ML111930167: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 1: Line 1:
{{Adams
#REDIRECT [[W3F1-2011-0038, 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies]]
| number = ML111930167
| issue date = 07/11/2011
| title = 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies
| author name = Kowalewski J A
| author affiliation = Entergy Nuclear South, Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/NRR, NRC/Document Control Desk
| docket = 05000382
| license number = NPF-038
| contact person =
| case reference number = BL-11-001, W3F1-2011-0038
| package number = ML111930166
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390
 
W3F1-2011-0038  
 
July 11, 2011
 
U.S. Nuclear Regulatory Commission
 
Attn: Document Control Desk
 
Washington, DC  20555
 
==SUBJECT:==
60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies Waterford Steam Electric Station, Unit 3 (Waterford 3)
 
Docket No. 50-382
 
License No. NPF-38
 
==Dear Sir or Madam:==
 
The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, "Mitigating Strategies,"
 
dated May 11, 2011 (0CNA051103), to request each licensee to provide a comprehensive
 
verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).
 
In Bulletin 2011-01, the NRC requested each licensee to submit a written response within
 
30 days of the date of the bulletin which was provided on June 10, 2011 (0CAN061101).
 
The attachment to this letter forwards the response requested within 60 days of the date of the
 
bulletin to provide information regarding mitigation strategies programs for 10 CFR 50.54(hh)(2). 
 
The attachment includes information that addresses measures that are currently in place. The attachment to this letter contains security-related information that should be withheld from public
 
disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been
 
marked accordingly with the notation "Security-Related Information - Withhold Under 10 CFR 2.390."  There are no new commitments contained in this submittal. If you need any additional
 
information, please contact William J. Steelman at (504) 739-6685.
 
Entergy Nuclear South Entergy Operations, Inc.
 
17265 River Road
 
Killona, LA 70057-3093
 
Tel    504 739 6660
 
Fax  504 739 6678 jkowale@entergy.com Joseph A. Kowalewski Vice President, Operations Waterford 3 W3F1-201 1-0038 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct.Executed on July 11,2011.Sincerely,////.JAK/R
 
==Attachment:==
 
60-Day Response to NRC Bulletin 2011-01 cc: Mr.Elmo Collins Regional Administrator U.S.Nuclear Regulatory Commission Region IV 612 E.Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Waterford Steam Electric Station, Unit 3 P.O.Box 822 Killona, LA 70066-0751 U.S.Nuclear Regulatory Commission Attn: Mr.Kaly Kalyanam Mail Stop 0-8 E9 Rockville, MD 20852 Kaly.Kalyanamnrc.gov This letter contains security-related information
-The attachment is withheld from public disclosure per 10 CFR 2.390}}

Revision as of 02:58, 20 August 2019