage system.

Our discussion this afternoon will also cover the process that we used to make the determination that Southern California Edison could resume fuel transfer operations, and I will talk briefly about some activities that Southern California Edison has identified

as needing to occur before they begin active fuel transfer operations.

Next slide please.

As you see on the agenda, following discussion regarding NRC's decision on the resumption of fuel transfer operations we'll open the meeting to accept questions from our audience.

This is a Category 3 meeting, so public participation is encouraged.

However, due to the period of time that we have reserved for this webinar, and in the interest of fairness to all participants, I would like to ask that audience members limit their questions to two, initially, so that we can address questions from as many participants as possible in the time allotted.

As we've done in the past, questions and comments from today's session will be posted to our Spotlight page.

I acknowledge that several of you have provided feedback on our delay in responding to your questions from prior webinars, but we do have those in process now.

Up until now, our staff has been fully occupied with

inspecting SONGS efforts.

I'll also note that in addition to today's webinar Scott Morris, our Regional Administrator, and I will also be speaking at the San Onofre Community Engagement Panel meeting this coming Wednesday, June 5th.

We look forward to meeting with some of you directly and answering any questions that you may have.

Next slide please.

In the event of an emergency, all of us in the room will stay together and exit the building through the front doors.

We'll remain in the parking lot until the situation is over and we're allowed to reenter the building.

We will provide notification to the audience participants in the event that we do have an emergency.

Let me also ask the staff in the room to silence your cellphones during the meeting and please keep your voices down because the meeting is being recorded.

Lastly, be mindful that the meeting is being broadcast, so if individuals present need to exit the room,

please use the rear doors.

As noted in the slides, should we have technical difficulties with the webinar broadcast, a telephone bridge will be available.

The phone number for that bridge is on the slide.

The bridge line will only be activated if we experience technical difficulties with the broadcast.

These slides are available on the Spotlight portion of the NRC public webpage at www.nrc.gov.

From the Spotlight section on the left side of the page click on "SONGS Cask Loading Issue".

You'll find a file name with the NRC webinar presentation on our final determination on fuel loading operations.

The slides are also already available on the NRC's Agency-wide Document Access and Management System, or ADAMS.

The video and transcript from today's meeting will also be posted to the Spotlight section of our webpage.

In addition we'll post the comments and questions that we receive this afternoon.

Please note that the transcript of the meeting

and the questions will take a few weeks to be posted since NRC must receive the transcript from the contractor who is providing the webinar service, and review both the transcript and questions to ensure accuracy of the information.

We are also required by the Americans with Disabilities Act to provide closed captioning for the video.

We apologize in advance for the delays and inconvenience, but we cannot control or expedite this process.

Those of you who have registered for the webinar, however, will be able to access the video shortly after the conclusion of the meeting.

During the presentation, you may submit written comments and questions via the webinar chat room feature.

We'll answer questions and respond to comments as time allows.

This webinar is scheduled to end at 1 p.m. Pacific Time.

Next slide please.

I expect that many of you here today are familiar with the August 3rd incident

that occurred at San Onofre.

But because we have some attendees that have not followed this particular event and follow-on activities closely, I am going to provide a brief overview of key activities that have occurred since August 3, 2018.

On August 3rd, Southern California Edison was lowering a loaded spent fuel canister into its underground storage vault.

For the current fuel offload for Units 2 and 3, Southern California Edison is using the HI-STORM UMAX dry fuel storage system designed by Holtec International which provides dry spent fuel storage in a vertical below grade configuration.

As that canister was being lowered into the storage vault, the licensee personnel failed to notice that the canister was misaligned and was not being properly lowered.

Licensee personnel continued to lower the lifting equipment until they believed that the canister was fully lowered into the bottom of the storage vault.

As the staff prepared to approach the ISFSI pad, a radiation protection technician

identified elevated radiation levels that were not consistent with a fully-lowered canister.

