{{#Wiki_filter:. .m ,, , ,9---*^*H M-NETROPOL1 TAN EDISON COMPANY suastouavorceneam.rusucununescoaronn_ov POST OFFICE BOX 420 MIDDLETOWM. PENNSYLVANIA 17057 TELEPMONE 717 944-404*
{{#Wiki_filter:m ,, , ,9
April 22,1975 g_= . -fir. J.P. O'Refily, Director Directorate of Regulatory Operations Region I Df M >v-''631 Park Avenue
                                                  -
{h King of Prussia, Pa.
    - -
19406 b. mLMliiOh Sperating License DPR-50 Occket 50-289
                    . .
-
                                *     ^
                                          *H M-NETROPOL1 TAN EDISON COMPANY suastouavorceneam.rusucununescoaronn_ov POST OFFICE BOX 420 MIDDLETOWM. PENNSYLVANIA 17057                 TELEPMONE 717 944-404*
April 22,1975 g_
                                                                                      = . -
fir. J.P. O'Refily, Director Directorate of Regulatory Operations Region I                                   Df                         '
631 Park Avenue M >v h
                                                                            -
                                                                                '
{
King of Prussia, Pa. 19406                         b. mLMliiOh Sperating License DPR-50 Occket 50-289
                                                  -


==Subject:==
==Subject:==
Abnormal Occurn!nce No AD 75-12 Cear Mr. O'Reilly:
Abnormal Occurn!nce No AD 75-12 Cear Mr. O'Reilly:                                         -
-This telegram is to confirm the telecon between i.ee Spessard Region I-NRC.
This telegram is to confirm the telecon between i.ee Spessard Region I-NRC.
and J.G. Herbeitn (THI Station Superintendent) at 1400 hours 21 April 1975.
,        and J.G. Herbeitn (THI Station Superintendent) at 1400 hours 21 April 1975.
, I The following report is submitted in accordance with paragraph 6.7.2.a.1 (page 6-11) of technical specifications.
I         The following report is submitted in accordance with paragraph 6.7.2.a.1
,!On 21 April, while performing High and Low Pressure Injection Surveillance Testing, RR-P1B (Reactor Building ~ Emergency Cooling River Pu.T.p) failed to start on signal.
,        (page 6-11) of technical specifications.
The punp was then manually started f.om the control room using the control switch.
!
lThe redundant pos:p, RR-PIA. was tested to verify operability.
On 21 April, while performing High and Low Pressure Injection Surveillance Testing, RR-P1B (Reactor Building ~ Emergency Cooling River Pu.T.p) failed to start on signal. The punp was then manually started f.om the control room using the control switch.
l        The redundant pos:p, RR-PIA. was tested to verify operability.
An investigation is currently in progress to determine the reason RR-P1B failed to start on receipt of test signal.
An investigation is currently in progress to determine the reason RR-P1B failed to start on receipt of test signal.
Following the detemination of the reason RR-P1B failed to start, the neces-sary corrective action will be taken and RR-PIB will be tested and returned to service.
Following the detemination of the reason RR-P1B failed to start, the neces-sary corrective action will be taken and RR-PIB will be tested and returned to service.
Very truly yourt,)klh ?E2l, J erbein.(Station Superintendent JGH/dmn-G82 ,, hg1024 0i36
Very truly yourt, l
.]',}}
                                                        ,                    )klh ?E2
                                            . J       erbein
(   Station Superintendent JGH/dmn
                                                                        -G82
                                                                        ,,
      '
                                                ,
hg1024 0i36           .
                                                                                            ]}}

Revision as of 13:21, 19 October 2019

Abnormal Occurrence 75-12:on 750421,during High & Low Pressure Injection Surveillance Test,Emergency Cooling River Pump Failed to Start on Signal.Redundant Pump Operated Successfully.Cause of Failure Not Yet Determined
ML19210A223
Person / Time
Site: Crane 
Issue date: 04/22/1975
From: Herbein J
METROPOLITAN EDISON CO.
To:
Shared Package
ML19210A220 List:
References
NUDOCS 7910240936
Download: ML19210A223 (1)


Text

m ,, , ,9

-

- -

. .

  • ^
  • H M-NETROPOL1 TAN EDISON COMPANY suastouavorceneam.rusucununescoaronn_ov POST OFFICE BOX 420 MIDDLETOWM. PENNSYLVANIA 17057 TELEPMONE 717 944-404*

April 22,1975 g_

= . -

fir. J.P. O'Refily, Director Directorate of Regulatory Operations Region I Df '

631 Park Avenue M >v h

-

'

{

King of Prussia, Pa. 19406 b. mLMliiOh Sperating License DPR-50 Occket 50-289

-

Subject:

Abnormal Occurn!nce No AD 75-12 Cear Mr. O'Reilly: -

This telegram is to confirm the telecon between i.ee Spessard Region I-NRC.

, and J.G. Herbeitn (THI Station Superintendent) at 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br /> 21 April 1975.

I The following report is submitted in accordance with paragraph 6.7.2.a.1

, (page 6-11) of technical specifications.

!

On 21 April, while performing High and Low Pressure Injection Surveillance Testing, RR-P1B (Reactor Building ~ Emergency Cooling River Pu.T.p) failed to start on signal. The punp was then manually started f.om the control room using the control switch.

l The redundant pos:p, RR-PIA. was tested to verify operability.

An investigation is currently in progress to determine the reason RR-P1B failed to start on receipt of test signal.

Following the detemination of the reason RR-P1B failed to start, the neces-sary corrective action will be taken and RR-PIB will be tested and returned to service.

Very truly yourt, l

, )klh ?E2

. J erbein

( Station Superintendent JGH/dmn