PNP 2016-061, Proposed Alternatives-Relief Requests Numbers RR 5-4, Weld Reference System, and RR 5-5, Under-Vessel Leakage Examination, Pertaining to In-Service Inspection Related Activities for the Fifth 10-Year Interval: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 12/20/2016
| issue date = 12/20/2016
| title = Proposed Alternatives-Relief Requests Numbers RR 5-4, Weld Reference System, and RR 5-5, Under-Vessel Leakage Examination, Pertaining to In-Service Inspection Related Activities for the Fifth 10-Year Interval
| title = Proposed Alternatives-Relief Requests Numbers RR 5-4, Weld Reference System, and RR 5-5, Under-Vessel Leakage Examination, Pertaining to In-Service Inspection Related Activities for the Fifth 10-Year Interval
| author name = Hardy J A
| author name = Hardy J
| author affiliation = Entergy Nuclear Operations, Inc
| author affiliation = Entergy Nuclear Operations, Inc
| addressee name =  
| addressee name =  

Revision as of 19:29, 19 June 2019

Proposed Alternatives-Relief Requests Numbers RR 5-4, Weld Reference System, and RR 5-5, Under-Vessel Leakage Examination, Pertaining to In-Service Inspection Related Activities for the Fifth 10-Year Interval
ML16355A020
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/20/2016
From: Hardy J
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
CAC MF6162, PNP 2016-061, TAC MD2408, TAC MD2414
Download: ML16355A020 (10)


Text