Licensee personnel participating in the evolution then identified that the loaded spent fuel canister was resting on a metal shield ring near the top of the storage vault, preventing it from being lowered, and that the rigging was completely slack, no longer bearing the load of the canister.

With the vertical cask transfer system lift beam completely lowered, and that equipment is used to lower and lift canisters into and from the storage vaults, the important-to-safety slings were disabled from performing their safety function of suspending and controlling the loaded spent fuel canister.

The licensee estimated that the canister could have experienced an approximate 17 to 18 foot drop into the storage vault if the canister had slipped off the metal ring or if the metal ring failed.

This load drop accident is not a condition analyzed

in the dry fuel storage system's Final Safety Analysis Report, which is tied to the Certificate of Compliance or the licensing document.

The licensee estimated that the canister was in an unanalyzed drop condition for a period of 45 minutes to one hour.

Licensee personnel did restore control of the canister load.

They repositioned the canister and safely lowered it into the storage vault.

The licensee halted all dry fuel storage movements to fully investigate the incident and develop corrective actions.

The licensee also promptly shared operational experience with other users of the UMAX storage system.

Currently there is only one other site that uses the UMAX dry fuel storage system in the United States, and that's the Callaway plant in Missouri.

Region IV became aware of the incident on August 6th when Southern California Edison provided a courtesy phone call to our staff and described the incident as a near-miss event.

NRC staff determined that the licensee should have made a 24-hour event report to the NRC operations center and informed Southern California Edison staff of their determination.

During discussions with Region IV managers on August 6th, including myself, Southern California Edison committed to suspend fuel transfer operations until they completed an investigation of the incident, understood the causes, and implemented corrective actions based on their investigation findings.

They further committed to continue to suspend fuel transfer operations until NRC completed an independent investigation, and was satisfied that Southern California Edison's corrective actions were adequate.

Hence, the prolonged suspension of fuel transfer operations at the site.

Next slide please.

NRC initiated a special inspection and had an inspection team onsite the week of September 10, 2018, to interview personnel, observe equipment, and review relevant documentation,

including the licensee's investigation and proposed corrective actions.

The inspection included many hours of subsequent in-office review of the licensee's many causal analyses and technical assessments that were not complete at the time of the onsite portion of our inspection.

The special inspection report was issued on November 28, 2018, with an errata published on December 19th.

The report documented three Severity Level IV Violations, which are the lowest safety significance for cited violations under our enforcement policy.

The report also described two apparent violations, which were considered for escalated enforcement action.

The three Severity Level IV violations involved failures to establish measures to ensure that conditions adverse to quality were promptly identified and corrected, and that refers to the licensee's formal corrective action program, failure to ensure operations of equipment and controls identified as important to safety

were limited to trained and certified personnel, and a failure to provide qualitative or quantitative acceptance criteria in procedures to ensure that important activities are accomplished as planned during dry fuel storage operations.

Correspondence transmitting the special inspection report offered the choice of participation in a predecisional enforcement conference or an alternate dispute resolution session to address the apparent violations.

Southern California Edison elected to participate in a predecisional enforcement conference.

That conference was conducted on January 24, 2019, and was broadcast via public webinar.

Next slide please.

NRC inspectors began Follow-up inspections at SONGS in November 2018 to independently assess the licensee's corrective actions and technical assessments.

The inspection effort is now reaching its conclusion.

During the follow-up inspections, NRC identified several

weaknesses and corrective actions implemented by the licensee.

These included: causal evaluations did not address radiation protection issues, which we believed contributed to some of the causal factors associated with the incident, and changes made to the executive oversight board process were inadequate, meaning they were more administrative than substantive.

Procedure changes, particularly for the downloading procedure, lacked contingency steps for equipment failures, had incomplete criteria for suspending downloading operations, and had incomplete steps to meet seismic criteria during canister transport from the fuel building to the spent fuel storage pad.

We also noted a weakness in review of maintenance procedures.

The new equipment enhancements put in place were improperly designated as not important-to-safety, when they should have been important-to-safety,

the new load sensing devices were not procured in accordance with the vendor's design purchase specifications, and the load sensing devices were not tested to the appropriate load capacity.

