Information Notice 2000-18, Substandard Material Supplied by Chicago Bullet Proof Systems: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 4
| page count = 4
}}
}}
{{#Wiki_filter:     1Code of Federal RegulationsUNITED STATESNUCLEAR REGULATORY COMMISSIONOFFICE OF NUCLEAR REACTOR REGULATIONWASHINGTON, D. C.  20555-0001November 29, 2000NRC INFORMATION NOTICE 2000-18:SUBSTANDARD MATERIAL SUPPLIED BY  CHICAGOBULLET PROOF SYSTEMS
{{#Wiki_filter:1 Code of Federal Regulations
 
===UNITED STATES===
NUCLEAR REGULATORY COMMISSION
 
===OFFICE OF NUCLEAR REACTOR REGULATION===
WASHINGTON, D. C.  20555-0001
 
===November 29, 2000===
NRC INFORMATION NOTICE 2000-18:
 
===SUBSTANDARD MATERIAL SUPPLIED BY  CHICAGO===
BULLET PROOF SYSTEMS


==Addressees==
==Addressees==
All 10 CFR1 Part 50 Licensees and Applicants.All Category I Fuel Facilities.All 10 CFR1 Part 72 Licensees and Applicants.
All 10 CFR
 
1 Part 50 Licensees and Applicants.
 
All Category I Fuel Facilities.
 
All 10 CFR
 
1 Part 72 Licensees and Applicants.


==Purpose==
==Purpose==
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to informaddressees of substandard material supplied by Chicago Bullet Proof Systems (CBPS) to Fort
The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to inform
 
addressees of substandard material supplied by Chicago Bullet Proof Systems (CBPS) to Fort


St. Vrain and Susquehanna nuclear power plants.  It is expected that recipients will review the
St. Vrain and Susquehanna nuclear power plants.  It is expected that recipients will review the
Line 31: Line 53:


==Description of Circumstances==
==Description of Circumstances==
CBPS supplied substandard materials to two NRC licensees.Fort St. VrainPublic Service Company Colorado (PSCo,) a contractor for the U. S. Department of Energy, thelicensee for the independent spent fuel storage installation (ISFSI) at Fort St. Vrain, notified the
CBPS supplied substandard materials to two NRC licensees.
 
===Fort St. Vrain===
Public Service Company Colorado (PSCo,) a contractor for the U. S. Department of Energy, the
 
licensee for the independent spent fuel storage installation (ISFSI) at Fort St. Vrain, notified the


NRC that CBPS supplied substandard steel plating for a security alarm station at Fort St. Vrain.
NRC that CBPS supplied substandard steel plating for a security alarm station at Fort St. Vrain.
Line 39: Line 66:
Underwriters Laboratory (UL) Standard 752, Level 4.  This UL Standard was specified on the
Underwriters Laboratory (UL) Standard 752, Level 4.  This UL Standard was specified on the


PSC purchase order.  With regard to the steel plating, the purchase order listed Shot-Tex #4 Bullet Resistant Steel Wall Armor (CBPS's proprietary name for material that conforms with UL
PSC purchase order.  With regard to the steel plating, the purchase order listed Shot-Tex #4
 
Bullet Resistant Steel Wall Armor (CBPS's proprietary name for material that conforms with UL


Standard 752, Level 4).  CBPS's subcontractor, Metaltek Fabricating, Inc., actually shipped the
Standard 752, Level 4).  CBPS's subcontractor, Metaltek Fabricating, Inc., actually shipped the
Line 45: Line 74:
steel to Fort St. Vrain.  PSC asked CBPS to provide a certified material test report for the steel, but CBPS declined to do so, claiming that the information was proprietary.  CBPS told PSC that
steel to Fort St. Vrain.  PSC asked CBPS to provide a certified material test report for the steel, but CBPS declined to do so, claiming that the information was proprietary.  CBPS told PSC that


the material supplied, Shot-Tex #4, conformed to the UL standard and subsequently provided a Certificate of Compliance.  PSC had the steel independently tested and determined it to besimilar to A-36 type mild carbon steel, which is not in conformance with UL Standard 752, Level
the material supplied, Shot-Tex #4, conformed to the UL standard and subsequently provided


