ML17198B283: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[GNRO-2017/00049, NRC Form 536 Response to Regulatory Issue Summary 2017-03]]
| number = ML17198B283
| issue date = 07/17/2017
| title = NRC Form 536 Response to Regulatory Issue Summary 2017-03
| author name = Ellis D R
| author affiliation = Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000416
| license number =
| contact person =
| case reference number = GNRO-2017/00049, RIS 2017-03
| document type = Letter
| page count = 3
}}
 
=Text=
{{#Wiki_filter:Entergy Operations, Inc.P.o.Box 756PortGibson,Mississippi39150 David EllisActing-Regulatory Assurance ManagerGrandGulfNuclearStation Tel: 601-437-2489 GNRO-2017/00049July17,2017 u.s.Nuclear Regulatory Commission Attention:
DocumentControlDesk Washington,D.C.20555-0001
 
==SUBJECT:==
NRCForm536 Response to Regulatory Issue Summary 2017-03 Grand Gulf NuclearStation,Unit1 DocketNo.50-416LicenseNo.NPF-29
 
==DearSirorMadam:==
EntergyOperations,Inc.inaccordancewithNRCRegulatoryIssueSummary(RIS)2017-03,"PreparationandSchedulingofOperatorLicensingExaminations,"issubmittingNRCForm536,"OperatorLicensingExaminationData,"toprovidethe estimated number of candidatestobe examined during calendaryears2019 through 2022.Theupdated informationforGrand Gulf Nuclear Station is providedinthe attachedNRCForm536.This information representsthebest estimate currently available.ThisisarevisionofGNRO2017/00041NRCForm536per discussion and requestofNRCRegionIVChief, Operations Branch.NoInitialLicense examinations are scheduledfor2018andtherearenonew commitments containedinthissubmittal.Ifyouhaveany questionsorrequire additional informationregardingthismatter,please contactMikeRaschat 601-437-2255.
 
==Attachment:==
 
cc:NRCForm536"Operator Licensing Examination Data"(SeeNextPage)
Entergy Operations, Inc.P.o.Box 756PortGibson,Mississippi39150 David EllisActing-Regulatory Assurance ManagerGrandGulfNuclearStation Tel: 601-437-2489 GNRO-2017/00049July17,2017 u.s.Nuclear Regulatory Commission Attention:
DocumentControlDesk Washington,D.C.20555-0001
 
==SUBJECT:==
NRCForm536 Response to Regulatory Issue Summary 2017-03 Grand Gulf NuclearStation,Unit1 DocketNo.50-416LicenseNo.NPF-29
 
==DearSirorMadam:==
EntergyOperations,Inc.inaccordancewithNRCRegulatory IssueSummary(RIS)2017-03,"PreparationandSchedulingofOperatorLicensingExaminations,"issubmittingNRCForm536,"OperatorLicensingExaminationData,"toprovidethe estimated number of candidatestobe examined during calendaryears2019 through 2022.Theupdated informationforGrand Gulf Nuclear Station is providedinthe attachedNRCForm536.This information representsthebest estimate currently available.ThisisarevisionofGNRO2017/00041NRCForm536per discussion and requestofNRCRegionIVChief, Operations Branch.NoInitialLicense examinations are scheduledfor2018andtherearenonew commitments containedinthissubmittal.Ifyouhaveany questionsorrequire additional informationregardingthismatter,please contactMikeRaschat 601-437-2255.
 
