| number = ML061780183 | | number = ML061780183 | ||
| issue date = 06/15/2006 | | issue date = 06/15/2006 | ||
| title = | | title = Technical Specification Update for Unit 3 | ||
| author name = | | author name = | ||
| author affiliation = Entergy Nuclear Operations, Inc | | author affiliation = Entergy Nuclear Operations, Inc | ||
| Line 47: | Line 47: | ||
-APPENDIX A LIST OF EFFECTIVE PAGES Page 3 of 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 205 205 210 205 221 205 205 205 205 205 205 205 205 205 224 224 224 224 224 205 205 205 205 206 225 227 227 225 225 205 205 205*The latest amendment reflected in this list is: Amendment 231 Entergy Nuclear Operations, Inc Indian Point 3 Nuclear Power Plant License Amendments Page 13 AMENDMENT SUBJECT 217 218.219 220 221 222 t223 224 225 226 227 Use of Best-Estimate Large-Break Loss of Coolant Accident analysis methodology (WCAP 12945)Revise City Water surveillance to reflect addition of (backflow preventer) valves Revise Ventilation Filter Testing Program to adopt ASTM D3803 charcoal filter testing requirements per GL 99-02.Extension of the RCS pressure/temperature.limits and corresponding OPS limits from 16.17 to 20 EFPY.Extension of RCP flywheel inspection interval (from 10 years to 20 years) per TSTF 421.Inoperable accumulator time extended from 1 hour to 24 hours per TSFT-370.Extension-of the allowed outage time to support the placement of the CRVS in an alternate configuration for tracer gas testing.Full-scope adoption of alternate source term for dose consequence analysis of DBAs.Stretch Power Uprate .(4.85%) from 3067.4 MWt to 3216 MWt, and adoption'of TSTF-339.Adopt TSTF-359; Increased.Flexibility in Mode Restraints. | -APPENDIX A LIST OF EFFECTIVE PAGES Page 3 of 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 205 205 210 205 221 205 205 205 205 205 205 205 205 205 224 224 224 224 224 205 205 205 205 206 225 227 227 225 225 205 205 205*The latest amendment reflected in this list is: Amendment 231 Entergy Nuclear Operations, Inc Indian Point 3 Nuclear Power Plant License Amendments Page 13 AMENDMENT SUBJECT 217 218.219 220 221 222 t223 224 225 226 227 Use of Best-Estimate Large-Break Loss of Coolant Accident analysis methodology (WCAP 12945)Revise City Water surveillance to reflect addition of (backflow preventer) valves Revise Ventilation Filter Testing Program to adopt ASTM D3803 charcoal filter testing requirements per GL 99-02.Extension of the RCS pressure/temperature.limits and corresponding OPS limits from 16.17 to 20 EFPY.Extension of RCP flywheel inspection interval (from 10 years to 20 years) per TSTF 421.Inoperable accumulator time extended from 1 hour to 24 hours per TSFT-370.Extension-of the allowed outage time to support the placement of the CRVS in an alternate configuration for tracer gas testing.Full-scope adoption of alternate source term for dose consequence analysis of DBAs.Stretch Power Uprate .(4.85%) from 3067.4 MWt to 3216 MWt, and adoption'of TSTF-339.Adopt TSTF-359; Increased.Flexibility in Mode Restraints. | ||
