ML070310146: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML070310146
| number = ML070310146
| issue date = 01/30/2007
| issue date = 01/30/2007
| title = Millstone, Unit No. 2, Technical Specification, Pressurizer Water Level Limits
| title = Technical Specification, Pressurizer Water Level Limits
| author name = Nerses V
| author name = Nerses V
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-2

Revision as of 15:15, 10 February 2019

Technical Specification, Pressurizer Water Level Limits
ML070310146
Person / Time
Site: Millstone Dominion icon.png
Issue date: 01/30/2007
From: Nerses V
NRC/NRR/ADRO/DORL/LPLI-2
To: Christian D A
Dominion Nuclear Connecticut
nerses V, NRR//DORL, 415-1484
Shared Package
ML062920332 List:
References
TAC MD0527
Download: ML070310146 (1)


Text

REACTOR COOLANT SYSTEM PRESSURIZER LIMITING CONDITION FOR OPERATION 3.4.4 The pressurizer shall be OPERABLE with: a. Pressurizer water level < 70%, and b. At least two groups of pressurizer heaters each having a capacity of at least 130 kW.APPLICABILITY:

MODES 1, 2 and 3.ACTION: a. With only one group of pressurizer heaters OPERABLE, restore at least two groups to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.b. With the pressurizer otherwise inoperable, be in at least HOT STANDBY with the reactor trip breakers open within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.SURVEILLANCE REQUIREMENTS 4.4.4.1 The pressurizer water level shall be determined to be within its limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.4.4.4.2 Verify at least two groups of pressurizer heaters each have a capacity of at least 130 kW at least once per 92 days: MILLSTONE

-UNIT 2 3/4 4-4 Amendment No. 66, 74, W., 4-30, 24--, 2-64-, 296