LR-N14-0184, Third Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 3: | Line 3: | ||
| issue date = 08/26/2014 | | issue date = 08/26/2014 | ||
| title = Third Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | | title = Third Six-Month Status Report for the Hope Creek Generating Station in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events | ||
| author name = Davison P | | author name = Davison P | ||
| author affiliation = PSEG Nuclear, LLC | | author affiliation = PSEG Nuclear, LLC | ||
| addressee name = | | addressee name = | ||
Revision as of 08:59, 21 June 2019
| ML14239A326 | |
| Person / Time | |
|---|---|
| Site: | Hope Creek |
| Issue date: | 08/26/2014 |
| From: | Davison P Public Service Enterprise Group |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EA-12-049, LR-N14-0184 | |
| Download: ML14239A326 (9) | |