Remove Monthly Operating Report and Occupational Radiation.Exposure Report per TSTF-369.Hydrogen Recombiner Elimination and Relaxation of Hydrogen Monitor Requirements per TSTF-447.Inoperability of Snubbers per TSTF-372.Revise Emergency Core Cooling System Throttle Valve Surveillance Requirements. | Remove Monthly Operating Report and Occupational Radiation.Exposure Report per TSTF-369.Hydrogen Recombiner Elimination and Relaxation of Hydrogen Monitor Requirements per TSTF-447.Inoperability of Snubbers per TSTF-372.Revise Emergency Core Cooling System Throttle Valve Surveillance Requirements. | ||
LETTER DATE 05/06/2003 08/04/2003 10/30/2003 12/03/2003 07/02/2004 08/18/2004 01/19/2005 03/22/2005 03/24/2005 04/06/2005 04/14/2005 228 229 230 231 04/14/2005 02/13/2006 03/23/2006 Setpoint Verification of Trip Actuating Devices 06/07/2006 LOP DG Start Instrumentation | LETTER DATE 05/06/2003 08/04/2003 10/30/2003 12/03/2003 07/02/2004 08/18/2004 01/19/2005 03/22/2005 03/24/2005 04/06/2005 04/14/2005 228 229 230 231 04/14/2005 02/13/2006 03/23/2006 Setpoint Verification of Trip Actuating Devices 06/07/2006 LOP DG Start Instrumentation 3.3.5 ACTIONS (continued) | ||
(continued) | |||
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Enter applicable Immediately associated Completion Condition(s) and Required Time not met. Action(s) for the associated DG made OR inoperable by LOP DG start instrumentation. | CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Enter applicable Immediately associated Completion Condition(s) and Required Time not met. Action(s) for the associated DG made OR inoperable by LOP DG start instrumentation. | ||
Two channels of Degraded Voltage Function inoperable in one or more buses.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY---------------------- | Two channels of Degraded Voltage Function inoperable in one or more buses.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY---------------------- | ||
NOTE-,---------------- | NOTE-,---------------- | ||
Verification of setpoint not required SR 3.3.5.1 Perform TADOT. 31 days SR 3.3.5.2 Perform CHANNEL CALIBRATION with Allowable Value as follows: a. Undervoltage (480 V bus) Relay Allowable Value 24 months 200 V.b. Degraded Voltage (480 V bus) Relay (Non-SI) 18 months Allowable Value 414 V with a time delay 45 seconds.c. Degraded.Voltage (480 V bus) Relay (Coincident 18 months SI) Allowable Value 414 V with a time delay<5 10 seconds.INDIAN POINT 3 3.3.5-2 Amendment 231}} | Verification of setpoint not required SR 3.3.5.1 Perform TADOT. 31 days SR 3.3.5.2 Perform CHANNEL CALIBRATION with Allowable Value as follows: a. Undervoltage (480 V bus) Relay Allowable Value 24 months 200 V.b. Degraded Voltage (480 V bus) Relay (Non-SI) 18 months Allowable Value 414 V with a time delay 45 seconds.c. Degraded.Voltage (480 V bus) Relay (Coincident 18 months SI) Allowable Value 414 V with a time delay<5 10 seconds.INDIAN POINT 3 3.3.5-2 Amendment 231}} | ||
Revision as of 15:46, 13 July 2019
| ML061780183 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 06/15/2006 |
| From: | Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| IP-SMM-AD-103, Rev 0 | |
| Download: ML061780183 (10) | |
Text
J~Page: 67 19-APR-06 DISTRIBUTION CONTROL LIST'cument Name: ITS/BASES/TRM CC-NAME NAME DEPT I OPS PROCEDURE GROUP SUPV. OPS PROCEDURE GROUP 3 PLANT MANAGER'S OFFICE UNIT 3(UNIT 3/IPEC ONLY)5 CONTROL ROOM (FL) OPS (--T-+/-0t7'(IP3/IPEC)
