PLA-6211, Transmittal of Extended Power Update Application Regarding Steam Dryer Request for Meeting with NRC Staff: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 1: Line 1:
#REDIRECT [[ML071510178]]
{{Adams
| number = ML071510174
| issue date = 05/22/2007
| title = Transmittal of Extended Power Update Application Regarding Steam Dryer Request for Meeting with NRC Staff
| author name = Mckinney B
| author affiliation = PPL Susquehanna, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR/ADRO
| docket = 05000387, 05000388
| license number = NPF-014, NPF-022
| contact person =
| case reference number = PLA-6211
| document type = Letter type:PLA
| page count = 3
}}
 
=Text=
{{#Wiki_filter:rI Brutt T. McKInney Sr. Vice President
& Chief Nuclear Officer MAY 2 2 2007 PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@ppIweb.com A p *Ie: pGoa-P P 14%U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 EXTENDED POWER UPDATE APPLICATION REGARDING STEAM DRYER REQUEST FOR MEETING WITH NRC STAFF PLA-6211 Docket Nos. 50-387 and 50-388 Reference.
1)PPL Letter PLA-6076, B. T. McKinney (PPL) to USNRC, "Proposed License Amendment Numbers 285for Unit I Operating License No. NPF-14 and 253for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate, "dated October 11, 2006.2) PPL Letter PLA-6138, B. T. McKinney (PPL) to USNRC, "Proposed License Amendment Numbers 285for Unit I Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate -Supplement," dated December 4, 2006.3) PPL Letter PLA-6146, B. T. McKinney (PPL) to USNRC, "Proposed License Amendment No. 285for Unit I Operating License No. NPF-14 and Proposed License Amendment No. 253for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate -Second Supplement, "dated December 26, 2006.4) PPL Letter PLA-6176, B. T. McKinney (PPL) to USNRC, "Proposed License Amendment No. 285for Unit I Operating License No. NPF-14 and Proposed License Amendment No. 253for Unit 2 Operating License No. NPF-22 Extended Power Update Application Regarding Steam Dryer and Flow Effects Requestfor Additional Information Responses," dated April 27, 2007.Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TS) to increase the maximum power level authorized from 3489 megawatts thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP).The purpose of this letter is to provide GE Draft Dryer Presentation material to the NRC to facilitate NRC determination of proprietary content.+0)01  Document Control Desk PLA-6211 The purpose of the meeting is as follows:* Present the steam dryer instrumentation plan with locations and rational for type of instruments and their locations,* Discuss finite element analysis model changes," Discussion of the fabrication detail improvements and why they are expected to improve stress intensity margins,* Discuss strategy for developing start-up limit curves and availability schedule Since the first two items above will involve proprietary information, Attachment I contains the proprietary GE Draft Dryer Presentation material.
A non-proprietary version of Attachment I is provided in Attachment
: 2. The affidavit supporting this request is provided in Attachment 3.Attachment 1 contains information that General Electric Company considers proprietary.
General Electric Company requests that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390 (a) 4 and 9.17 (a) 4.References 2- 4 contain the relevant PPL and NRC dryer correspondence.
Meeting attendees are expected to include: PPL -John Krais, John Bartos, Kevin Browning, Mike Gorski, Tom Oldenhage, Mike Crowthers General Electric -Dan Pappone, Mike Bridges, Larry King, Craig Nichols If you have any questions or require additional information, please contact Mr. Michael H. Crowthers at (610) 774-7766.B. Document Control Desk PLA-6211 Attachment 1: Proprietary Version of the GE Draft Dryer Presentation Attachment 2: Non-Proprietary Version of the GE Draft Dryer Presentation Attachment 3: General Electric Company Affidavit Copy: NRC Region I Mr. A. J. Blarney, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Sr. Project Manager Mr. R. R. Janati, DEP/BR}}

Revision as of 07:02, 17 July 2019

Transmittal of Extended Power Update Application Regarding Steam Dryer Request for Meeting with NRC Staff
ML071510174
Person / Time
Site: Susquehanna  
(NPF-014, NPF-022)
Issue date: 05/22/2007
From: Mckinney B
Susquehanna
To:
Document Control Desk, NRC/NRR/ADRO
References
PLA-6211
Download: ML071510174 (3)