4.SusquehannaA contractor for Pennsylvania Power and Light (PP&L), the licensee for Susquehanna, issued apurchase order to CBPS for a replacement gun port, including a mounting plate and side plate, for the Susquehanna plant.  The purchase order specified that the gun port, the mounting plate
a Certificate of Compliance.  PSC had the steel independently tested and determined it to be
 
similar to A-36 type mild carbon steel, which is not in conformance with UL Standard 752, Level
 
4.Susquehanna
 
A contractor for Pennsylvania Power and Light (PP&L), the licensee for Susquehanna, issued a
 
purchase order to CBPS for a replacement gun port, including a mounting plate and side plate, for the Susquehanna plant.  The purchase order specified that the gun port, the mounting plate


and the side plate, were to be constructed of Shot Tex #4 Bullet Resistant Steel Wall Armor.
and the side plate, were to be constructed of Shot Tex #4 Bullet Resistant Steel Wall Armor.
Line 55: Line 92:
certifying that the gun port material conformed with UL Standard 752, Level 4.  A PP&L
certifying that the gun port material conformed with UL Standard 752, Level 4.  A PP&L


metallurgist independently did a nondestructive test of the gun port mounting plate and slideplate.  The test showed that the mounting plate had the hardness of A-36 type mild carbonsteel, and was not in conformance with UL Standard 752, Level 4.DiscussionThe regulations in 10 CFR 73.51, "Requirements for the physical protection of stored spentnuclear fuel and high-level radioactive waste," and 10 CFR 73.55, "Requirements for physical
metallurgist independently did a nondestructive test of the gun port mounting plate and slide


protection of licensed activities in nuclear power reactors against radiological sabotage," statethat structures must be constructed of bullet-resistant material.  NUREG-0908, "AcceptanceCriteria for the Evaluation of Nuclear Power Reactor Security Plans," states that an acceptable
plate.  The test showed that the mounting plate had the hardness of
 
A-36 type
 
mild carbon
 
steel, and was not in conformance with UL Standard 752, Level 4.
 
Discussion
 
The regulations in 10 CFR 73.51, "Requirements for the physical protection of stored spent
 
nuclear fuel and high-level radioactive waste," and 10 CFR 73.55, "Requirements for physical
 
protection of licensed activities in nuclear power reactors against radiological sabotage," state
 
that structures must be constructed of bullet-resistant material.  NUREG-0908, "Acceptance
 
Criteria for the Evaluation of Nuclear Power Reactor Security Plans," states that an acceptable


security plan defines bullet-resistant material as capable of resisting a high-power rifle round
security plan defines bullet-resistant material as capable of resisting a high-power rifle round


(Level 4), as described in UL Standard 752.In the two cases described above, CBPS supplied material that was not in conformance withspecifications of the purchase orders and not in conformance with NRC guidance documents
(Level 4), as described in UL Standard 752.
 
In the two cases described above, CBPS supplied material that was not in conformance with
 
specifications of the purchase orders and not in conformance with NRC guidance documents


(NUREG-0908).  CBPS certified by Certificates of Compliance that the steel wall armor material
(NUREG-0908).  CBPS certified by Certificates of Compliance that the steel wall armor material
Line 71: Line 130:
procurement program identified the material as substandard before installing it at Fort St. Vrain.
procurement program identified the material as substandard before installing it at Fort St. Vrain.


PP&L, after determining that its installed gun port was not in compliance with UL Standard 752, Level 4, took appropriate corrective action.The NRC staff found that although CBPS was responsible for material certification andverification at the Metaltek facility, CBPS did not adequately perform material quality and
PP&L, after determining that its installed gun port was not in compliance with UL Standard 752, Level 4, took appropriate corrective action.
 