- 11 RES DEPARTMENT MANAGER RES (UNIT 3/IPEC ONLY)19 STEWART ANN LICENSING.20 CHEMISTRY SUPERVISOR CHEMISTRY DEPARTMENT 21 TSC(IP3) EEC BUILDING 22 SHIFT MGR.(ELUD 88+/-1 3Ei) OPERATIONS (UNIT 3)23 LIS LICENSING
& INFO SERV 25 SIMULATOR TRAIN(UNIT 3/IPEC ONLY)28 RESIDENT INSPECTOR US NRC 88' ELEVATION 32 EOF E-PLAN (ALL EP'S)47 CHAPMAN N BECHTEL 50 HAAS, CHERYL A. WESTINGHOUSE ELECTRIC 61 SIMULATOR TRAIN(UNIT 3/IPEC ONLY)69 CONROY PAT LICENSING/ROOM 205 99 BARANSKI J (ALL) ST. EMERG. MGMT. OFFICE 106 SIMULATOR INSTRUCT AREA TRG/9PT-D001 DOOG ONLY)164 CONTROL ROOM (FL) OPS(BPT- -E-e4./7&(IP3/IPEC) 273 FAISON CHARLENE NUCLEAR LICENSING 319 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY)354 L.GRANT(LRQ-OPS/TRAIN)
LRQ (UNIT 3/IPEC ONLY)357 L.GRANT(ITS/INFO ONLY) TRAINING -ILO CLASSES 424 GRANT LEAH (UNIT 3/IPEC ONLY)474 OUELLETTE P ENG., PLAN & MGMT INC 489 CLOUGHNESSY PAT PLANT SUPPORT TEAM 492 WORK CONTROL OPERATIONS 72' ELEV 493 OPERATIONS FIN TEAM 33 TURBIN DECK 494 AEOF/A.GROSJEAN(ALL EP'S) E-PLAN (EOP'S ONLY)496 L.GRANT(LRQ-OPS/TRAIN)
LRQ (UNIT 3/IPEC ONLY)497 L.GRANT(LRQ-OPS/TRAIN)
LRQ (UNIT 3/IPEC ONLY)500 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY)501 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY)512"L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY)513 L.GRANT (LRQ-OPS TRAIN) LRQ (UNIT 3/IPEC ONLY)ý518-DOCUMENT.
CONTROL DESK NRC (ALL EP'S)LOCATION IP2 IP2 IP3 45-4-A GSB-2D 45-4-A IP2 IP3 OFFSITE 48-2-A IP2 EOF OFFSITE OFFSITE 48-2-A GSB-2D OFFSITE#48 IP3 WPO-12#48#48 48-2-A#48 OFFSITE GSB-3B IP2 45-1-A WPO-12D#48#48#48#48#48#48*OFFSITE..iv.
IPEC SITE -QUALITY RELATED IP-SMM-AD-103 Revision 0 E17Etergy MANAGEMENT ADMINISTRATIVE PROCEDURE MANUAL __"_____...
.._"_"_INFORMATIONAL USE Page 13 of 21 ATTACHMENT 10.1 SMM CONTROLLED DOCUMENT TRANSMITTAL FORM SITE MANAGEMENT MANUAL CONTROLLED DOCUMENT TRANSMITTAL FORM -PROCEDURES Page 1 of 1 Zý-Entergy CONTROLLED DOCUMENT TRANSMITTAL FORM -PROCEDURES TO: DISTRIBUTION DATE: 6/15/06 PHONE NUMBER: 271-7057 FROM: IPEC DOCUMENT CONTROL The Document(s) identified below are forwarded for use. In accordance with IP-SMM-AD-103, please review to verify receipt, incorporate the document(s) into your controlled document file, properly disposition superseded, void, or inactive document(s).
Sign and return the receipt acknowledgement below within fifteen (15) working days.AFFECTED DOCUMENT:
IP3 ITSIBASESITRM DOC# J REV# TITLE INSTRUCTIONS
FOLLOW THE ATTACHED INSTRUCTIONS****************************
- PLEASE NOTE EFFECTIVE DATE***********
RECEIPT OF THE ABOVE LISTED DOCUMENT(S)
IS HEREBY ACKNOWLEDGED.
I CERTIFY THAT ALL SUPERSEDED, VOID, OR INACTIVE COPIES OF THE ABOVE LISTED DOCUMENT(S)
IN MY POSSESSION HAVE BEEN REMOVED FROM USE AND ALL UPDATES HAVE BEEN PERFORMED IN ACCORDANCE WITH EFFECTIVE DATE(S) (IF APPLICABLE)
AS SHOWN ON THE DOCUMENT(S).
NAME (PRINT)SIGNATURE DATE CC# 5-f?A!
--Entergy Interoffice Correspondence June 13, 2006 MEMORANDUM TO: Mary Stauber Supervisor, Office Services FROM:..Donna Tyner 7 2'x-v.Sr. Coordinator, Licensing j T l1
SUBJECT:
Technical Specification Update for Unit 3 Attached for distribution is the Amendment 231 update to the Unit 3..Technical Specifications.