==Attachment:==
 
cc:NRCForm536"Operator Licensing Examination Data"(SeeNextPage)
GNRO-2017/00049Page2of2 cc:NRCSeniorResidentInspectorGrandGulfNuclearStationPortGibson,MS39150U.S.NuclearRegulatoryCommissionATTN:DocumentControlDeskWashington,DC20555-0001U.S.NuclearRegulatoryCommissionATTN:Ms.Jennifer Bridges1600EastLamarBoulevardArlington,TX76011-4511Mr.VincentGaddyChief,OperationsBranchU.S.NuclearRegulatoryCommission1600EastLamarBoulevardArlington,TX76011-4511 GNRO-2017/00049Page2of2 cc:NRCSeniorResidentInspectorGrandGulfNuclearStationPortGibson,MS39150U.S.NuclearRegulatoryCommissionATTN:DocumentControlDeskWashington,DC20555-0001U.S.NuclearRegulatoryCommissionATTN:Ms.Jennifer Bridges1600EastLamarBoulevardArlington,TX76011-4511Mr.VincentGaddyChief,OperationsBranchU.S.NuclearRegulatoryCommission1600EastLamarBoulevardArlington,TX76011-4511 NRCFORM536U.S.NUCLEAR REGULATORY COMMISSION APPROVEDBYOMB: NO.3150-0131 EXPIRES: 10/31/2017 (05-2016)..Estimated burden per response to complywiththis voluntary information collection request: 1 hour.This">>.information collection is used to plan budgets and resources for operator examinations.
Send00p OPERATOR LICENSING;.comments regarding burden estimatetothe FOIA, Privacy, and Information Collections Branch (T-5..0 F53), U.S.Nuclear Regulatory Commission, Washington, DC20555-0001,orbye-mailto 10 II: EXAMINATION DATA;Infocoliects.Resource@nrc.gov, andtothe Desk Officer, Office of Information and Regulatory Affairs,+" NEOB-10202, (3150-0131), Office of Management and BUdget, Washington, DC 20503.Ifa means........, used to impose an information collection does not display a currently valid OMB control number, the NRCmaynot conduct or sponsor,anda personisnot required to respondto,the information collection.
FACILITYNRCREGIONGRANDGULF NUCLEAR STATION Docket#50-416 IV L A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY2020CY2021 CY2022--------ESTIMATEDNUMBEROF LICENSEE-PREPARED 0 2 1 0 EXAMINATIONSESTIMATEDNUMBEROF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBERCY2019 CY2020CY2021 CY2022---------NUMBEROFREACTOR 0 3/3 9 0 OPERATORSNUMBEROFSENIORREACTOR 0 10/10 3 0 OPERATORS-INSTANTNUMBEROFSENIORREACTOR 0 3/3 3 0 OPERATORS-UPGRADENUMBEROF SENIOR REACTOR 0 0 0 0OPERATORS-LIMITED PROPOSED DATESPRIMARYDATE 1/27/20&5/4/20 11/29/21ALTERNATEDATE 2/10/20&5/11/20 12/4/21 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE PROPOSED CY 2019 CY 2020 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATEDNUMBEROF 0 0 12 0 CANDIDATESNRCFORM536(05-2016)NRCFORM536U.S.NUCLEAR REGULATORY COMMISSION APPROVEDBYOMB: NO.3150-0131 EXPIRES: 10/31/2017 (05-2016)..Estimated burden per response to complywiththis voluntary information collection request: 1 hour.This">>.information collection is used to plan budgets and resources for operator examinations.
Send00p OPERATOR LICENSING;.comments regarding burden estimatetothe FOIA, Privacy, and Information Collections Branch (T-5..0 F53), U.S.Nuclear Regulatory Commission, Washington, DC20555-0001,orbye-mailto 10 II: EXAMINATION DATA;Infocoliects.Resource@nrc.gov, andtothe Desk Officer, Office of Information and Regulatory Affairs,+" NEOB-10202, (3150-0131), Office of Management and BUdget, Washington, DC 20503.Ifa means........, used to impose an information collection does not display a currently valid OMB control number, the NRCmaynot conduct or sponsor,anda personisnot required to respondto,the information collection.
FACILITYNRCREGIONGRANDGULF NUCLEAR STATION Docket#50-416 IV L A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY2020CY2021 CY2022--------ESTIMATEDNUMBEROF LICENSEE-PREPARED 0 2 1 0 EXAMINATIONSESTIMATEDNUMBEROF NRC-PREPARED 0 0 0 0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBERCY2019 CY2020CY2021 CY2022---------NUMBEROFREACTOR 0 3/3 9 0 OPERATORSNUMBEROFSENIORREACTOR 0 10/10 3 0 OPERATORS-INSTANTNUMBEROFSENIORREACTOR 0 3/3 3 0 OPERATORS-UPGRADENUMBEROF SENIOR REACTOR 0 0 0 0OPERATORS-LIMITED PROPOSED DATESPRIMARYDATE 1/27/20&5/4/20 11/29/21ALTERNATEDATE 2/10/20&5/11/20 12/4/21 C.PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE)SCHEDULE PROPOSED CY 2019 CY 2020 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATEDNUMBEROF 0 0 12 0 CANDIDATESNRCFORM536(05-2016)}}

Latest revision as of 08:38, 6 April 2019