Text

rI Brutt T. McKInney Sr. Vice President

& Chief Nuclear Officer MAY 2 2 2007 PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@ppIweb.com A p *Ie: pGoa-P P 14%U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Stop OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION PROPOSED LICENSE AMENDMENT NO. 285 FOR UNIT 1 OPERATING LICENSE NO. NPF-14 AND PROPOSED LICENSE AMENDMENT NO. 253 FOR UNIT 2 OPERATING LICENSE NO. NPF-22 EXTENDED POWER UPDATE APPLICATION REGARDING STEAM DRYER REQUEST FOR MEETING WITH NRC STAFF PLA-6211 Docket Nos. 50-387 and 50-388 Reference.

1)PPL Letter PLA-6076, B. T. McKinney (PPL) to USNRC, "Proposed License Amendment Numbers 285for Unit I Operating License No. NPF-14 and 253for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate, "dated October 11, 2006.2) PPL Letter PLA-6138, B. T. McKinney (PPL) to USNRC, "Proposed License Amendment Numbers 285for Unit I Operating License No. NPF-14 and 253 for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate -Supplement," dated December 4, 2006.3) PPL Letter PLA-6146, B. T. McKinney (PPL) to USNRC, "Proposed License Amendment No. 285for Unit I Operating License No. NPF-14 and Proposed License Amendment No. 253for Unit 2 Operating License No. NPF-22 Constant Pressure Power Uprate -Second Supplement, "dated December 26, 2006.4) PPL Letter PLA-6176, B. T. McKinney (PPL) to USNRC, "Proposed License Amendment No. 285for Unit I Operating License No. NPF-14 and Proposed License Amendment No. 253for Unit 2 Operating License No. NPF-22 Extended Power Update Application Regarding Steam Dryer and Flow Effects Requestfor Additional Information Responses," dated April 27, 2007.Pursuant to 10 CFR 50.90, PPL Susquehanna LLC (PPL) requested in Reference 1 approval of amendments to the Susquehanna Steam Electric Station (SSES) Unit 1 and Unit 2 Operating Licenses (OLs) and Technical Specifications (TS) to increase the maximum power level authorized from 3489 megawatts thermal (MWt) to 3952 MWt, an approximate 13% increase in thermal power. The proposed Constant Pressure Power Uprate (CPPU) represents an increase of approximately 20% above the Original Licensed Thermal Power (OLTP).The purpose of this letter is to provide GE Draft Dryer Presentation material to the NRC to facilitate NRC determination of proprietary content.+0)01 Document Control Desk PLA-6211 The purpose of the meeting is as follows:* Present the steam dryer instrumentation plan with locations and rational for type of instruments and their locations,* Discuss finite element analysis model changes," Discussion of the fabrication detail improvements and why they are expected to improve stress intensity margins,* Discuss strategy for developing start-up limit curves and availability schedule Since the first two items above will involve proprietary information, Attachment I contains the proprietary GE Draft Dryer Presentation material.

A non-proprietary version of Attachment I is provided in Attachment

2. The affidavit supporting this request is provided in Attachment 3.Attachment 1 contains information that General Electric Company considers proprietary.

General Electric Company requests that the proprietary information be withheld from public disclosure in accordance with 10 CFR 2.390 (a) 4 and 9.17 (a) 4.References 2- 4 contain the relevant PPL and NRC dryer correspondence.

Meeting attendees are expected to include: PPL -John Krais, John Bartos, Kevin Browning, Mike Gorski, Tom Oldenhage, Mike Crowthers General Electric -Dan Pappone, Mike Bridges, Larry King, Craig Nichols If you have any questions or require additional information, please contact Mr. Michael H. Crowthers at (610) 774-7766.B. Document Control Desk PLA-6211 Attachment 1: Proprietary Version of the GE Draft Dryer Presentation Attachment 2: Non-Proprietary Version of the GE Draft Dryer Presentation Attachment 3: General Electric Company Affidavit Copy: NRC Region I Mr. A. J. Blarney, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Sr. Project Manager Mr. R. R. Janati, DEP/BR