Please update the Control Room and Shift.'Managers Controlled Copy Books ASAP and the rest of the distribution by June 19, 2006.If you have any questions, please call me on X6698.
Distribution of IP3 Technical Specification Amendment 231 (Approved by NRC June 7, 2006)Pages are to be inserted into your controlled copy of the Improved Technical Specifications following the instructions listed below. The TAB notation indicates which section the pages are located.REMOVE PAGES INSERT PAGES'TAB -Facility Operating License Page 3, (Amendment 230)Page 3, (Amendment 231)TAB -'List of Effective Pages Pages 1 through 3, (Amendment 230)Pages 1 through 3, (Amendment 231)TAB -List of Amendments Page 13 Page 13 TAB 3.3 -Instrumentation Page 3.3.5-2 (Amendment 205)Page 3.3.5-2 (Amendment 231)Page 1 of I f.-3-(4) ENO pursuant to the Act and 10 CFR Parts 30, 40 and 70, to receive, possess, and use in amounts as required any byproduct, source or special nuclear material without restriction to chemical or physical form, for sample analysis or instrument calibration or associated with radioactive apparatus or components; (5) ENO pursuant to the Act and 10 CFR Parts 30 and 70, to possess, but not separate, such byproduct and special nuclear materials as may be produced by the operation of the facility.Amdt. 203 11/27/00 Amdt. 203 11/27/00 C. This amended license shall be deemed to contain and is subject to the conditions specified in the following Commission regulations in 10 CFR Chapter 1: Part 20, Section 30.34 of Part 30, Section 40.41 of Part 40, Sections 50.54 and 50.59 of Part 50, and Section 70.32 of Part 70; and is subject to all applicable provisions of the Act and to the rules, regulations, and orders of the Commission now or hereafter in effect; and is subject to the additional conditions specified or incorporated below: (1) Maximum Power Level ENO is authorized to operate the facility at steady state reactor core power levels not in excess of 3216 megawatts thermal (100% of rated power).(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 231 are hereby incorporated in the License. ENO shall operate the facility in accordance with the Technical Specifications.
I (3) (DELETED)(4) (DELETED)Amdt. 205 2-27-01 Amdt. 205 2-27-01 D. (DELETED)E. (DELETED)Amdt.46 2-16-83 Amdt.37 5-14-81 F.This amended license is also subject to appropriate conditions by the New York State Department of Environmental Conservation in its letter of May 2, 1975, to Consolidated Edison Company of New York, Inc., granting a Section 401 certification under the Federal Water Pollution Control Act Amendments of 1972.Amendment No. 231 INDIAN POINT 3 TECHNICAL SPECIFICATIONS
-APPENDIX A LIST OF EFFECTIVE PAGES Page 1 of 3 Page Amend Section 3.0 2 205 8 225 1 229 3 205 9 213 Table of Contents 2 226 Section 3.2.3 10 205 i 227 3 229 1 205 11 225 ii 228 .4 212 2 205 12 205 iii 227 5 226 3 205 13 205 iv 227 Section 3.1.1 4 205 Section 3.3.3 Section 1.1 1 205 Section 3.2.4 1 226 1 205 Section 3.1.2 1 205 2 211 2 205 1 205 2 205 3 205 3 224 2 205 3 205 4 228 4 205 Section 3.1.3 4 205 5 228 5 225 1 205 Section 3.3.1 Section 3.3.4 6 205 2 J_205 1 205 1 1226 7 205 Section 3.1.4 2 205 2 .205 8 205 1 205 3 205 Section 3.3.5 Section 1.2 2 205 4 205 1 205 1 205 3 205 5 205 2 231 2 205 4 205 6 205 Section 3.3.6 3 205 5 205 7 205 1 205 Section 1.3 Section 3.1.5 8 205 2 205 1 205 1 205 9 205 3 205 2 205 2 205 10 205 4 205 3 205 Section 3.1.6 11 205 5 205 4 205 1 205 12 205 Section 3.3.7 5 205 2 205 13 225 1 224 6 205 3 205 14 205 2 205 7 205 Section 3.1.7, 15 225 3 205 8 205 1 205 16 205 Section 3.3.8 9 205 2 205 17 205 1 215 10 205 3 205 18 205 2 205 11 205 4. 205 19 225 Section 3.4.1 12 205 Section 3.1.8 20 225 1 .225 13 205 1 205 Section 3.3.2 2 225 Section 1.4 2 205 1 205 Section 3.4.2 1 205 Section 3.2.1 2 205 1 jT 205 2 205 1 205 3 205 Section 3.4.3 3 205 2 205 4 205 1 205 4 205 3 205 5 205 2 205 Section 2.0 Section 3.2.2 6 205 3 220 1 225 1 205 7 205 4 220 The latest amendment reflected in this list is: Amendment 231 INDIAN POINT 3 ýTECHNICAL SPECIFICATIONS