The NRC staff found that although CBPS was responsible for material certification and
 
verification at the Metaltek facility, CBPS did not adequately perform material quality and


chemical verification activities.  The NRC also found that CBPS did not typically request certified
chemical verification activities.  The NRC also found that CBPS did not typically request certified


material test reports for any of the steel used for UL Standard 752, Level 4 applications. This information notice requires no specific action or written response.  If you have anyquestions about the information in this notice, please contact one of the technical contacts listed
material test reports for any of the steel used for UL Standard 752, Level 4 applications. This information notice requires no specific action or written response.  If you have any
 
questions about the information in this notice, please contact one of the technical contacts listed


below or the appropriate Office of Nuclear Reactor Regulation (NRR) or Office of Nuclear
below or the appropriate Office of Nuclear Reactor Regulation (NRR) or Office of Nuclear


Material Safety and Safeguards (NMSS) project manager. /RA//RA/Michael F. Weber, DirectorLedyard B. Marsh, ChiefDivision of Fuel Cycle SafetyEvents Assessment, Generic Communications and Safeguards and Non-Power Reactors BranchOffice of Nuclear Material SafetyDivision of Regulatory Improvement Programs and SafeguardsOffice of Nuclear Reactor RegulationTechnical contacts:  Joseph Petrosino, NRREric Benner, NRR301-415-2979301-415-1171E-mail: jjp1@nrc.govE-mail: ejb1@nrc.govRobert Skelton, NRR Michael Warren, NMSS301-415-3309301-415-8098E-mail: rfs1@nrc.govE-mail: msw@nrc.govAttachment:  List of Recently Issued NRC Information Notices This information notice requires no specific action or written response.  If you have anyquestions about the information in this notice, please contact one of the technical contacts listed
Material Safety and Safeguards (NMSS) project manager.
 
/RA//RA/Michael F. Weber, Director
 
===Ledyard B. Marsh, Chief===
Division of Fuel Cycle Safety
 
===Events Assessment, Generic Communications===
  and Safeguards
 
and Non-Power Reactors Branch
 
===Office of Nuclear Material Safety===
Division of Regulatory Improvement Programs
 
and Safeguards
 
===Office of Nuclear Reactor Regulation===
Technical contacts:  Joseph Petrosino, NRR
 
===Eric Benner, NRR===
301-415-2979
301-415-1171 E-mail: jjp1@nrc.gov
 
E-mail: ejb1@nrc.gov
 
Robert Skelton, NRR
 
===Michael Warren, NMSS===
301-415-3309
301-415-8098 E-mail: rfs1@nrc.gov
 
E-mail: msw@nrc.gov
 
Attachment:  List of Recently Issued NRC Information Notices This information notice requires no specific action or written response.  If you have any
 
questions about the information in this notice, please contact one of the technical contacts listed


below or the appropriate Office of Nuclear Reactor Regulation (NRR) or Office of Nuclear
below or the appropriate Office of Nuclear Reactor Regulation (NRR) or Office of Nuclear


Material Safety and Safeguards (NMSS) project manager. /RA//RA/Michael F. Weber, DirectorLedyard B. Marsh, ChiefDivision of Fuel Cycle SafetyEvents Assessment, Generic Communications and Safeguards and Non-Power Reactors BranchOffice of Nuclear Material SafetyDivision of Regulatory Improvement Programs and Safeguards Office of Nuclear Reactor RegulationTechnical contacts:  Joseph Petrosino, NRREric Benner, NRR301-415-2979301-415-1171E-mail: jjp1@nrc.govE-mail: ejb1@nrc.govRobert Skelton, NRR Michael Warren, NMSS301-415-3309301-415-8098E-mail: rfs1@nrc.govE-mail: msw@nrc.govAttachment:  List of Recently Issued NRC Information NoticesDistribution:IN FilePUBLIC
Material Safety and Safeguards (NMSS) project manager.
 
