ML12334A664: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 13: | Line 13: | ||
| document type = Legal-Exhibit | | document type = Legal-Exhibit | ||
| page count = 16 | | page count = 16 | ||
| project = | |||
| stage = RAI | |||
}} | }} | ||
Line 38: | Line 40: | ||
As stated cc w/encl: Distribution via Listserv Sincerely, Kimberly J. Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION RAI 3.0.3.1.2-1 BACKGROUND In light of Operating Experience (OE) that has occurred coincident with and after the U.S. Nuclear Regulatory Commission (NRC or the staff) evaluation of the Indian Point License Renewal Application (LRA) and issuance of the Safety Evaluation Report (SER), the staff is concerned about the continued susceptibility to failure of buried (Le., piping in direct contact with soil) and/or underground piping (Le., piping not in direct contact with soil, but located below grade in a vault, pipe chase, or other structure where it is exposed to air and where access is limited) that is within the scope of Title 10 of the Code of Federal Regulations (10 CFR) 54.4 and subject to aging management for license renewal. The staff reviewed the LRA, SER and a letter dated July 27,2009, from the applicant addressing buried pipe program modifications as a result of recent site operating experience. | As stated cc w/encl: Distribution via Listserv Sincerely, Kimberly J. Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION RAI 3.0.3.1.2-1 BACKGROUND In light of Operating Experience (OE) that has occurred coincident with and after the U.S. Nuclear Regulatory Commission (NRC or the staff) evaluation of the Indian Point License Renewal Application (LRA) and issuance of the Safety Evaluation Report (SER), the staff is concerned about the continued susceptibility to failure of buried (Le., piping in direct contact with soil) and/or underground piping (Le., piping not in direct contact with soil, but located below grade in a vault, pipe chase, or other structure where it is exposed to air and where access is limited) that is within the scope of Title 10 of the Code of Federal Regulations (10 CFR) 54.4 and subject to aging management for license renewal. The staff reviewed the LRA, SER and a letter dated July 27,2009, from the applicant addressing buried pipe program modifications as a result of recent site operating experience. | ||
Based on the review of these documents subsequent to the recent industry OE, the staff does not have enough information to evaluate how Indian Point is implementing changes to their program based on the industry experience. | Based on the review of these documents subsequent to the recent industry OE, the staff does not have enough information to evaluate how Indian Point is implementing changes to their program based on the industry experience. | ||
ISSUE 1. The LRA and supplemental material did not contain enough specifics on the planned inspections for the staff to determine if the inspections would be adequate to manage the aging effect for all types/materials of in-scope buried pipes [e.g., safety/code class and potential to release materials detrimental to the environment (e.g., diesel fuel and radioisotopes that exceed Environmental Protection Agency drinking water standards)]. | ISSUE 1. The LRA and supplemental material did not contain enough specifics on the planned inspections for the staff to determine if the inspections would be adequate to manage the aging effect for all types/materials of in-scope buried pipes [e.g., safety/code class and potential to release materials detrimental to the environment (e.g., diesel fuel and radioisotopes that exceed Environmental Protection Agency drinking water standards)]. | ||
: 2. The staff believes that buried coated steel piping is more susceptible to potential failure if it is not protected by a cathodic protection system unless soil resistivity is greater than 20,000 ohm-cm. 3. The LRA and supplemental material did not contain enough specifics for the staff to understand the general condition of the backfill used in the vicinity of buried in-scope piping. 4. In a letter dated July 27, 2009, the applicant stated that it will employ qualified inspection methods with demonstrated effectiveness for detection of aging effects during the period of extended operation. | : 2. The staff believes that buried coated steel piping is more susceptible to potential failure if it is not protected by a cathodic protection system unless soil resistivity is greater than 20,000 ohm-cm. 3. The LRA and supplemental material did not contain enough specifics for the staff to understand the general condition of the backfill used in the vicinity of buried in-scope piping. 4. In a letter dated July 27, 2009, the applicant stated that it will employ qualified inspection methods with demonstrated effectiveness for detection of aging effects during the period of extended operation. | ||
The staff acknowledges that where examining buried pipe from the exterior surface is not possible due to plant configuration (e.g., the piping is located underneath foundations) it is reasonable to substitute a volumetric examination from the interior of the pipe provided the surface is properly prepared. | The staff acknowledges that where examining buried pipe from the exterior surface is not possible due to plant configuration (e.g., the piping is located underneath foundations) it is reasonable to substitute a volumetric examination from the interior of the pipe provided the surface is properly prepared. | ||
However, beyond ultrasonic techniques, the staff is not aware of another reliable volumetric inspection methodology that is suitable for inspecting buried in-scope piping. This is particularly true, in light of industry experience, with guided wave ultrasonic technology. | However, beyond ultrasonic techniques, the staff is not aware of another reliable volumetric inspection methodology that is suitable for inspecting buried in-scope piping. This is particularly true, in light of industry experience, with guided wave ultrasonic technology. | ||
