W3F1-2011-0038, 60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies

From kanterella
Jump to navigation Jump to search
60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies
ML111930167
Person / Time
Site: Waterford Entergy icon.png
Issue date: 07/11/2011
From: Kowalewski J
Entergy Nuclear South, Entergy Operations
To:
Office of Nuclear Reactor Regulation, Document Control Desk
Shared Package
ML111930166 List:
References
BL-11-001, W3F1-2011-0038
Download: ML111930167 (2)


Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504 739 6660 Fax 504 739 6678 jkowale@entergy.com Joseph A. Kowalewski Vice President, Operations Waterford 3 W3F1-2011-0038 July 11, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, Mitigating Strategies, dated May 11, 2011 (0CNA051103), to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).

In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the bulletin which was provided on June 10, 2011 (0CAN061101).

The attachment to this letter forwards the response requested within 60 days of the date of the bulletin to provide information regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).

The attachment includes information that addresses measures that are currently in place. The attachment to this letter contains security-related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been marked accordingly with the notation "Security-Related Information - Withhold Under 10 CFR 2.390."

There are no new commitments contained in this submittal. If you need any additional information, please contact William J. Steelman at (504) 739-6685.

This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390

W3F1-201 1-0038 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on July 11,2011.

Sincerely,

////

JAK/R

Attachment:

60-Day Response to NRC Bulletin 2011-01 cc: Mr. Elmo Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Waterford Steam Electric Station, Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam Mail Stop 0-8 E9 Rockville, MD 20852 Kaly. Kalyanamnrc.gov This letter contains security-related information The attachment is withheld from public disclosure per 10 CFR 2.390

Text

Entergy Nuclear South Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504 739 6660 Fax 504 739 6678 jkowale@entergy.com Joseph A. Kowalewski Vice President, Operations Waterford 3 W3F1-2011-0038 July 11, 2011 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

60-Day Response to NRC Bulletin 2011-01, Mitigating Strategies Waterford Steam Electric Station, Unit 3 (Waterford 3)

Docket No. 50-382 License No. NPF-38

Dear Sir or Madam:

The Nuclear Regulatory Commission (NRC) issued Bulletin 2011-01, Mitigating Strategies, dated May 11, 2011 (0CNA051103), to request each licensee to provide a comprehensive verification of their compliance with the regulatory requirements of Title 10 of the Code of Federal Regulations (10 CFR) Section 50.54(hh)(2). Addressees are required to provide a written response to the NRC in accordance with 10 CFR 50.54(f).

In Bulletin 2011-01, the NRC requested each licensee to submit a written response within 30 days of the date of the bulletin which was provided on June 10, 2011 (0CAN061101).

The attachment to this letter forwards the response requested within 60 days of the date of the bulletin to provide information regarding mitigation strategies programs for 10 CFR 50.54(hh)(2).

The attachment includes information that addresses measures that are currently in place. The attachment to this letter contains security-related information that should be withheld from public disclosure in accordance with the requirements of 10 CFR 2.390. The pages have been marked accordingly with the notation "Security-Related Information - Withhold Under 10 CFR 2.390."

There are no new commitments contained in this submittal. If you need any additional information, please contact William J. Steelman at (504) 739-6685.

This letter contains security-related information - The attachment is withheld from public disclosure per 10 CFR 2.390

W3F1-201 1-0038 Page 2 of 2 I declare under penalty of perjury that the foregoing is true and correct. Executed on July 11,2011.

Sincerely,

////

JAK/R

Attachment:

60-Day Response to NRC Bulletin 2011-01 cc: Mr. Elmo Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 NRC Senior Resident Inspector Waterford Steam Electric Station, Unit 3 P.O. Box 822 Killona, LA 70066-0751 U. S. Nuclear Regulatory Commission Attn: Mr. Kaly Kalyanam Mail Stop 0-8 E9 Rockville, MD 20852 Kaly. Kalyanamnrc.gov This letter contains security-related information The attachment is withheld from public disclosure per 10 CFR 2.390