/RA//RA/Michael F. Weber, Director
 
===Ledyard B. Marsh, Chief===
Division of Fuel Cycle Safety
 
===Events Assessment, Generic Communications===
  and Safeguards
 
and Non-Power Reactors Branch
 
===Office of Nuclear Material Safety===
Division of Regulatory Improvement Programs
 
and Safeguards
 
Office of Nuclear Reactor Regulation
 
Technical contacts:  Joseph Petrosino, NRR
 
===Eric Benner, NRR===
301-415-2979
301-415-1171 E-mail: jjp1@nrc.gov
 
E-mail: ejb1@nrc.gov
 
Robert Skelton, NRR
 
===Michael Warren, NMSS===
301-415-3309
301-415-8098 E-mail: rfs1@nrc.gov
 
E-mail: msw@nrc.gov
 
Attachment:  List of Recently Issued NRC Information Notices
 
===Distribution===
: IN File PUBLIC


G:\REXB\EJB1\CBPS IN.WPD
G:\REXB\EJB1\CBPS IN.WPD


Accession No.:  ML003765058Template No.: 052*see previous concurrenceTo receive a copy of this document, indicate in the box C=Copy w/o attachment/enclosure E=Copy with attachment/enclosure N = No copyOFFICEREXBIQMBTech EdIOLBIQMBIQMBIOMBNAMEEBenner*JPetrosino*PKleene*RSkelton*DDorman*TQuay*GTracy*DATE10/31/0010/31/0010/30/00 11/1/00 11/1/00  11/1/0011/2/00SFPOFCSSD:FCSSC:REXB:DRIPBBrach(JJP for*)MWarren*MWeber*LMarsh11/7/0011/9/0011/27/0011/29/00OFFICIAL RECORD COPY
Accession No.:  ML00
3765058 Template No.: 052
*see previous concurrence
 
To receive a copy of this document, indicate in the box C=Copy w/o attachment/enclosure E=Copy with attachment/enclosure N = No copy
 
OFFICE REXB IQMB Tech Ed IOLB IQMB IQMB IOMB NAME EBenner*JPetrosino*
PKleene*RSkelton*DDorman*TQuay*GTracy*DATE 10/31/00 10/31/00 10/30/00 11/1/00 11/1/00  11/1/00
11/2/00 SFPO FCSS D:FCSS C:REXB:DRIP


______________________________________________________________________________________OL = Operating License
BBrach(JJP for*)
MWarren*MWeber*LMarsh 11/7/00 11/9/00 11/27/00 11/29/00 OFFICIAL RECORD COPY


CP = Construction PermitAttachment 1 LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICES_____________________________________________________________________________________InformationDate of Notice No.        SubjectIssuanceIssued to______________________________________________________________________________________2000-17 S1Crack In Weld Area of ReactorCoolant System Hot Leg Piping
______________________________________________________________________________________
OL = Operating License


At V.C. Summer11/16/2000All holders of OL for nuclearpower reactors except those who
CP = Construction Permit
 
===Attachment 1 LIST OF RECENTLY ISSUED===
NRC INFORMATION NOTICES
 
_____________________________________________________________________________________
Information
 
Date of Notice No.
 
Subject
 
Issuance Issued to______________________________________________________________________________________
2000-17 S1
 
===Crack In Weld Area of Reactor===
Coolant System Hot Leg Piping
 
===At V.C. Summer===
11/16/2000
 
===All holders of OL for nuclear===
power reactors except those who


have ceased operations and have
have ceased operations and have
Line 101: Line 272:
permanently removed from the
permanently removed from the


reactor vessel2000-17Crack In Weld Area of ReactorCoolant System Hot Leg Piping
reactor vessel
 
2000-17 Crack In Weld Area of Reactor
 
===Coolant System Hot Leg Piping===
 
===At V.C. Summer===
10/18/2000


At V.C. Summer10/18/2000All holders of OL for nuclearpower reactors except those who
===All holders of OL for nuclear===
power reactors except those who


have ceased operations and have
have ceased operations and have
Line 111: Line 290:
permanently removed from the
permanently removed from the


reactor vessel2000-16Potential Hazards Due toVolatilization of Radionuclides10/5/2000All NRC licensees that processunsealed byproduct material2000-15Recent Events Resulting inWhole Body Exposures
reactor vessel
 