ENCLOSURE 2-5. Based on a review of the LRA and UFSAR, it is not clear to the staff what in-scope systems (if any) have underground piping or if such piping will receive inspections consistent with the program described in External Surfaces Monitoring Program. 6. LRA Sections A.2.1.5 and A.3.1.5 states that corrosion risk will be determined through consideration of material, soil resistivity, drainage, presence of cathodic protection and type of coating. Given that cathodic protection has not been installed for all buried in-scope piping, the staff lacks sufficient information to conclude that the applicant's evaluation of soil corrosivity will provide reasonable assurance that in-scope buried piping will meet its intended license renewal function(s). | ENCLOSURE 2-5. Based on a review of the LRA and UFSAR, it is not clear to the staff what in-scope systems (if any) have underground piping or if such piping will receive inspections consistent with the program described in External Surfaces Monitoring Program. 6. LRA Sections A.2.1.5 and A.3.1.5 states that corrosion risk will be determined through consideration of material, soil resistivity, drainage, presence of cathodic protection and type of coating. Given that cathodic protection has not been installed for all buried in-scope piping, the staff lacks sufficient information to conclude that the applicant's evaluation of soil corrosivity will provide reasonable assurance that in-scope buried piping will meet its intended license renewal function(s). | ||
Specifically, the staff is concerned with the following: | Specifically, the staff is concerned with the following: | ||
: a. While the applicant stated that it will include consideration of soil resistivity and drainage, it did not state that other important soil parameters would be included such as, pH, chlorides, redox potential, sulfates and sulfides. | : a. While the applicant stated that it will include consideration of soil resistivity and drainage, it did not state that other important soil parameters would be included such as, pH, chlorides, redox potential, sulfates and sulfides. | ||
: b. The applicant did not state how often it witl conduct testing of localized soil conditions, nor provide the specific locations relative to buried in-scope piping that is not cathodically protected. | : b. The applicant did not state how often it witl conduct testing of localized soil conditions, nor provide the specific locations relative to buried in-scope piping that is not cathodically protected. | ||
: c. The applicant did not state how they would integrate the various soil parameters into an assessment of corrosivity of the soil, such as using "Assessment of Overall Soil Corrosivity to Steel,,,1 or AWWA C1 05 2. d. The applicant did not specifically state how localized soil data will be factored into increased inspections, including the specific increase in the number of committed inspections by material type and location. | : c. The applicant did not state how they would integrate the various soil parameters into an assessment of corrosivity of the soil, such as using "Assessment of Overall Soil Corrosivity to Steel,,,1 or AWWA C1 05 2. d. The applicant did not specifically state how localized soil data will be factored into increased inspections, including the specific increase in the number of committed inspections by material type and location. | ||
REQUEST 1. Respond to the following: | REQUEST 1. Respond to the following: | ||
: a. Describe how many in-scope buried piping segments for each material, code/safety-related piping, and potential to release materials detrimental to the environment category will be inspected. | : a. Describe how many in-scope buried piping segments for each material, code/safety-related piping, and potential to release materials detrimental to the environment category will be inspected. | ||
: b. For the 45 planned inspections prior to the period of extended operation: | : b. For the 45 planned inspections prior to the period of extended operation: | ||
: i. How many will consist of an excavated direct visual inspection of the external surfaces of the buried pipe? ii. What length of piping will be excavated and have a direct visual inspection conducted? | : i. How many will consist of an excavated direct visual inspection of the external surfaces of the buried pipe? ii. What length of piping will be excavated and have a direct visual inspection conducted? | ||
1 Assessment of Overall Soil Corrosivity to Steel, CP. Dillon, Corrosion Control in the Chemical Process Industries, Second Edition, Materials Technology Institute of the Chemical Process Industries, Inc. and Washington Suburban Sanitary Commission. | 1 Assessment of Overall Soil Corrosivity to Steel, CP. Dillon, Corrosion Control in the Chemical Process Industries, Second Edition, Materials Technology Institute of the Chemical Process Industries, Inc. and Washington Suburban Sanitary Commission. | ||
2 ANSI/AWWA C105/A21.5, "Polyethylene Encasement for Ductile-Iron Pipe Systems." | 2 ANSI/AWWA C105/A21.5, "Polyethylene Encasement for Ductile-Iron Pipe Systems." | ||
