ML12164A752: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[NRC 2012-0044, Point Beach, Units 1 and 2 - Technical Requirements Manual Change Summary]]
| number = ML12164A752
| issue date = 06/12/2012
| title = Point Beach, Units 1 and 2 - Technical Requirements Manual Change Summary
| author name = Costedio J
| author affiliation = NextEra Energy Point Beach, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000266, 05000301
| license number = DPR-024, DPR-027
| contact person =
| case reference number = NRC 2012-0044
| document type = Letter, Manual
| page count = 3
}}
 
=Text=
{{#Wiki_filter:/ BEACH June 12,2012 NRC 201 2-0044 10 CFR 50.71 (e) U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Technical Requirements Manual Chanqe Summarv In accordance with 10 CFR 50.71 (e), NextEra Energy Point Beach, LLC (NextEra), is submitting changes made to the Point Beach Nuclear Plant Technical Requirements Manual (TRM). The enclosure contains the TRM change summary for the period January 1, 201 1, through December 31, 201 1. NextEra previously submitted the TRM change summary for January 1,201 0, through December 31,201 0, on June 9,201 1 (MLI 11 61 0157). This letter contains no new commitments and no revisions to existing commitments. If you have questions or require additional information, please contact William Hennessy at 9201755-7656. Very truly yours, NextEra Energy Point Beach, LLC James Costedio Licensing Manager Enclosure cc: Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC, 661 0 Nuclear Road, Two Rivers, WI 54241 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENT MANUAL CHANGE
 
==SUMMARY==
FOR 2011 Date of Affected Affected Channe Section Panests) Summary 1011911 I TRM 2.1 All Revision 13 of the Unit 1 Core Operating Limits Report U 1 (COLR) (MLI 13080091). Unit 1 Cycle 34 COLR. 1110211 I TRM 2.1 All Revision 14 of the Unit 1 COLR (MLI 13080091). Unit 1 U 1 Cycle 34 COLR. 0312311 1 TRM 2.1 All Revision 13 of the Unit 2 COLR (MLI 10830008). Unit 2 U2 Cycle 32 COLR. 05/18/11 TRM 2.1 All Revision 14 of the Unit 2 COLR (MLI 11390426). Unit 2 U2 Cycle 32 COLR. 08/02/11 TRM 2.1 All Revision 15 of the Unit 2 COLR (MLI 121 7041 4). Unit 2 U2 Cycle 32 COLR. 05/18/11 TRM 2.2 All Revision 7 of the Pressure and Temperature Limits Report (MLI 1 1390426). 1 111 511 1 TRM 3.3.2 All Changed the applicability of the leading edge flow meter for extended power uprate (EPU). 1111 511 1 TRM 3.5.1 3.5.1 -4, 5, Changed the minimum combined volume requirements and 7 on Table 3.5.1-1. Changed the refueling water storage tank boron concentration to 2800 ppm borated water. Added a reference; NRC Safety Evaluation for License Amendments 2411245, dated May 3,201 1. I 112311 I TRM 3.5.1 3.5.1 -4 Added a 3.00 to < 3.50 Boric Acid Solution Concentration Line to Table 3.5.1 -1. 1111511 I TRM 3.7.6 3.7.6-4, 8 Increased the electrical power level at which the crossover steam dump system is activated. Added two references; Siemens letter TL SPG-FPLE PB 0120, dated June 8, 2009, and NRC Safety Evaluation for License Amendments 2411245, dated May 3,201 1. 0111811 I TRM 3.7.7 3.7.7-3, 4, Clarified information regarding flushing activities. 11,12 Page 1 of 2 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL REQUIREMENT MANUAL CHANGE
 
==SUMMARY==
FOR 201 1 Date of Affected Affected Chanqe Section Paqesk) Summary 06/01/11 TRM 3.7.7 3.7.7-7, 9 Updated to reflect changes in the auxiliary feedwater system. 06/01/11 TRM 3.7.9 All New TRM chapter for control room emergency fitration system. 0611 811 1 TRM 3.7.9 3.7.9-3, 4 Clarified information for a filter train inoperable due to an inoperable CRE boundary, and for two isolation dampers in the kitchen exhaust duct inoperable. 06/30/11 TRM 3.9.4 All Reactor vessel head lift administrative controls were removed from the TRM. These controls were removed based on a new analysis demonstrating that a postulated reactor vessel head (RVH) drop would not result in a loss of reactor coolant system (RCS) inventory. This chapter is cancelled. 06/01/11 TRM 4.3 All Added WCAP-14986-A, Revision 2, Westinghouse Owners Group Post Accident Sampling System Requirements, July 2000, as a reference. Removed the reference to NUREG 0737 item ll.B.3, "Post Accident Sampling Capability." 06/04/11 TRM 4.1 0 All Added ASME AG-1 ,2009 as a reference. Changes made to reflect the changes in the control room emergency filtration system. I I I I TRM 4.1 2 4.1 2-1, 5, Revised sulfur specification in accordance with the 201 1 6 Wisconsin Air Pollution Control Construction Permit. 06/04/11 TRM 4.1 8 All New TRM chapter for the control room envelope habitability program. Page 2 of 2}}

Revision as of 03:16, 18 September 2018