2000-16 Potential Hazards Due to
 
===Volatilization of Radionuclides===
10/5/2000 All NRC licensees that process
 
unsealed byproduct material
 
2000-15 Recent Events Resulting in
 
===Whole Body Exposures===
 
===Exceeding Regulatory Limits===
9/29/2000 All radiography licensees
 
2000-14 Non-Vital Bus Fault Leads to
 
===Fire and Loss of Offsite Power===
9/27/2000 All holders of OL for nuclear
 
power reactors
 
2000-13 Review of Refueling Outage
 
Risk 9/27/2000 All holders of OL for nuclear


Exceeding Regulatory Limits9/29/2000All radiography licensees2000-14Non-Vital Bus Fault Leads toFire and Loss of Offsite Power9/27/2000All holders of OL for nuclearpower reactors2000-13Review of Refueling OutageRisk9/27/2000All holders of OL for nuclearpower reactors2000-12Potential Degradation ofFirefighter Primary Protective
power reactors


Garments9/21/2000All holders of licenses for nuclearpower, research, and test
2000-12 Potential Degradation of


reactors and fuel cycle facilities2000-11Licensee Responsibility forQuality Assurance Oversight of
===Firefighter Primary Protective===
 
Garments 9/21/2000 All holders of licenses for nuclear
 
power, research, and test
 
reactors and fuel cycle facilities
 
2000-11 Licensee Responsibility for
 
===Quality Assurance Oversight of===


===Contractor Activities Regarding===
===Contractor Activities Regarding===
Fabrication and Use of Spent


Fuel Storage Cask Systems8/7/2000All U.S. NRC 10 CFR Part 50 andPart 72 licensees, and Part 72 Certificate of Compliance holders
===Fabrication and Use of Spent===
 
===Fuel Storage Cask Systems===
8/7/2000 All U.S. NRC 10 CFR Part 50 and
 
===Part 72 licensees, and Part 72===


}}
Certificate of Compliance holders}}


{{Information notice-Nav}}
{{Information notice-Nav}}

Revision as of 17:04, 31 August 2018

Substandard Material Supplied by Chicago Bullet Proof Systems
ML003765058
Person / Time
Issue date: 11/29/2000
From: Marsh L B
Operational Experience and Non-Power Reactors Branch
To:
References
IN-00-018
Download: ML003765058 (4)


1 Code of Federal Regulations

UNITED STATES

NUCLEAR REGULATORY COMMISSION

OFFICE OF NUCLEAR REACTOR REGULATION

WASHINGTON, D. C. 20555-0001

November 29, 2000

NRC INFORMATION NOTICE 2000-18:

SUBSTANDARD MATERIAL SUPPLIED BY CHICAGO

BULLET PROOF SYSTEMS

Addressees

All 10 CFR

1 Part 50 Licensees and Applicants.

All Category I Fuel Facilities.

All 10 CFR

1 Part 72 Licensees and Applicants.

Purpose

The U.S. Nuclear Regulatory Commission (NRC) is issuing this information notice to inform

addressees of substandard material supplied by Chicago Bullet Proof Systems (CBPS) to Fort

St. Vrain and Susquehanna nuclear power plants. It is expected that recipients will review the

information for applicability to their facilities and consider actions, as appropriate, to avoid similar

problems. However, suggestions contained in this information notice are not NRC

requirements; therefore, no specific action or written response is required.

Description of Circumstances

CBPS supplied substandard materials to two NRC licensees.

Fort St. Vrain

Public Service Company Colorado (PSCo,) a contractor for the U. S. Department of Energy, the

licensee for the independent spent fuel storage installation (ISFSI) at Fort St. Vrain, notified the

NRC that CBPS supplied substandard steel plating for a security alarm station at Fort St. Vrain.