-APPENDIX A LIST OF EFFECTIVE PAGES Page 2 of 3 The latest amendment reflected in this list is: Amendment 231 INDIAN POINT 3 TECHNICAL SPECIFICATIONS
-APPENDIX A LIST OF EFFECTIVE PAGES Page 3 of 3 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 205 205 210 205 221 205 205 205 205 205 205 205 205 205 224 224 224 224 224 205 205 205 205 206 225 227 227 225 225 205 205 205*The latest amendment reflected in this list is: Amendment 231 Entergy Nuclear Operations, Inc Indian Point 3 Nuclear Power Plant License Amendments Page 13 AMENDMENT SUBJECT 217 218.219 220 221 222 t223 224 225 226 227 Use of Best-Estimate Large-Break Loss of Coolant Accident analysis methodology (WCAP 12945)Revise City Water surveillance to reflect addition of (backflow preventer) valves Revise Ventilation Filter Testing Program to adopt ASTM D3803 charcoal filter testing requirements per GL 99-02.Extension of the RCS pressure/temperature.limits and corresponding OPS limits from 16.17 to 20 EFPY.Extension of RCP flywheel inspection interval (from 10 years to 20 years) per TSTF 421.Inoperable accumulator time extended from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per TSFT-370.Extension-of the allowed outage time to support the placement of the CRVS in an alternate configuration for tracer gas testing.Full-scope adoption of alternate source term for dose consequence analysis of DBAs.Stretch Power Uprate .(4.85%) from 3067.4 MWt to 3216 MWt, and adoption'of TSTF-339.Adopt TSTF-359; Increased.Flexibility in Mode Restraints.
Remove Monthly Operating Report and Occupational Radiation.Exposure Report per TSTF-369.Hydrogen Recombiner Elimination and Relaxation of Hydrogen Monitor Requirements per TSTF-447.Inoperability of Snubbers per TSTF-372.Revise Emergency Core Cooling System Throttle Valve Surveillance Requirements.
LETTER DATE 05/06/2003 08/04/2003 10/30/2003 12/03/2003 07/02/2004 08/18/2004 01/19/2005 03/22/2005 03/24/2005 04/06/2005 04/14/2005 228 229 230 231 04/14/2005 02/13/2006 03/23/2006 Setpoint Verification of Trip Actuating Devices 06/07/2006 LOP DG Start Instrumentation 3.3.5 ACTIONS (continued)
CONDITION REQUIRED ACTION COMPLETION TIME C. Required Action and C.1 Enter applicable Immediately associated Completion Condition(s) and Required Time not met. Action(s) for the associated DG made OR inoperable by LOP DG start instrumentation.
Two channels of Degraded Voltage Function inoperable in one or more buses.SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY----------------------
NOTE-,----------------
Verification of setpoint not required SR 3.3.5.1 Perform TADOT. 31 days SR 3.3.5.2 Perform CHANNEL CALIBRATION with Allowable Value as follows: a. Undervoltage (480 V bus) Relay Allowable Value 24 months 200 V.b. Degraded Voltage (480 V bus) Relay (Non-SI) 18 months Allowable Value 414 V with a time delay 45 seconds.c. Degraded.Voltage (480 V bus) Relay (Coincident 18 months SI) Allowable Value 414 V with a time delay<5 10 seconds.INDIAN POINT 3 3.3.5-2 Amendment 231