ML061930452: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/20/2006
| issue date = 06/20/2006
| title = Confirmatory Order (Effective Immediately) Regarding Foster V. Zeh, Former Security Officer at Indian Point
| title = Confirmatory Order (Effective Immediately) Regarding Foster V. Zeh, Former Security Officer at Indian Point
| author name = Johnson M R
| author name = Johnson M
| author affiliation = NRC/OE
| author affiliation = NRC/OE
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000247, 05000286
| docket = 05000247, 05000286
| license number =  
| license number =  
| contact person = Burrell M R
| contact person = Burrell M
| case reference number = IA-05-051
| case reference number = IA-05-051
| document type = Confirmatory Order, Federal Register Notice
| document type = Confirmatory Order, Federal Register Notice

Revision as of 16:06, 13 July 2019

Confirmatory Order (Effective Immediately) Regarding Foster V. Zeh, Former Security Officer at Indian Point
ML061930452
Person / Time
Site: Indian Point  Entergy icon.png
Issue date: 06/20/2006
From: Mary Johnson
NRC/OE
To:
Burrell M
References
IA-05-051
Download: ML061930452 (7)


Text

UNITED STATES OF AMERICANUCLEAR REGULATORY COMMISSIONIn the Matter of)IA-05-051Foster V. Zeh

)CONFIRMATORY ORDER(EFFECTIVE IMMEDIATELY)

IFoster V. Zeh (Mr. Zeh) is a former employee (a security officer) of The Wackenhut Corporationand Entergy at the Indian Point Nuclear Power Station (Indian Point). The facility is located on an Entergy Nuclear Operations, Inc. site in Buchanan, NY.

IIAn investigation was initiated by the NRC Office of Investigations (OI) on July 2, 2003, at IndianPoint. This investigation was initiated, in part, to determine if Mr. Zeh disclosed Safeguards Information (SGI) to an unauthorized individual (a freelance journalist), and whether the SGI was subsequently disclosed to the public via an article in a national magazine. In addition, 10 C.F.R.

§ 73.21(a) requires, in part, that each licensee and person who produces, receives or acquires SGI, shall ensure that SGI is protected against unauthorized disclosure. Based on the evidence developed during its investigation, OI concluded that Mr. Zeh deliberately disclosed SGI to an unauthorized individual. 10 C.F.R. §50.5(a)(1) provides, in part, that employees of licensees may not engage in deliberate misconduct that causes a licensee to violate any rule, regulation, orderor license issued by the Commission.

IIIIn a letter dated September 29, 2005, the NRC offered Mr. Zeh a choice to attend a PredecisionalEnforcement Conference, or to provide a written response, or to request Alternative Dispute Resolution (ADR) with the NRC in an attempt to resolve any disagreement on whether a violation occurred and the appropriate enforcement action.In response to the September 29, 2005 letter, Mr. Zeh requested the use of ADR to resolve thismatter with the NRC. ADR is a process in which a neutral mediator with no decision-making authority assists the NRC and Mr. Zeh in reaching an agreement on resolving any differences regarding the matter. An ADR session was held between Mr. Zeh and the NRC in King of Prussia, Pennsylvania on January 31, 2006, and was mediated by a professional mediator, arranged through Cornell University's Institute of Conflict Management. Based on that ADR session, as well as subsequent discussions between Mr. Thomas Rosenthal, Mr. Zeh's attorney, and Mr. Karl Farrar, the NRC, Region I Regional Counsel, between February 6, 2006 and March 29, 2006, a settlement agreement was reached. The elements of the settlement agreement consisted of the following:1.In a September 29, 2005 letter to Mr. Zeh, which provided notice of an apparent violation,the NRC concluded that Mr. Zeh had deliberately caused a violation of NRC requirements by releasing SGI regarding Indian Point to a freelance journalist (an unauthorized individual). In the September 29, 2005 letter, the NRC concluded that Mr. Zeh released the information prior to his departure from employment with Entergy Nuclear Operations (Entergy)in March 2003. The freelance journalist's article was published in the May 2003 edition of a national magazine. 10 C.F.R. § 73.21(a) requires, in part, that each licensee and person who produces, receives or acquires SGI, shall ensure that SGI is protected against unauthorizeddisclosure. 10 C.F.R. § 50.5(a)(1), in part, prohibits any licensee, licensee employee, or contractor employee, from engaging in deliberate misconduct that causes a licensee to violate any rule or regulation issued by the Commission. 2.Mr. Zeh agrees that he provided some of the information contained in the aforementionedmagazine article to the freelance reporter, and that some of the information in the article was considered by the NRC (but not Mr. Zeh) to be SGI at the time of the release.

However, Mr. Zeh maintains that he did not release SGI to the freelance reporter, deliberately or otherwise, and as such, Mr. Zeh denies that he violated 10 CFR 50.5(a)(1).