While we did identify weaknesses, I want to note specifically that the equipment was not used to transfer fuel prior to correcting these issues.

The licensee also identified that past movement of loaded canisters from the fuel building to the storage pad may have resulted in the transport unit coming too close to structures along the route.

NRC inspectors identified that when the Vertical Cask Transporter, which again, is used to move the canister on the storage pad, approached the storage vault mating device, licensee personnel prematurely removed a seismic restraint, contrary to the associated seismic analysis.

These weaknesses factored into the NRC's decision on proposing a civil penalty

for the escalated enforcement action.

Next slide please.

On March 25, 2019, the final enforcement action was issued, and a public webinar was conducted the same day to discuss the final action with public stakeholders.

The final enforcement action included two violations.

The first violation involved the failure to ensure that important-to-safety equipment was available to provide redundant drop protection for a loaded spent fuel canister during canister downloading.

The spent fuel storage system used by Southern California Edison requires its spent fuel canister be lifted and carried with redundant drop protection features.

This was categorized as a Severity Level II violation.

The NRC considered whether credit was warranted for identification and corrective action.

No identification credit was given because the violation was identified through a self-revealing event.

No corrective action credit was granted based on several considerations,

including the weaknesses that I just discussed.

In accordance with the NRC enforcement policy, this violation was assessed a $116,000 civil penalty.

I just want to pause and note that issuance of a Severity Level II violation, the second most safety significant category under our enforcement policy, has never been done for a spent fuel storage licensee.

The second violation involved failure to make timely notification to the NRC.

Licensees are required to notify the NRC within 24 hours1 days <br />0.143 weeks <br />0.0329 months <br /> of the discovery of events involving spent fuel in which important-to-safety equipment is disabled or fails to function as designed.

This violation was categorized as a Severity Level III violation.

Since SONGS has not been the subject of escalated enforcement within the past two years, corrective action credit was considered.

The NRC did determine a corrective action credit was warranted, and no civil penalty was assessed for that violation.

A response to the Notice

of Violation was received by NRC on April 23, 2019.

We reviewed the licensee's response and found it satisfactory.

But I want to note that our review of the licensee's corrective actions, as described in their correspondence, was supplemented by our many months of inspection activities.

Region IV representatives subsequently attended the SONGS Community Engagement Panel meeting in California on March 28th.

We were represented by the Region IV Regional Administrator, Scott Morris, and myself.

Along with staff from the Office of Public Affairs and the Office of Congressional Affairs, Scott and I also met with congressional district staffers on March 28th while we were in Southern California.

We discussed all the observations of our follow-on inspection and the final enforcement action during those engagements.

I also want to note or remind you that during the March 25th public webinar, and the March 28th Community

Engagement Panel meeting, we discussed the licensee's corrective actions and observations from the NRC's follow-up inspection that was initiated back in November 2018, and which is still ongoing.

NRC noted that while certain weaknesses in the licensee's corrective actions were observed, with one exception, all corrective actions and observed weaknesses had been addressed as of the March 25th webinar.

The one outstanding issue involves scratching of canisters during fabrication or handling prior to insertion, during canister insertion, and possibly during future canister withdrawal.

This was determined to be an outstanding compliance issue, not a safety issue, which needed to be resolved before the licensee resumed fuel transfer operations.

And with that, let's move on to the next slide, and resolution of that outstanding issue and the path to resuming fuel transfer operations.

The issue of incidental contact

during canister insertion and the potential for scratching was initially discussed with Southern California Edison when we began our follow-up inspection back in November 2018.

Southern California Edison reviewed several approaches to demonstrate that potential scratching, due to incidental contact between canisters and the internal storage vault components, would not exceed allowable American Society of Mechanical Engineers, or ASME, code limits.

I'll also note that the technical specifications associated with this Certificate of Compliance do reference Section III of the ASME Code.

