ML18099A284: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[LR-N18-0020, Technical Specification 6.9.1.5.b, 2017 Annual Report of SRV Challenges]]
| number = ML18099A284
| issue date = 04/10/2018
| title = Technical Specification 6.9.1.5.b, 2017 Annual Report of SRV Challenges
| author name = Casulli E T
| author affiliation = PSEG Nuclear, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000354
| license number = NPF-057
| contact person =
| case reference number = LR-N18-0020
| document type = Annual Operating Report, Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:PSEG Nuclear LLC P.O. Box 236, Hancocks Bridge, New Jersey 08038-0236 LR-N18-0020 APRl 0 Z018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555-001
 
==Subject:==
Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 Docket No. 50-354 Technical Specification 6.9.1.5.b 2017 Annual Report of SRV Challenges 0PSEG Nuclear LLC Technical Specification 6.9.1.5.b This report is being submitted in accordance with Hope Creel< Technical Specification 6.9.1.5.b, which requires the documentation of all challenges to main steam line safety/relief valves (SRVs) be provided on an annual basis. For2017, the SRVs were not challenged by any over pressurization events or transients that would have required the valves to respond automatically.
There are no regulatory commitments contained in this letter. If you have any questions or require additional information, please contact Ms. Alysse K. Ochoa at 856-339-2742.
Slnc?JJ-AZ-)
Edward T. Casulli Plant Manager Hope Creek Generating Station al<o LR-N18-0020 Page 2 Technical Specification 6.9. 1 .5.b cc: Mr. David Lew, Acting Regional Administrator-NRC Region 1 Ms. Carleen Parker, Project USNRC Mr. Justin Hawkins, USNRC Senior Resident Inspector
-Hope Creek Mr. Patrick Mulligan, Manager IV, NJBNE Mr. Lee Marabella, Corporate Commitment Tracking Coordinator Mr. Thomas MacEwen, Hope Creek Commitment Tracking Coordinator}}

Latest revision as of 12:32, 5 April 2019