| title = 8/31/07 Braidwood - Mid-Cycle Performance Review and Inspection Plan | | title = 8/31/07 Braidwood - Mid-Cycle Performance Review and Inspection Plan | ||
| author name = Pederson C | | author name = Pederson C | ||
| author affiliation = NRC/RGN-III/DRP | | author affiliation = NRC/RGN-III/DRP | ||
| addressee name = Crane C | | addressee name = Crane C | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000456, 05000457 | | docket = 05000456, 05000457 | ||
Revision as of 20:11, 12 July 2019
| ML072430354 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 08/31/2007 |
| From: | Pederson C Division Reactor Projects III |
| To: | Crane C Exelon Generation Co, Exelon Nuclear |
| References | |
| Download: ML072430354 (6) | |
Text
August 31, 2007 Mr. Christopher M. Crane President and Chief Nuclear Officer
Exelon Nuclear
Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL 60555
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
BRAIDWOOD STATION
Dear Mr. Crane:
On August 14, 2007, the NRC staff completed its performance review of the Braidwood Station for the first half of the calendar year (CY) 2007 assessment cycle. Our technical
staff reviewed performance indicators (PIs) for the most recent quarter and inspection
results over the previous 12 months. The purpos e of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at
your facility.
This performance review and enclosed inspection plan do not include security information.
A separate letter designated and marked as "Official Use Only - Security-Related Information"
will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter at the Braidwood Nuclear Generating Plant Units 1 and 2 was within the Licensee Response column of the NRC's Action
Matrix, based on all inspection findings being classified as having very low safety
significance (Green) and all PIs indicating performance at a level requiring no additional
NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP)
baseline inspections at your facility.
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. Significant inspections planned include a Biennial Problem
Identification and Resolution inspection in October 2008, and an Evaluation of Changes, Tests, or Experiments and Permanent Plant Modifications inspection in November 2008. The
inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel
availability issues well in advance of inspector arrival onsite. Routine resident inspections are
not listed due to their ongoing and continuous nature. The inspections in the last nine months
of the inspection plan are tentative and may be revised at the end-of-cycle review.
C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Reco rds (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the
inspection plan, we will contact you to discuss the change as soon as possible. Please contact
Richard A. Skokowski at (630) 829-9620 with any questions you may have regarding this letter
or the inspection plan.
Sincerely,/RA by A. H. Hsia for/
Cynthia D. Pederson, Director Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77
Enclosure:
Braidwood Station Inspection/Activity Plan DISTRIBUTION:
See next page C. Crane In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document
Room or from the Publicly Available Reco rds (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the
inspection plan, we will contact you to discuss the change as soon as possible. Please contact
Richard A. Skokowski at (630) 829-9620 with any questions you may have regarding this letter
or the inspection plan.
Sincerely,/RA by A. H. Hsia for/
Cynthia D. Pederson, Director Division of Reactor Projects Docket Nos. 50-456; 50-457 License Nos. NPF-72; NPF-77
Enclosure:
Braidwood Station Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\Branch TSS\ALL MOC\midcycle 2006 to 2007\Braidwood\Braidwood MOC Letter 2007.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copyOFFICERIIIRIIINAMERSkokowski:dtpCPederson*AHH forDATE08/24/0708/30/07 OFFICIAL RECORD COPY Letter to C. Crane from C. Pederson dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
BRAIDWOOD STATION cc w/encl:Site Vice President - Braidwood Station Plant Manager - Braidwood Station
Regulatory Assurance Manager - Braidwood Station
Chief Operating Officer
Senior Vice President - Nuclear Services
Vice President - Operations Support
Vice President - Licensing and Regulatory Affairs
Director Licensing
Manager Licensing - Braidwood and Byron
Senior Counsel, Nuclear, Mid-West Regional
Operating Group
Document Control Desk - Licensing
Assistant Attorney General
Illinois Emergency Management Agency
State Liaison Officer
Chairman, Illinois Commerce Commission
Will County Executive
Will County Sheriff
Director, Will County Emergency Management
Agency Mayor of Joliet
City Manager of Joliet
Kendall County Board Chairman
Kendall County Sheriff
Grundy County Board Chairman
Grundy County Sheriff
Grundy County Emergency Management Agency
Mayor of Morris
Minooka Village President
Mayor of Coal City
Mayor of Carbon Hill
Mayor of Diamond
Mayor of Braidwood
Mayor of Wilmington
Channahon Village President
Channahon Village Administrator
Mayor of Shorewood
Shorewood Village Administrator
Mayor of Elwood
Mayor of Braceville
Mayor of Kankakee
INPO Letter to C. Crane from C. Pederson dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
BRAIDWOOD STATION DISTRIBUTION
- RAG1 TEB RFK RidsNrrDirslpab
JLC1 MAS KGO JKH3 RML2 SAM9 SRI Braidwood
DRPIII DRSIII PLB1 TXN Braidwood Inspection / Activity Plan 09/01/2007
-12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 1 08/28/2007 Report 22 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/08/2007 10/19/2007 1 7112102 IP A LARA Planning and Controls 1 BI ENG-ENGINEERING INSERVICE INSPECTION Baseline Inspections 10/08/2007 10/26/2007 1 7111108P IP Inservice Inspection Activities - PWR 3 OL EXAM-EXAM PREPARATION 11/2007 Not Applicable 10/22/2007 10/26/2007 1 W90172 OL - INITIAL EXAM - BRAIDWOOD - NOV/DEC 2007 3 OL EXAM-INITIAL LICENSING EXAM 12/2007 Not Applicable 12/03/2007 12/14/2007 1 W90172 OL - INITIAL EXAM - BRAIDWOOD - NOV/DEC 2007 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/10/2008 03/14/2008 1 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 04/28/2008 05/02/2008 1 7112101 IP A ccess Control to Radiologically Significant Areas Baseline Inspections 04/28/2008 05/02/2008 1 7112102 IP A LARA Planning and Controls 1 BI ENG-ENGINEERING INSERVICE INSPECTION Baseline Inspections 04/21/2008 05/16/2008 2 7111108P IP Inservice Inspection Activities - PWR 1 BI ENG-BIENNIAL MAINTENANCE EFFECTIVENESS INSP.
Baseline Inspections 07/21/2008 07/25/2008 1 7111112B IP Maintenance Effectiveness 1 BI ENG-BIENNIAL HEAT SINK INSPECTION Baseline Inspections 08/04/2008 08/08/2008 1 7111107B IP Heat Sink Performance 1 BI RP-RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/22/2008 09/26/2008 1 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 09/22/2008 09/26/2008 1 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 09/22/2008 09/26/2008 1 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 09/22/2008 09/26/2008 1 71151-PR01 IP RETS/ODCM Radiological Effluent 3 BI PI&R-BIENNIAL PI&R INSPECTION Baseline Inspections 10/06/2008 10/24/2008 1 71152B IP Identification and Resolution of Problems 2 BI ENG-ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections 11/03/2008 11/21/2008 1 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 11/03/2008 11/21/2008 1 7111117B IP Permanent Plant Modifications 3 BI EP-EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 11/17/2008 11/21/2008 1 7111401 IP Exercise Evaluation Baseline Inspections 11/17/2008 11/21/2008 1 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 11/17/2008 11/21/2008 1 71151-EP02 IP ERO Drill Participation Baseline Inspections 11/17/2008 11/21/2008 1 71151-EP03 IP A lert & Notification System This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.