ML18057A629: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 22: Line 22:
| issue date = 12/07/1990
| issue date = 12/07/1990
| title = Forwards Rev 2 to Proposed TS Change to Reduce Required Boron Solution Level in Safety Injection Tanks from 186 to 174 Inches & Increase Max Boron Solution Level from 198 to 200 Inches
| title = Forwards Rev 2 to Proposed TS Change to Reduce Required Boron Solution Level in Safety Injection Tanks from 186 to 174 Inches & Increase Max Boron Solution Level from 198 to 200 Inches
| author name = SLADE G B
| author name = Slade G
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  

Revision as of 05:57, 25 June 2019

Forwards Rev 2 to Proposed TS Change to Reduce Required Boron Solution Level in Safety Injection Tanks from 186 to 174 Inches & Increase Max Boron Solution Level from 198 to 200 Inches
Date released: 10/31/2018 Download: ML18057A629


Forwards Rev 2 to Proposed TS Change to Reduce Required Boron Solution Level in Safety Injection Tanks from 186 to 174 Inches & Increase Max Boron Solution Level from 198 to 200 Inches
ML18057A630
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/1990
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML18057A630 (14)
Forwards Rev 2 to Proposed TS Change to Reduce Required Boron Solution Level in Safety Injection Tanks from 186 to 174 Inches & Increase Max Boron Solution Level from 198 to 200 Inches
ML18057A628
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/07/1990
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML18057A628 (6)