ML18096A664: Difference between revisions
StriderTol (talk | contribs) Created page by program invented by StriderTol |
StriderTol (talk | contribs) Created page by program invented by StriderTol |
||
| Line 2: | Line 2: | ||
| number = ML18096A664 | | number = ML18096A664 | ||
| issue date = 03/18/1992 | | issue date = 03/18/1992 | ||
| title = | | title = Cycle 11 Peaking Factor Limit Rept. | ||
| author name = SCHMIDT J S, WILEY R A | | author name = SCHMIDT J S, WILEY R A | ||
| author affiliation = WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. | | author affiliation = WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. | ||
Revision as of 20:43, 1 April 2019
| ML18096A664 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 03/18/1992 |
| From: | SCHMIDT J S, WILEY R A WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | |
| Shared Package | |
| ML18096A663 | List: |
| References | |
| CDC-92-076, CDC-92-76, PSK-92-011-0, PSK-92-11, NUDOCS 9205040299 | |
| Download: ML18096A664 (3) | |
Text
- CDC-92-076 Ref.: PSK-92-011-0 SALEM UNIT 1 CYCLE 11 PEAKING FACTOR LIMIT REPORT J 1Jffi VERIFIED BY: J. S. Schmidt Core Design C 02-. a .
R. A. Wiley () Core Design C 9205040299 920424 PDR ADOCK 05000272 P PDR Date: Date: 1 of 3
- RADIAL PEAKING FACTOR LIMIT REPORT This radial Peaking Factor Limit Report is provided in accordance with Paragraph 6.9.1.9 of the Salem Unit 1 Nuclear Plant Technical Specifications.
The F limits for RATED THERMAL POWER within specific core planes for xy Cycle 11 shall be: 1. For all core planes containing Bank "D" control rods: < 2.28 for all core elevations (INCORE axial points xy -1 through 61, inclusive).
- 2. For all unrodded planes: < 1.67 for all core elevations (INCORE axial points xy -1 through 61, inclusive).
These F (z) limits were used to confirm that the heat flux hot xy channel factor FQ(z) will be limited to the Technical Specification values of: F ( ) < [2. 32] Q z p [K(z)] for P > 0.5 and, [K(z)] for P < 0.5 assuming the most limiting axial power distributions expected to result from the insertion and removal of control Banks C and D during operation, including the accompanying variations in the axial xenon and power distributions as described in the "Power Distribution Control and Load Following Procedures", WCAP-8385, September, 1974. Therefore, these F limits provide assurance that the initial xy conditions assumed in the LOCA analysis are met, along with the ECCS acceptance criteria of lOCFRS0.46.
See Figure 1 for a plot of [FQT . PRel] versus Axial Core Height. 2 of 3
- * '.i < 2.4 LI 0.2.32 I I 6.2.32 I r-.. ....... Cc -i--.. -10.82.181 I -n 2.2 c _ .... " ., -' UC I" r a ll ... ... [ OL.J .., '-n c* -,_ 2.0 Cl n -.;;[ -\
- ID \ .., [ \ \ -Lj 1.8 ... 1 ,E-. ..... \ -1.6 ::II c \ \ ... \ 12.1.5 I 1.4 [] Cl 1.2 2 4 6 8 10 12 CORE HEIGHT (FEET) FIGURE 1 MAXIMUM CFaT*PRELJ VS AXIAL CORE HEIGHT DURING NORMAL OPERATION 3 of 3