3-c. Understanding that the total number of inspections performed will be informed by plant-specific and industry operating experience, what minimum number of inspections of buried in-scope piping is planned during the 40 -50 and 50 -60 year operating periods? When describing the minimum number of planned inspections, differentiate between material, code/safety-related piping, and potential to release materials detrimental to the environment category piping inspection quantities of buried in-scope piping. d. What specific inspections will be performed for the IP3 security generator propane tank and at what frequency? | 3-c. Understanding that the total number of inspections performed will be informed by plant-specific and industry operating experience, what minimum number of inspections of buried in-scope piping is planned during the 40 -50 and 50 -60 year operating periods? When describing the minimum number of planned inspections, differentiate between material, code/safety-related piping, and potential to release materials detrimental to the environment category piping inspection quantities of buried in-scope piping. d. What specific inspections will be performed for the IP3 security generator propane tank and at what frequency? | ||
: 2. Respond to the following: | : 2. Respond to the following: | ||
: a. Confirm at IP2 that the service water system and at IP3 that the service water suction piping are the only in-scope steel piping systems currently protected by a cathodic protection (CP) system. b. For those systems that are protected by a CP system: i. Has annual NACE survey testing been conducted, and if so, for how many years? ii. Have the output of the beds been trended, and if so, what are the results of the trending? | : a. Confirm at IP2 that the service water system and at IP3 that the service water suction piping are the only in-scope steel piping systems currently protected by a cathodic protection (CP) system. b. For those systems that are protected by a CP system: i. Has annual NACE survey testing been conducted, and if so, for how many years? ii. Have the output of the beds been trended, and if so, what are the results of the trending? | ||
iii. What is the availability of the cathodic protection system? c. For buried in-scope steel piping systems that are not cathodically protected: | iii. What is the availability of the cathodic protection system? c. For buried in-scope steel piping systems that are not cathodically protected: | ||
: i. Justify why this piping will continue to meet or exceed the minimum design wall thickness throughout the period of extended operation, assuming that no coatings are applied to the piping, or ii. Justify why the number of the planned inspections of this piping is sufficient to reasonably assure that this piping will continue to meet or exceed the minimum design wall thickness throughout the period of extended operation. | : i. Justify why this piping will continue to meet or exceed the minimum design wall thickness throughout the period of extended operation, assuming that no coatings are applied to the piping, or ii. Justify why the number of the planned inspections of this piping is sufficient to reasonably assure that this piping will continue to meet or exceed the minimum design wall thickness throughout the period of extended operation. | ||
: 3. Respond to the following: | : 3. Respond to the following: | ||
: a. Provide details on any further excavations conducted since July 2009 that provide insight on the extent of condition of the quality of the backfill in the vicinity of buried pipes. b. If there is no further information on the condition of the quality of backfill, justify why the planned inspections are adequate to detect potential degradation as a result of coating damage, particularly in steel buried pipe systems that are not protected by a CP system. 4. Respond to the following: | : a. Provide details on any further excavations conducted since July 2009 that provide insight on the extent of condition of the quality of the backfill in the vicinity of buried pipes. b. If there is no further information on the condition of the quality of backfill, justify why the planned inspections are adequate to detect potential degradation as a result of coating damage, particularly in steel buried pipe systems that are not protected by a CP system. 4. Respond to the following: | ||
: a. In absence of a qualified method, and until such time that one is demonstrated to be effective, what alternative inspection methods will Entergy employ when excavated direct visual examinations are not possible due to plant configuration. | : a. In absence of a qualified method, and until such time that one is demonstrated to be effective, what alternative inspection methods will Entergy employ when excavated direct visual examinations are not possible due to plant configuration. | ||
: b. Justify why the methods identified in response to request 4a will be effective at providing reasonable assurance that the buried in-scope piping systems will meet their current licensing basis function. | : b. Justify why the methods identified in response to request 4a will be effective at providing reasonable assurance that the buried in-scope piping systems will meet their current licensing basis function. | ||
: c. If a volumetric examination method is used, what percentage of interior axial length of the pipe will be inspected? | : c. If a volumetric examination method is used, what percentage of interior axial length of the pipe will be inspected? | ||
: 5. For in-scope underground piping, respond to the following: | : 5. For in-scope underground piping, respond to the following: | ||
: a. State what systems have underground piping and indicate the corresponding length of piping. b. State how often and what quantity of underground piping for each system will be inspected by an aging management program (AMP), and indicate which AMP will be used. 6. Respond to the following for buried in-scope steel piping without cathodic protection: | : a. State what systems have underground piping and indicate the corresponding length of piping. b. State how often and what quantity of underground piping for each system will be inspected by an aging management program (AMP), and indicate which AMP will be used. 6. Respond to the following for buried in-scope steel piping without cathodic protection: | ||