Southern California Edison ultimately initiated in situ visual assessments of downloaded canisters using robotics and three-dimensional video imaging.

We talked a little bit about this at the March 28th Community Engagement Panel meeting.

That method of examination

is commonly used in the aeronautics industry and is being examined for future use as an option in spent fuel canister aging management programs.

The statistically suitable number of canisters, a total of eight, were examined with imaging of the canister wall surfaces.

Using a statistical analysis methodology, and the actual canister wear data, as visualized during the three-dimensional imaging, the licensee concluded that there is 95% probability with a 95% confidence level that a scratch after canister insertion and withdrawal would not be any deeper than what is allowed under the ASME Code.

Their evaluation encompasses scratches that might occur during insertion, scratches that might occur during withdrawal, and assumes that those two models of scratches may be superimposed.

The evaluation also considers the potential for these scratches to overlay flaws that may have resulted during fabrication

or handling prior to downloading.

The scratch depth calculated by the licensee's analysis is viewed as conservative within the allowable ASME Boiler and Pressure Vessel Code limits.

For this situation, the applicable limit for wear is less than 10% of the canister wall thickness.

The licensee then used the 10 CFR 72.48 review process to support a change to sections of the UMAX Final Safety Analysis Report to acknowledge that some canister scratching or wear may occur during operational activities.

And if you recall our earlier discussions in March, there are two subsections of the Final Safety Analysis Report that stated that there was ample room between the canister and the interior wall of the storage vault such that no scratching could occur.

That's since been demonstrated to not be the case.

Next slide please.

So let's move on to the NRC's evaluation.

Now that I've shared what

Southern California Edison has completed in its evaluation, I'll explain what the NRC has done in terms of our assessment of that evaluation.

First, we had an inspector on site to observe seven of the eight canister examinations.

Our inspection activities were focused on verifying the effectiveness of the process and the validity of the data obtained, so that we would be better prepared to review Southern California Edison's report.

So our inspector was actually standing side by side with Southern California Edison's contractor looking at the data as it was transmitted so that we could verify that the data in Southern California Edison's report was the same as what we saw while the examination was ongoing.

We did not simply accept a report from Southern California Edison.

We independently validated the data obtained during the canister examinations.

NRC staff also performed independent statistical assessments using several methods which verified that the licensee's evaluation reasonably bounds

the maximum scratch depth.

We used a staff member who has a doctorate degree in statistics to verify the licensee's analysis.

That staff member also used the actual data obtained through the visual assessments to perform independent statistical analyses using several models that were appropriate for the sample size.

Our conclusion, through our independent assessments, is that the conclusion presented by Southern California Edison was conservative and reasonably bounds the maximum anticipated scratch or wear resulting from operational activities.

Next slide please.

I and my staff briefed senior agency management on our conclusions, and on May 17th I was authorized to notify senior Southern California Edison management that NRC had completed its review of the canister scratching analysis and accepted the Southern California Edison evaluations.

Southern California Edison was informed that once they confirmed that they were confident

that all corrective actions had been completed to their satisfaction, the NRC has no objection to them resuming fuel transfer operations.

Southern California Edison documented the basis for their decision to prepare to resume fuel transfer operations in a letter to the NRC dated May 17th.

That letter is now publicly available in our electronic document system, or ADAMS, and the document is also available in the Spotlight section of the NRC webpage.

In its correspondence Southern California Edison described additional activities that must occur prior to resuming fuel transfer operations.

These include training employees, ensuring that personnel qualifications are in place, and completing certain equipment checks.

Completion of these activities is expected to take several weeks, and Southern California Edison is committed to provide us verbal notification when they are ready to resume fuel transfer operations, in

advance of actually doing so.

In the interim, I and my staff continue weekly teleconferences with senior Southern California Edison managers to obtain updates on site activities so that we can plan our inspection and oversight activities effectively.

Depending on the type and extent of training that will need to be done prior to resuming fuel loading we may be on site to observe those activities.

