ML18096A662

From kanterella
Jump to navigation Jump to search
Forwards CDC-92-076, Salem Unit 1 Cycle 11 Peaking Factor Limit Rept, Prepared by Westinghouse Per Guidance in Topical Rept WCAP-8385 Dtd Sept 1974
ML18096A662
Person / Time
Site: Salem 
Issue date: 04/24/1992
From: Labruna S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18096A663 List:
References
NLR-N92054, NUDOCS 9205040297
Download: ML18096A662 (2)


Text

'*

Public Service Electric and Gas Company Stanley LaBruna Public Service Electric and Gas Company P.O. Box 236, Hancocks Bridge, NJ 08038 609-339-1200 Vice President - Nuclear Operations APR 2 4 1992 NLR-N92054 U. s. Nuclear Regulatory Commission Document Control Desk Washington, *Dc 20555 Gentlemen:

CYCLE 11 RADIAL PEAKING FACTOR LIMIT REPORT SALEM GENERATING STATION UNIT NO. 1 DOCKET NO. 50-272 Public Service Elec;tric and qas Company (PSE&G) hereby submits the subject report for Salem Unit 1, in accordance with Technical Specification Section 4~2.2.2. This report was prepared by Westinghouse Corporation in accordance with the Westinghouse Methodology, "Power Distribution Control and Load Following Procedures,"

WCAP-8385, September 1974.

PSE&G has reviewed this report and concurs with the results.

Should you have any questions regarding this transmittal, plesae do not hesitate to contact us.

Attachment

~9265040297 920424 I.

PPDR ADOCK 05000272 PDR Sincerely,

Document Control Desk NLR-N92054 2

c Mr. T. T. Martin, Administrator - Region I

u. s. Nuclear Regulatory commission 475 Allendale Road King of Prussia, PA 19406 Mr. J. c. Stone, Licensing Project Manager -

Salem

u. s. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T. P. Johnson (S09)

USNRC Senior Resident Inspector Mr. K. Tosch, Chief NJ Department of Environmental Protection Division of Environmental Quality Bureau of Nuclear Engineering CN 415 Trenton, NJ 08625 APR 2 4 1992