CBPS was required to provide a Certificate of Compliance to certify that materials conformed to

Underwriters Laboratory (UL) Standard 752, Level 4. This UL Standard was specified on the

PSC purchase order. With regard to the steel plating, the purchase order listed Shot-Tex #4

Bullet Resistant Steel Wall Armor (CBPS's proprietary name for material that conforms with UL

Standard 752, Level 4). CBPS's subcontractor, Metaltek Fabricating, Inc., actually shipped the

steel to Fort St. Vrain. PSC asked CBPS to provide a certified material test report for the steel, but CBPS declined to do so, claiming that the information was proprietary. CBPS told PSC that

the material supplied, Shot-Tex #4, conformed to the UL standard and subsequently provided

a Certificate of Compliance. PSC had the steel independently tested and determined it to be

similar to A-36 type mild carbon steel, which is not in conformance with UL Standard 752, Level

4.Susquehanna

A contractor for Pennsylvania Power and Light (PP&L), the licensee for Susquehanna, issued a

purchase order to CBPS for a replacement gun port, including a mounting plate and side plate, for the Susquehanna plant. The purchase order specified that the gun port, the mounting plate

and the side plate, were to be constructed of Shot Tex #4 Bullet Resistant Steel Wall Armor.

After supplying the gun port to PP&L, CBPS provided PP&L a Certificate of Compliance

certifying that the gun port material conformed with UL Standard 752, Level 4. A PP&L

metallurgist independently did a nondestructive test of the gun port mounting plate and slide

plate. The test showed that the mounting plate had the hardness of

A-36 type

mild carbon

steel, and was not in conformance with UL Standard 752, Level 4.

Discussion

The regulations in 10 CFR 73.51, "Requirements for the physical protection of stored spent

nuclear fuel and high-level radioactive waste," and 10 CFR 73.55, "Requirements for physical

protection of licensed activities in nuclear power reactors against radiological sabotage," state

that structures must be constructed of bullet-resistant material. NUREG-0908, "Acceptance

Criteria for the Evaluation of Nuclear Power Reactor Security Plans," states that an acceptable

security plan defines bullet-resistant material as capable of resisting a high-power rifle round

(Level 4), as described in UL Standard 752.

In the two cases described above, CBPS supplied material that was not in conformance with

specifications of the purchase orders and not in conformance with NRC guidance documents

(NUREG-0908). CBPS certified by Certificates of Compliance that the steel wall armor material

supplied to Fort St. Vrain and Susquehanna conformed with UL Standard 752, Level 4, when in

fact metallurgical testing by licensees determined the material to be substandard. PSC's

procurement program identified the material as substandard before installing it at Fort St. Vrain.

PP&L, after determining that its installed gun port was not in compliance with UL Standard 752, Level 4, took appropriate corrective action.

The NRC staff found that although CBPS was responsible for material certification and

verification at the Metaltek facility, CBPS did not adequately perform material quality and

chemical verification activities. The NRC also found that CBPS did not typically request certified

material test reports for any of the steel used for UL Standard 752, Level 4 applications. This information notice requires no specific action or written response. If you have any

questions about the information in this notice, please contact one of the technical contacts listed

below or the appropriate Office of Nuclear Reactor Regulation (NRR) or Office of Nuclear

Material Safety and Safeguards (NMSS) project manager.

/RA//RA/Michael F. Weber, Director

Ledyard B. Marsh, Chief

Division of Fuel Cycle Safety

Events Assessment, Generic Communications

and Safeguards

and Non-Power Reactors Branch

Office of Nuclear Material Safety

Division of Regulatory Improvement Programs

and Safeguards

Office of Nuclear Reactor Regulation

Technical contacts: Joseph Petrosino, NRR

Eric Benner, NRR

301-415-2979

301-415-1171 E-mail: jjp1@nrc.gov

E-mail: ejb1@nrc.gov

Robert Skelton, NRR

Michael Warren, NMSS

301-415-3309

301-415-8098 E-mail: rfs1@nrc.gov

E-mail: msw@nrc.gov

Attachment: List of Recently Issued NRC Information Notices This information notice requires no specific action or written response. If you have any

questions about the information in this notice, please contact one of the technical contacts listed

below or the appropriate Office of Nuclear Reactor Regulation (NRR) or Office of Nuclear

Material Safety and Safeguards (NMSS) project manager.

