ML091260668: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 06/01/2009
| issue date = 06/01/2009
| title = Penn State University, Transmittal Letter, Determination a Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application from the Psu for Renewal of Facility License No. R-2 for the Penn State Breazeale
| title = Penn State University, Transmittal Letter, Determination a Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application from the Psu for Renewal of Facility License No. R-2 for the Penn State Breazeale
| author name = Kennedy W B
| author name = Kennedy W
| author affiliation = NRC/NRR/DPR/PRTA
| author affiliation = NRC/NRR/DPR/PRTA
| addressee name = Unlu K
| addressee name = Unlu K

Revision as of 00:14, 12 July 2019

Penn State University, Transmittal Letter, Determination a Acceptability and Sufficiency for Docketing and Opportunity for a Hearing Regarding the Application from the Psu for Renewal of Facility License No. R-2 for the Penn State Breazeale
ML091260668
Person / Time
Site: Pennsylvania State University
Issue date: 06/01/2009
From: William Kennedy
Research and Test Reactors Licensing Branch
To: Unlu K
Pennsylvania State Univ, University Park, PA, State of PA
Kennedy, W B, NRR/DPR, 415-2784
References
TAC MC9534
Download: ML091260668 (4)


Text

June 1, 2009

Dr. Kenan Unlu, Director Radiation Science and Engineering Center (RSEC) Breazeale Nuclear Reactor University Park, PA 16802-2301

SUBJECT:

DETERMINATION OF ACCEPTABILITY AND SUFFICIENCY FOR DOCKETING AND OPPORTUNITY FOR A HEARING REGARDING THE APPLICATION FROM THE PENNSYLVANIA STATE UNIVERSITY FOR RENEWAL OF FACILITY LICENSE NO. R-2 FOR THE PENN STATE BREAZEALE REACTOR (TAC NO. MC9534)

Dear Dr. Unlu:

By letter dated December 6, 2005, the Pennsylvania State University (PSU) submitted an application to the Nuclear Regulatory Commission (NRC) for renewal of Facility Operating License No. R-2 for the Penn State Breazeale Reactor (PSBR).

Based on initial review of the application, the NRC staff determined that PSU submitted sufficient information such that the application is acceptable for docketing in accordance with Title 10 of the Code of Federal Regulations (CFR) Section 50.33 and 50.34. However, the staff's determination does not preclude requests for additional information as the review proceeds.

Enclosed is a copy of the notice of acceptance of the application for docketing being sent to the Office of the Federal Register for publication. The notice provides the opportunity to request a hearing and to file a petition for leave to intervene.

If you have any questions regarding this matter, please contact me at 301-415-2784 or via electronic mail at William.Kennedy@nrc.gov.

Sincerely,

/RA by Duane Hardesty for/

William B. Kennedy, Project Manager Research and Test Reactors Branch A Division of Policy and Rulemaking Office of Nuclear Reactor Regulation Docket No.50-005

Enclosure:

Federal Register Notice cc w/enclosure: See next page ENCLOSURE Pennsylvania State University Docket No.50-005 cc: Mr. Eric J. Boeldt, Manager of Radiation Protection The Pennsylvania State University 304 Old Main University Park, PA 16802-1504

Dr. Eva J. Pell Vice President and Dean of the Graduate School Pennsylvania State University 304 Old Main University Park, PA 16802-1504

Director, Bureau of Radiation Protection Department of Environmental Protection P.O. Box 8469 Harrisburg, PA 17105-8469

Test, Research, and Training Reactor Newsletter University of Florida 202 Nuclear Sciences Center Gainesville, FL 32611

ML091260668 NRR-106 OFFICE PRTA:PM PRTA:LA OGC PRTA:BC NAME WKennedy, DAH for GLappert BMizuno KBrock DATE 5/7/09 5/7/09 5/20/09 6/1/09