Once the licensee resumes fuel transfer operations, we will initiate unannounced inspections that will be performed frequently to observe the licensee's implementation of their enhanced programs.

I anticipate performing inspections several times for a few days during the calendar quarter, and then we will produce formal reports to let the public know how the activities are proceeding.

We'll continue to engage with the public to keep you informed.

We plan to support the upcoming June 5th Community Engagement Panel meeting,

and we are developing strategies for holding a public meeting in a community local to SONGS.

With that, I'd like to turn the meeting over to our facilitator, Mr. Austin Roberts.

Austin has been monitoring questions as they've been submitted during the webinar.

And again, I want to note that in the interest of fairness, we'll limit questions from a single audience member to two, so that we can maximize the ability for all participants to submit questions, and then we'll come back for additional submittals as time permits.

Thank you.

- Good morning, or good afternoon.

My name is Austin Roberts and as facilitator for this meeting I will be asking questions and addressing comments from the public and putting them to our panel here.

From the back of the room, so far we have not had any public questions put to us through the attendees of the webinar.

If you are attending the webinar, you have a Questions tab at the side of your screen, which you can use to put questions to us.

It is similar to an instant message feature.

We'll be seeing those on our side, and we'd be happy to address any public comments or questions that you may have regarding our decision to allow the resumption of fuel transfer operations.

Our first question from the public, how is the NRC factoring lessons learned from the San Onofre event into its oversight efforts at other sites?

- That's a great question, and we have talked about that in the past.

We will be collectively, with our peers in the other regional offices and the applicable division in the Office of Nuclear Materials Safety and Safeguards, taking a look at the oversight process.

By that I mean our inspection procedures, to see if anything can be enhanced to either look at things in different sequences or at different frequencies.

- Thank you.

If there are any other

questions from the public, again, it's the Questions tab, it should be on the right-hand side of your screen.

Our second question from the public, excuse me one second, the contents of can number 30 were removed from the spent fuel pool 10 months ago.

Canister number 30 is now in the fuel handling building inside a transfer cask; is the NRC concerned about dangerous heat buildup inside canister number 30?

And they also want to know if you can tell us what is the internal and exterior temperatures of can number 30?

- When we were on site during January and February we did go into the building that contains the canister number 30.

We are not concerned with the heat on the canister.

They go in every day, I think two times a day, every 12 hours0.5 days <br />0.0714 weeks <br />0.0164 months <br /> and take measurements on the outside of the canister, and is well below any kind of the design safety values.

So there's no concern on the canister.

It can stay in the fuel building

indefinitely, if need be.

- Thank you.

Will there be any design changes to the ceiling alignment rings in the vaults?

- At the present time we have no indication from Holtec that they anticipate any design change with those components.

- I have another design related question:

Are you addressing the substandard thin casings issue?

We need the super thick casings that are transportable to be used instead.

- I'll take that one.

The canisters that are in use for the UMAX spent fuel storage system have been approved, and there is no foreseeable safety issue with them.

- Thank you.

Did the NRC's root cause analysis determine that gouging on the walls is caused by a lack of a precision canister downloading system?

- The NRC evaluated the root cause analyses completed by Holtec- or by Southern California Edison and its contractor Holtec.

And we have no indication that the gouging

needs to have any further evaluation.

We're comfortable with their conclusions on how the gouging, actual scratching occurred.

- Thank you.

Will the NRC be on hand for the first canister loading once it resumes?

- Yes, we do plan to be on hand when the licensee resumes fuel transfer operations.

I mentioned in my discussion that we are holding weekly conversations with Southern California Edison, and the purpose of those conversations is to actually be aware of what their schedule and their anticipated resumption date is.

- Our next question is about the physical condition of the canisters.

The canisters would have months of coastal salt air and soot baked onto the surface.

How did the licensee clean the surface of the canisters before the visual inspection with the cameras?

- There was no need to clean the exterior of the canister.

The robot could very easily determine where, if any, scratches or where marks were

and what the depth were, or the depth was, each scratch that it found.

