ML18331A042: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 3: | Line 3: | ||
| issue date = 12/07/2018 | | issue date = 12/07/2018 | ||
| title = U.S. Nuclear Regulator Commission Staff Report of Regulatory Audit of Nuscale Power, LLC; Design Documents for Containment Isolation Valves and Reactor Safety Valves | | title = U.S. Nuclear Regulator Commission Staff Report of Regulatory Audit of Nuscale Power, LLC; Design Documents for Containment Isolation Valves and Reactor Safety Valves | ||
| author name = Vera A | | author name = Vera A | ||
| author affiliation = NRC/NRO/DLSE/LB1 | | author affiliation = NRC/NRO/DLSE/LB1 | ||
| addressee name = Lee | | addressee name = Lee S | ||
| addressee affiliation = NRC/NRO/DLSE/LB1 | | addressee affiliation = NRC/NRO/DLSE/LB1 | ||
| docket = 05200048 | | docket = 05200048 | ||
| license number = | | license number = | ||
| contact person = Vera A | | contact person = Vera A/NRO/415-5861 | ||
| document type = Audit Report, Memoranda | | document type = Audit Report, Memoranda | ||
| page count = 16 | | page count = 16 | ||
Revision as of 17:47, 12 June 2019
| ML18331A042 | |
| Person / Time | |
|---|---|
| Site: | NuScale |
| Issue date: | 12/07/2018 |
| From: | Amadiz Marieliz Vera NRC/NRO/DLSE/LB1 |
| To: | Samson Lee NRC/NRO/DLSE/LB1 |
| Vera A/NRO/415-5861 | |
| References | |
| Download: ML18331A042 (16) | |
Text
/RA/
Code of Federal Regulations The application must contain a level of design information sufficient to enable the Commission to judge the applicant's proposed means of assuring that construction conforms to the design and to reach a final conclusion on all safety questions associated with the design before the certification is granted. The information submitted for a design certification must include performance requirements and design information sufficiently detailed to permit the preparation of acceptance and inspection requirements by the NRC, and procurement specifications and construction and installation specifications by an applicant. The Commission will require, before design certification, that information normally contained in certain procurement specifications and construction and installation specifications be completed and available for audit if the information is necessary for the Commission to make its safety determination.
Boiler & Pressure Vessel Code
Boiler & Pressure Vessel Code