| issue date = 09/30/2010 | | issue date = 09/30/2010 | ||
| title = NFPA 805 Non-Pilot Workshop Preliminary Topics | | title = NFPA 805 Non-Pilot Workshop Preliminary Topics | ||
| author name = Weerakkody S | | author name = Weerakkody S | ||
| author affiliation = NRC/NRR/DRA | | author affiliation = NRC/NRR/DRA | ||
| addressee name = Butler J | | addressee name = Butler J | ||
Line 9: | Line 9: | ||
| docket = | | docket = | ||
| license number = | | license number = | ||
| contact person = Weerakkody S | | contact person = Weerakkody S, NRR/DRA, 415-2870 | ||
| package number = ML10240247 | | package number = ML10240247 | ||
| document type = Conference/Symposium/Workshop Paper | | document type = Conference/Symposium/Workshop Paper |
Revision as of 04:22, 11 July 2019
ML102740257 | |
Person / Time | |
---|---|
Issue date: | 09/30/2010 |
From: | Sunil Weerakkody NRC/NRR/DRA |
To: | Butler J Nuclear Energy Institute |
Weerakkody S, NRR/DRA, 415-2870 | |
Shared Package | |
ML10240247 | List: |
References | |
Download: ML102740257 (2) | |
Text
NFPA 805 Non-Pilot Workshop 9/29/2010
Potential Workshop Topics
Monitoring program
- What is the level of detail that a licensee must submit to NRC under Oath & Affirmation about licensee's NFPA 805 Monitoring Program?
- Please expand upon the various enforcement discretion scenarios. For example, what can a licensee expect if they submit their LAR after their enforcement discretion period ends?
- If a licensee submits their LAR more than six months after the staff issues the SER, will the licensee receive enforcement discretion during the LAR review period?
PRA peer reviews
- The NRC performed audits of the pilots' PRAs. What level of review is the NRC expecting to do for non-pilots?
- If the NRC determines that a licensee's peer review was deficient, or the findings improperly resolved, what will the NRC do?
- How will the issue of peer reviews of then-incomplete PRA's be addressed (for example the recent peer review at Palisades the the NRC observed)?
Safe and stable
- What is the NRC's position regarding this issue?
- What information is required by the NRC regarding this issue?
- What level of detail is required?
Acceptance review process (LIC-109)
- What is the role of the NRC's acceptance review process in the NFPA 805 LAR review effort?
- Will the NRC be following this process for the non-pilots?
LAR prioritization and sequencing
- Will the reviews be sequenced (as for license renewal)?
- If so, what will be the criteria for prioritization?
RAI process and SharePoint technology
NFPA 805 Non-Pilot Workshop 9/29/2010
- The pilot plants used SharePoint to assist the RAI process. Should the non-pilots expect to do the same?
License condition
- What can non-pilot licensees expect to see in their license conditions?
- Will this be different from what is in the current version of Regulatory Guide 1.205?
Implementation items (post-SE)
- How will implementation items be handled for the non-pilots?
- How will these items be finally closed-out?
New information post-LAR-submittal
- How does the NRC intend to handle new information developed after a licensee has submitted their LAR?
- If there is the possibility of re-work, how will this be resolved?
Bounds of self approval
- What are the boundaries of the post-transition self-approval process?
- Are there some changes that must receive specific NRC approval?
Unanalyzed PRA methods
- How will the NRC handle novel or previously unanalyzed PRA methods?
Fire modeling in the fire risk evaluation performance-based approach
- What information needs to be submitted to the NRC regarding fire modeling when the fire risk evaluation approach?
- What level of detail is required?
Design changes during the LAR review period
- How should potentially unrelated plant changes be addressed during the LAR review period?
- How do the power uprate and license renewal processes interact with the LAR review/transition process?
PRA Model maintenance
- What are the regulatory expectations with respect to PRA model maintenance? - Plant changes? - Method changes? - Data changes?