There was no reason to clean it.

- Another question, can you tell us what the target date to resume loading is?

- No, we actually can't speak to that.

That will be a decision made by Southern California Edison.

And as I mentioned, it depends on several factors including the need to do training and qualified personnel as well as equipment checks.

So we have no projected timeline for that at this point.

- Thank you.

According to a number given by-according to a number given at the predecisional enforcement conference, canisters one through four have an estimated 51 broken bolts and shims between them, or shim standoffs, has the NRC determined that these canisters are safe?

- Yes, so the four canisters in question relating to the shim standoff was an issue that has been identified by the licensee to the NRC, and that has been, went through-the Division of Spent

Fuel Management reviewed, because it's a generic concern.

It's not just Southern California Edison's canisters that were affected.

They did provide analysis to our Division of Spent Fuel Management that they did review, and those canisters are safe for storage, and there's no issues with them continuing to be stored at Southern California Edison.

- I have another question about the thickness of the canister walls, or a comment, rather.

The lack of concern about what a leak out of these thin canisters would mean to containment is still evident by the nonchalant answers provided.

Thick-walled canisters should be provided for public safety.

- That's a comment?

- That's a comment, not a question, but we do want to respect those comments and make sure that your comments are brought to attention.

What ASME pressure vessel in service code was used to determine that less than 10% gouging is acceptable?

- That value comes from Section III of the ASME Boiler and

Pressure Vessel Code.

- Thank you.

A question I asked earlier, that you did answer, was about whether the NRC determined that a root cause from our root cause analysis determined that gouging of the walls was caused by the contractor's lack of precision canister downloading system; a follow-on question to that is, what was the root cause that was derived from that root cause analysis?

- The root cause was more than just looking into the design.

It was looking at the training, the corrective action program, the procedures, and what led to the two individuals being out on the pad that disabled the important-to-safety slings.

So it really looked at the root cause.

And the root cause was basically that the management had failed to recognize the implications of a long storage campaign operation where usually they're a lot shorter unless they're unloading the whole pool to pad, and all the new influx of new individuals,

the training, the procedures.

So it really combined a bunch of contributing causes.

- Thank you.

We still have time for some more questions.

Again, we would like the focus of this question and comment to be about our decision to allow the resumption of fuel transfer operations.

Here we have one, another question.

Does the NRC agree that the scratches heal over time?

- On stainless steel There is, it's called, re-, re-,

I can't think of the word.

Cast, bind, or something.

Yes, I don't know if they necessarily heal.

But I have heard of that term.

I don't know if I definitely believe that.

- I believe that's terminology that has been used by Southern California Edison at various public meetings.

- Thank you.

We have a question about the licensee, how are public safety concerns being addressed given that Edison has discontinued the alert system?

- The alert system, if it's the notification system required under Emergency Preparedness Programs, is something that needs to be active while the facility is in operation.

Once they decommission and they are no longer operating, that system can be eliminated under exemption authorized by the NRC.

- Thank you.

Our next question from the public:

the NRC has claimed that the cans are compliant with ASME code but they are not ASME certified.

Can you explain the difference?

Can you explain why not?

- Sure, I'll take that and Lee can supplement if he chooses to.

These canisters under 10 CFR Part 72, they are not required to be fully ASME certified because they are not a true pressure vessel.

However, the ASME code is recognized as an acceptable method of demonstrating certain design features.

And for the technical specifications associated with this Certificate of Compliance,

Holtec International did refer to certain sections of the ASME Code.

- Thank you.

What monitoring mechanism is being provided on the storage canisters?

And what schedule to guarantee that no leaks are about to occur?

- Do you want to take that?

- Well the licensee does have radiation protection, TLDs or monitoring systems, set up around their owner controlled barrier and around the ISFSI that would monitor for any type of release.

On the system itself there's temperature monitoring and they also inspect the vents to ensure that they're open on a daily basis.

So if any kind of rise in temperature above a certain degree, they would go out and look at the canister and verify everything's acceptable.