/RA//RA/Michael F. Weber, Director

Ledyard B. Marsh, Chief

Division of Fuel Cycle Safety

Events Assessment, Generic Communications

and Safeguards

and Non-Power Reactors Branch

Office of Nuclear Material Safety

Division of Regulatory Improvement Programs

and Safeguards

Office of Nuclear Reactor Regulation

Technical contacts: Joseph Petrosino, NRR

Eric Benner, NRR

301-415-2979

301-415-1171 E-mail: jjp1@nrc.gov

E-mail: ejb1@nrc.gov

Robert Skelton, NRR

Michael Warren, NMSS

301-415-3309

301-415-8098 E-mail: rfs1@nrc.gov

E-mail: msw@nrc.gov

Attachment: List of Recently Issued NRC Information Notices

Distribution

IN File PUBLIC

G:\REXB\EJB1\CBPS IN.WPD

Accession No.: ML00

3765058 Template No.: 052

  • see previous concurrence

To receive a copy of this document, indicate in the box C=Copy w/o attachment/enclosure E=Copy with attachment/enclosure N = No copy

OFFICE REXB IQMB Tech Ed IOLB IQMB IQMB IOMB NAME EBenner*JPetrosino*

PKleene*RSkelton*DDorman*TQuay*GTracy*DATE 10/31/00 10/31/00 10/30/00 11/1/00 11/1/00 11/1/00

11/2/00 SFPO FCSS D:FCSS C:REXB:DRIP

BBrach(JJP for*)

MWarren*MWeber*LMarsh 11/7/00 11/9/00 11/27/00 11/29/00 OFFICIAL RECORD COPY

______________________________________________________________________________________

OL = Operating License

CP = Construction Permit

Attachment 1 LIST OF RECENTLY ISSUED

NRC INFORMATION NOTICES

_____________________________________________________________________________________

Information

Date of Notice No.

Subject

Issuance Issued to______________________________________________________________________________________

2000-17 S1

Crack In Weld Area of Reactor

Coolant System Hot Leg Piping

At V.C. Summer

11/16/2000

All holders of OL for nuclear

power reactors except those who

have ceased operations and have

certified that fuel has been

permanently removed from the

reactor vessel

2000-17 Crack In Weld Area of Reactor

Coolant System Hot Leg Piping

At V.C. Summer

10/18/2000

All holders of OL for nuclear

power reactors except those who

have ceased operations and have

certified that fuel has been

permanently removed from the

reactor vessel

2000-16 Potential Hazards Due to

Volatilization of Radionuclides

10/5/2000 All NRC licensees that process

unsealed byproduct material

2000-15 Recent Events Resulting in

Whole Body Exposures

Exceeding Regulatory Limits

9/29/2000 All radiography licensees

2000-14 Non-Vital Bus Fault Leads to

Fire and Loss of Offsite Power

9/27/2000 All holders of OL for nuclear

power reactors

2000-13 Review of Refueling Outage

Risk 9/27/2000 All holders of OL for nuclear

power reactors

2000-12 Potential Degradation of

Firefighter Primary Protective

Garments 9/21/2000 All holders of licenses for nuclear

power, research, and test

reactors and fuel cycle facilities

2000-11 Licensee Responsibility for

Quality Assurance Oversight of

Contractor Activities Regarding

Fabrication and Use of Spent

Fuel Storage Cask Systems

8/7/2000 All U.S. NRC 10 CFR Part 50 and

Part 72 licensees, and Part 72

Certificate of Compliance holders