ML17334A462: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
Created page by program invented by StriderTol
Line 3: Line 3:
| issue date = 02/25/1983
| issue date = 02/25/1983
| title = Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
| title = Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
| author name = ALEXICH M P
| author name = Alexich M
| author affiliation = AMERICAN ELECTRIC POWER SERVICE CORP.
| author affiliation = AMERICAN ELECTRIC POWER SERVICE CORP.
| addressee name = DENTON H R
| addressee name = Denton H
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000315, 05000316
| docket = 05000315, 05000316

Revision as of 12:57, 18 June 2019

Requests That Payment for NUREG-0737,Item II.F.1.6 Tech Spec Be Made Part of Single Fee to Be Levied for Issuance of Tech Spec Changes Required by NUREG-0737.Util Should Not Be Penalized for Early Implementation of Safety Equipment
ML17334A462
Person / Time
Site: Cook  
Issue date: 02/25/1983
From: Alexich M
AMERICAN ELECTRIC POWER SERVICE CORP.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.F.1, TASK-TM AEP:NRC:0631B, AEP:NRC:631B, NUDOCS 8303010323
Download: ML17334A462 (3)


Text

AMER1CAN-ELECTRIC POMfER Service Corporation 2 Broadway, New York,¹Y.10004 (212)440-9000 February 25, 1983 AEP:NRC:0631B Donald C.Cook Nuclear Plant Unit Nos.1 and 2 Docket Nos.50-315 and 50-316 License Nos.DPR-58 and DPR-74 NUREG-0737, ITEM II.F.1.6 TECHNICAL SPECIFICATIOVi FEES PURSUANT TO 10 CFR 170 Mr.Harold R.Denton, Director Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555

Dear Mr.Denton:

In our letter No.AEP:NRC:0631A, dated September 29, 1982, we submitted proposed Appendix A Technical Specification (T/S)changes required for placing the new Post-Accident Containment Hydrogen Monitoring System (PACRiS)into service to satisfy the requirements of NUREG-0737, Item II.F.1.6~Our 3.etter included a statement to the effect that the payment for these changes would be made as part of the fee to be levied for the issuance of the T/S changes required by NUREG-0737.

However, by way of his February 3, 1983, letter to Mr.John E.Dolan, Mr.William O.Miller requested the remittance of$4,400 to cover the NRC review expenses.We wish to bring to your attention that on February 15, 1983, we received Generic Letter 82-16 which requests the submittal of thirteen NUREG-0737-required T/S consolidated into one submittal.

Furthermore, a draft Generic Letter transmitted by Mr.Darrell G.Eisenhut to Mr.Carl Walske of the Atomic Industrial Forum, dated January 28, 1983, requests submittal of the T/S.required"for the implementation of ei'ghteen NUREG-0737 items, one of which is item II.F.1.6.Mr.Eisenhut.'s letter again requests that the T/S changes be consolidated'nto one submittal.

The early implementation of.Item ZI.F.1.6 at the Cook Plant, reflects I&i%Co's concern for the safe operation of the plant and the safety of the public.By requesting payment for this T/S change separately, the NRC is financially penali"ing us for the early implementation of required safety equipment.

Consequently, we request that the payment for the NUREG-0737, Item ZI.F.1.6 T/S be made part of the single fee to be levied for the issuance of the T/S changes required by NUREG-0737.

This document has been prepared following Corporate Procedures which incorporate a reasonable set of controls to ensure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, Nil n P.exich Assistant Vice President Nuclear Engineering MPA/md cc: John E.Dolan-Columbus R.S.Hunter R.W.Jurgensen W.G.Smith, Jr.-Bridgman R.C.Callen G.Charnoff W.0.?Q.lier-NRC NRC Resident Inspector at Cook Plant-Bridgman A~"l'I (