- Thank you.

How was the Final Safety Analysis Report able to be revised regarding possibility of an acceptability of scratches without approval from the NRC?

- Under the 72.48 process, the licensee

is allowed to make design changes to their systems.

They have a set of questions to go through that's listed in the regs that they must answer, and that if they do pass, then they can make that change.

Only when they do not pass those questions would they have to submit it to the NRC for review and approval.

And the scratches did pass all those questions.

- Thank you.

We have a follow-up to our question from before about the alert system at San Onofre.

It's a follow-up:

Given the near accident being discussed today, is it possible that the NRC can require the licensee to restart the alert system?

- We generally would not do that.

And I don't know who posed the question, but we've stated in several public meetings that even if the canister would have dropped into the storage vault, its integrity would have been maintained and there would have been no release of radioactive materials.

- Thank you.

Could you describe your coordination with SCE and the Community Engagement Panel regarding presenting at the CEP meeting?

Please advise the names of persons from the NRC that communicate with SCE and the Community Engagement Panel.

Who from the licensee has communicated with the NRC about the same issue?

- Could you repeat That question please?

- I think they want the names of individuals from the NRC and from the licensee that were in communication in preparing for the Community Engagement Panel.

- I generally serve as the primary communication point between the Community Engagement Panel, and that's independent from my contacts with Southern California Edison.

I'm also one of the primary contacts for the regional office, at least for inspection oversight activities, with Southern California Edison managers.

- Thank you.

We have a question about, again about ASME compliance.

What about internal pressure

buildup from hydrogen off gassing from damaged fuel.

Would that not make the fuel canister a pressure vessel?

- The canisters are drained of all water, down to vacuum levels, and then back-filled with helium.

So there is no hydrogen generation in here because there's no water to be separated to make hydrogen.

Helium's a noble gas.

It's not going to divide on its own.

So there would be no risk of hydrogen buildup inside the canister.

So once they're back filled with helium to a certain value it's going to stay that value until it's eventually opened to remove the canisters, or the fuel.

- Next question is, if monitoring shows that a breach has happened, how would you transport the breached canister, to which location and structure, to prevent further leaks from the damaged canister and then what would be the ultimate fate if there were a breach of the canister?

- At the present time there's no anticipated breaching of canisters.

They're stable, they're designed

to remain in dry storage for many, many years.

If a canister, if something happened to a canister, the licensee would have to come up with a plan.

Generally we believe they would probably use an overpack of the canister.

- Thank you.

We have a couple questions along the same lines.

The commenter says: my understanding is that there is at least a liter of water in each canister; can the expert prove his claim?

And again, a second question, are you saying there is no water in the canister?

- Yeah, they're vacuumed down to very low levels, and at the system used at Southern California Edison they used forced helium dehydration to remove all water from the system.

So there is no, there is no water in these systems, definitely not a liter of water, really none.

- Thank you.

Looking at long-term storage, a question from the public is,

would you say that these canisters can safely store nuclear waste at its current site for over 50 years or over 100 years?

- The Certificates of Compliance are being renewed for a period of 40 years.

So the 50-year period, yes it is likely.

They are designed to be able to be both stored in the dry fuel storage system as well as transported to a final storage site.

- We have a follow-up about the names of people and the nature of coordination with the licensee regarding the Community Engagement Panel:

please answer the question as to whom you communicate with to coordinate your appearance and presentation.

Who from Southern California Edison?

Who from the CEP?

- When we're invited to attend a Community Engagement Panel meeting, it's Dr. David Victor, the chair of the panel, who typically extends the invitation.

I am not sure who Southern California Edison communicates, who they designate for

communicating with the CEP is.

I cannot speak for them.

- And a follow-up to the question before that.

Over 50 years of storage you'd say wouldn't exactly be safe, is the question from the public.

(inaudible)

- That was not the statement.

We said that there is ample evidence that it would be safe in 50 years and beyond.

