ML17291A831: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 3: Line 3:
| issue date = 05/31/1995
| issue date = 05/31/1995
| title = Monthly Operating Rept for May 1995 for WNP-2.W/950609 Ltr
| title = Monthly Operating Rept for May 1995 for WNP-2.W/950609 Ltr
| author name = EMBREE D G, PARRISH J V
| author name = Embree D, Parrish J
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  

Revision as of 22:19, 18 June 2019

Monthly Operating Rept for May 1995 for WNP-2.W/950609 Ltr
ML17291A831
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 05/31/1995
From: Embree D, Parrish J
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GO2-95-111, NUDOCS 9506130264
Download: ML17291A831 (8)


Text

P RI (3 RI"EY ACCELERATED RIDS PROCESSING REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)ACCESSION NBR:9506130264 DOC.DATE: 95/05/31 NOTARIZED:

NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Public Powe 05000397 AUTH.NAME AUTHOR AFFILIATION EMBREE,D.G.

Washington Public Power Supply System PARRISH,J.V.

Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly operating rept for May 1995 for WNP-).W/950609 ltr DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE TITLE: Monthly Operating Report (per Tech Specs)NOTES: RECIPIENT ID CODE/NAME PD4-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID CODE/NAME CLIFFORD,J COPIES LTTR ENCL 1 1 INTERNAL: 10 10 E CENTE 1 1 1 NRR~O~~OECB 1 1 AEOD/SPD/RRAB NRR/DISP/PIPB RGN4 1 1 1 1 1 1 EXTERNAL LITCO BRYCE i J H NRC PDR 1 1 1 1 NOAC 1 1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE iVASTE!CONTACI'THE DOCUMENT CONTROL DESK, ROOK!Pl-37 (EXT.504-2083)TO ELliiIIVATE YOUR NA!iIE FROil DISTRIBUTION LISTS I'OR DOCl'ME.4'I'S YOU DON"I'L'ED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 20 ENCL 20 WASHINGTON PUBLIC POWER SUPPLY SYSTEM P.O.Box 96B~3000 George Washington Way~Richland, Washington 99352 June 9, 1995 G02-95-111 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, D.C.20555 Gentlemen:

Subject:

WNP-2 OPERATING LICENSE NPF-21 MONTHLY OPERATING REPORT MAY 1995 Transmitted herewith is the Monthly Operating Report for the month of May 1995 as required by Technical Specification 6.9.1.6..V.Parrish (Mail Drop 1023)Vice President, Nuclear Operations JVP:DGE CC: LJ Callan, NRC RIV NRC Sr.Resident Inspector (927N)INPO ANI Library Utility Data Institute BPA (399)'st506f30264 95053i PDR ADOCK05000397.R'.',>,-",: PDR

~t Q'>g~)~~~,

OPERATING STATUS REPORT for WNP-2 Date: June 1, 1995 1.2.3.4 5.6.7.8.9.Docket: 50-397 Reporting Period: MAY 1995 Outage+On-Line Hours: 744.0 Utility Contact: David G.Embree (509)377-8448 Licensed Thermal Power (MW,): Nameplate Rating (Gross MW,): Design Electrical Rating (Net MW,): Maximum Dependable Capacity (Gross MW,): Maximum Dependable Capacity (Net MW,): If changes occur above since last report, give reasons: 10.11.Power to which restricted, if any (Net MW,): Reasons for restrictions, if any: None 12.13.14.15.16.17.18.19.20.21.22.23.24.25.Report Period Hours Hours Reactor Critical Rx Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy (MWH)Gross Electrical Energy (MWH)Net Electrical Energy (MWH)Unit Service Factor Unit Availability Factor Unit Capacity Factor (MDC Net)Unit Capacity Factor (DER Net)Unit Forced Outage Rate Forced Outage Hours MONTH 744.0 0.0 0.0 0.0 0.0 0 0-6,104 0.0%0.0%0.0%0.0%0.0%0.0 YEAR 3,623.0 2,404.3 0.0 2,324.5 0.0 7,404,028 2,553,980 2,445,691 64.2%64.2%62.2%60.3%13.0%348.6 CUMULATIVE 91,711.2 65,104.9 340.4 62,892.1 381.7 186,666,868 62,907,480 60,270,825 68.6%69.0%60.2%59.5%11.7%8,319.7 26.27.If currently shutdown, estimated startup date: Shutdowns scheduled over the next 6 months (type, date, duration):

Refueling, April 22, 1995, 42 days.June 4, 1995 Note: Cumulative Unit Capacity Factors (MDC&DER)are calculated with weighted averages.

t t AVERAGE DAILY UNIT POWER LEVEL REPORT PERIOD: MAY 1995 DOCKET NO.: UNIT: DATE: COMPLETED BY: TELEPHONE:

50-397 WNP-2 June 1, 1995 D.G.Embree (509)377-844$DAY 4 AVERAGE DAILY POWER LEVEL (Net MWe)-12-10 9-9 AVERAGE DAILY POWER LEVEL DAY (Net MWe)16 17 18 19 20 21 22 23 10 12 13 14 15-'8-9-7 24 25 26 27 28 29 30 31-7-10-10-10-12 INSTRUCTIONS On this form, list the average daily unit power level in MWe (net)for each day in the reporting month.Compute to the nearest whole megawatt.These figures will be used to plot a graph for each reporting month.Note that when maximum dependable capacity is used for the net electrical rating of the unit, there may be occasions when the daily average power level exceeds the 100%line (or the restricted power level line).In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

CR I UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT PERIOD: MAY 1995 DOCKET NO.: 50-397 UNIT NAME: WNP-2 DATE: June 1, 1995 COMPLETED BY: D.G.Embree TELEPHONE:

(509)377-8448 No.Date Type Hours Reason Method LER Number System Component Cause and Corrective Action To Prevent Recurrence 9545 4/22/95 S 744.0 C N/A RC FUELXX Continuation from previous month.

SUMMARY

At the beginning of the month, the plant continued the annual refueling outage with an estimated startup date of June 4, 1995.TYPE F-Forced S-Scheduled REASON A-Equipment Failure B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training&License Examination F-Administration G-Operational Error H-Other METHOD 1-Manual 2-Manual Scram 3-Auto Scram 4-Continued 5-Reduced Load 9-Other SYSTEM&COMPONENT NUREG-0161 Exhibits F&H 0 4>>'I