Consequently, the NRC and Mr. Zeh agree to disagree regarding whether Mr. Zeh violated 10 CFR 50.5(a)(1).3.Mr. Zeh indicates that at this time, he has no intention of working or seeking employmentin any activities or at any facility that is subject to NRC regulations, and that he is willing tonot engage in future NRC licensed activities for a period of three years from the date of an NRC Confirmatory Order confirming this Agreement.4.Mr. Zeh also agrees that he will not disclose SGI information regarding the Indian Pointsecurity program to any unauthorized individuals, consistent with the Wackenhut non-disclosure agreement that he signed on May 9, 1997.

5.The NRC acknowledges that Mr. Zeh has reported public health and safety concerns in thepast. Reporting of concerns, either internally or to the NRC, contributes to the NRC mission of protecting public health and safety. 6.In consideration of Mr. Zeh's obligations and commitments as set forth above, the NRCagrees to not take any action against Mr. Zeh regarding this matter other than issuance of a Confirmatory Order confirming the commitments set forth herein. This Confirmatory Order will only be made publicly available in ADAMS, and will appear in the "Current Issues and Actions Section" on the NRC website for a period of one year from the date of the Confirmatory Order. The NRC agrees that if it publicly references the underlying facts that resulted in this Confirmatory Order in a manner other than as stated above, the NRC will not disclose Mr. Zeh's name or the facility where Mr. Zeh was previously employed. This does not preclude the NRC from responding to inquiries that might result from the placing of the document into ADAMS or on the "Current Issues and Actions Section" of the NRC website, relating to this matter. Responses provided by the NRC will be comprised of information that is part of the NRC public record. Except as set forth in this Paragraph 6, the NRC agrees not to cause publication of this Agreement, the Confirmatory Order, or the underlying facts identifying Mr. Zeh that resulted in this Confirmatory Order unless required by law, rule, regulation, or competent Administrative, Congressional or Judicial Authority.7.Mr. Zeh agrees to issuance of a Confirmatory Order confirming this Agreement, and alsoagrees to waive the right to request a hearing regarding all or any part of this Confirmatory Order.Implementation of these commitments will provide enhanced assurance that safeguards information will be appropriately protected and will resolve NRC's concerns. I find that Mr. Zeh'scommitments as set forth in Section IV are acceptable and necessary, and conclude that with these commitments, the protection of public health and safety is reasonably assured. In view of the foregoing, I have determined that the public health and safety require that Mr. Zeh's commitments be confirmed by this Order. Based on the above and Mr. Zeh's consent, this Order is immediately effective upon issuance.

IVAccordingly, pursuant to Sections 103, 147, 161b, 161i, 161o, 182, and 186 of the Atomic EnergyAct of 1954, as amended, and the Commission's regulations in 10 C.F.R. §2.202 and 10 C.F.R. Parts 50 and 73, IT IS HEREBY ORDERED, EFFECTIVE IMMEDIATELY THAT:1.Mr. Zeh will not engage in future NRC licensed activities for a period of three years from thedate of this NRC Confirmatory Order confirming this Agreement.2.Mr. Zeh also agrees that he will not disclose SGI information regarding the Indian Pointsecurity program to any unauthorized individuals, consistent with the Wackenhut non-disclosure agreement that he signed on May 9, 1997.The Director, Office of Enforcement may relax or rescind, in writing, any of the above conditionsupon a showing by Mr. Zeh of good cause.

VAny person adversely affected by this Confirmatory Order, other than Mr. Zeh, may request ahearing within 20 days of its issuance. Where good cause is shown, consideration will be given to extending the time to request a hearing. A request for extension of time must be made in writing to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and must include a statement of good cause for the extension. Any request for a hearing shall be submitted to the Secretary, U.S. Nuclear Regulatory Commission, ATTN: Chief, Rulemaking and Adjudications Staff, Washington, D.C. 20555. Copies of the hearing request shall also be sent to the Director, Office of Enforcement, U.S. Nuclear Regulatory Commission, Washington D.C. 20555, to the Assistant General Counsel for Materials Litigation andEnforcement, to the Director of the Division of Regulatory Improvement Programs at the same address, and to Entergy Nuclear Operations, Inc. Because of possible disruptions in delivery of mail to United States Government offices, it is requested that answers and requests for hearing be transmitted to the Secretary of the Commission either by means of facsimile transmission to 301-415-1101 or by e-mail to hearingdocket@nrc.gov and also to the Office of the GeneralCounsel by means of facsimile transmission to 301-415-3725 or e-mail to OGCMailCenter@nrc.gov. If such a person requests a hearing, that person shall set forth withparticularity the manner in which his interest is adversely affected by this Order and shall address the criteria set forth in 10 C.F.R. § 2.309 (d) and (f).If a hearing is requested by a person whose interest is adversely affected, the Commission willissue an Order designating the time and place of any hearing. If a hearing is held, the issue to be considered at such hearing shall be whether this Confirmatory Order shall be sustained.

AN ANSWER OR A REQUEST FOR A HEARING SHALL NOT STAY THE EFFECTIVENESSDATE OF THIS ORDER.FOR THE NUCLEAR REGULATORY COMMISSION/RA/Michael Johnson, DirectorOffice of EnforcementDated this 20th day of June 2006