The canisters are not only designed to be maintained safely in the dry fuel storage system, but they are also designed for transportation to a final repository or an interim repository site.

- Yeah, I'll add onto that.

There's many systems that have gone beyond their 20 years, and they've gone and done these inspections on these canisters and they're not seeing any issues of corrosion or deformation to the canisters.

And they're easily again renewed for another 40-year licensing period.

- The questions have slowed down a little bit coming in.

We want to remind everybody we have about 10, 15 minutes remaining here.

We do want to focus on questions and comments that you might have about our decision to allow the resuming of fuel transfer operations at SONGS, at San Onofre.

Given the public health risks at stake, and given that the NRC is the regulating body, don't you feel that to simply say that you don't anticipate something to a canister, without a backup plan, is a sufficient answer?

The canisters are scratched, on a seismic fault line, and in a tsunami zone.

That is a-that's more of a comment than a question, but we do want to voice those so that they are part of the record.

- (inaudible)

(inaudible)

- We have another request for additional-for elaboration from the public.

The commenter says, I question your saying that the canisters are transportable as is, please cite your sources that ascertain that the present canisters with

overpack are transportable.

- Yeah, these licenses, Holtec has a Part 71 license for them to be transportable.

So that's why they're called the multi-purpose canister.

They're both for storage and transportation.

So there is an NRC approved transportation license for these canisters.

I used to know the docket number, but I'd have to go to my computer to find it.

- That's good.

- Another question, do you anticipate that the NRC will be frequently monitoring the remaining spent fuel transfer to the dry cask storage?

- Yes, I do expect to do that.

I mentioned in my discussion that we anticipate conducting frequent inspections, on the order of several times a calendar quarter in order to observe ongoing activities since it'll be an ongoing continuous fuel loading, offloading campaign, sorry.

- I'd like to point out that

the transportation package has a name and it's called the HI-STAR system.

And that's Holtec's transportation overpack.

- Seems like the pace of questions has slowed down quite a bit.

We want to give a last opportunity for the attendees who are viewing the webinar to add a few last questions and comments.

We're about 10 minutes from the scheduled end of our discussion.

All right, we have another comment.

That there is no plan for breached canisters, as in a backup plan if a canister were to breach, is extremely concerning and inadequate.

The thin-walled canisters do not have a very long lifetime.

Your resistance to use better canisters can only be explained by not wanting to pay the higher cost.

Is the public not important to you?

I think we can call that a comment, as opposed to a question, but that is for the record.

Oh and we have a request from the public, would the lady please restate her name?

I missed it at first.

- Yes, I'm Linda Howell.

I'm the Acting Director of the Region IV Division of Nuclear Materials Safety.

- With that I think we're ready to end the-oh we have a couple more comments coming in.

Getting that indication.

The NRC approved license for transport, what is its name?

Semi One and then there's a question mark.

Looking for the name that we use for that license.

- It's called the HI-STAR system.

is what Holtec's name for it is.

Has a Part 71 docket number, which is its license.

I don't know if it has a name other than that.

- Actually it's another Certificate of Compliance that's issued for transportation package, and I'm sure that if the questioner wanted to find more information on that, you could probably go to the NRC public webpage and actually just do a search on ours, using the name of the package and you should be able to locate information on it.

- All right, and with that we're going to bring a close

to the public questions and comments period.

Linda if you have any, Linda or Lee, if you have any closing remarks.

- Sure, thank you, Austin.

Again, I thank the audience for participating this afternoon.

We think it's an important part of our mission is to be transparent and keep you informed.

The video and transcript from this webinar will be posted to the NRC Spotlight page under the San Onofre Cask Loading issue portion of the page along with other documents that are relevant to the event and our follow-up activities.

We will be producing an inspection report on those follow-on inspection activities that I mentioned during my discussion.

That is probably a few weeks away.

We will continue to post inspection reports on the Spotlight page for San Onofre, when we do the future, as of yet to be determined, resumption of fuel transfer operations, so that we can keep you informed.

And with that, we'll conclude the meeting.