: a. State what soil parameters will be included in the analysis of soil corrosivity beyond soil resistivity and drainage. | : a. State what soil parameters will be included in the analysis of soil corrosivity beyond soil resistivity and drainage. | ||
: b. State how often soil sampling will be conducted and in what locations. | : b. State how often soil sampling will be conducted and in what locations. | ||
: c. State how the various soil parameters will be integrated into an assessment of the corrosivity of the soil. d. State how localized soil conditions will be factored into increased inspections, including the specific increase in the number of committed inspections by material type and location. | : c. State how the various soil parameters will be integrated into an assessment of the corrosivity of the soil. d. State how localized soil conditions will be factored into increased inspections, including the specific increase in the number of committed inspections by material type and location. | ||
RAJ 3.0.3.1.6-1 BACKGROUND NUREG-1801, Rev. 1, "Generic Aging Lessons Learned (GALL) Report," (the GALL Report) addresses inaccessible medium-voltage cables in Aging Management Program XI.E3, "Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements." The purpose of this program is to provide reasonable assurance that the intended functions of inaccessible medium-voltage cables (2 kV to 35 kV), that are not subject to environmental qualification requirements of 10 CFR 50.49 and are exposed to adverse localized environments caused by moisture while energized, will be maintained consistent with the current licensing basis. The scope of the program applies to inaccessible (in conduits, cable trenches, cable troughs, duct banks, underground vaults or direct buried installations) medium-voltage cables within the scope of license renewal that are subject to significant moisture simultaneously with significant voltage. The application of GALL Report AMP XI. E3 to medium-voltage cables was based on the operating experience available at the time Revision 1 of the GALL Report was developed. | RAJ 3.0.3.1.6-1 BACKGROUND NUREG-1801, Rev. 1, "Generic Aging Lessons Learned (GALL) Report," (the GALL Report) addresses inaccessible medium-voltage cables in Aging Management Program XI.E3, "Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements." The purpose of this program is to provide reasonable assurance that the intended functions of inaccessible medium-voltage cables (2 kV to 35 kV), that are not subject to environmental qualification requirements of 10 CFR 50.49 and are exposed to adverse localized environments caused by moisture while energized, will be maintained consistent with the current licensing basis. The scope of the program applies to inaccessible (in conduits, cable trenches, cable troughs, duct banks, underground vaults or direct buried installations) medium-voltage cables within the scope of license renewal that are subject to significant moisture simultaneously with significant voltage. The application of GALL Report AMP XI. E3 to medium-voltage cables was based on the operating experience available at the time Revision 1 of the GALL Report was developed. | ||
Line 76: | Line 78: | ||
In addition, more frequent cable test and cable manhole inspection frequencies (e.g., from ten and two years to six and one year, respectively) should be evaluated to ensure that the Non-EQ Inaccessible Medium-Voltage Cable program test and inspection frequencies reflect industry and plant-specific operating experience and that test and inspection frequencies may be increased based on future industry and plant-specific operating experience. | In addition, more frequent cable test and cable manhole inspection frequencies (e.g., from ten and two years to six and one year, respectively) should be evaluated to ensure that the Non-EQ Inaccessible Medium-Voltage Cable program test and inspection frequencies reflect industry and plant-specific operating experience and that test and inspection frequencies may be increased based on future industry and plant-specific operating experience. | ||
REQUEST Provide a summary of your evaluation of recently identified industry operating experience and any plant-specific operating experience concerning inaccessible low voltage power cable failures within the scope of license renewal (not subject to 10 CFR 50.49 environmental qualification requirements), and how this operating experience applies to the need for additional aging management activities at your plant for such cables. 1. Explain how Entergy will manage the effects of aging on inaccessible low voltage power cables within the scope of license renewal and subject to aging management review; with consideration of recently identified industry operating experience and any specific operating experience. | REQUEST Provide a summary of your evaluation of recently identified industry operating experience and any plant-specific operating experience concerning inaccessible low voltage power cable failures within the scope of license renewal (not subject to 10 CFR 50.49 environmental qualification requirements), and how this operating experience applies to the need for additional aging management activities at your plant for such cables. 1. Explain how Entergy will manage the effects of aging on inaccessible low voltage power cables within the scope of license renewal and subject to aging management review; with consideration of recently identified industry operating experience and any specific operating experience. | ||
The discussion should include assessment of your aging management program description, program elements (Le., Scope of Program. Parameters Monitored/Inspected, Detection of Aging Effects, and Corrective Actions), and FSAR summary description to demonstrate reasonable assurance that the intended functions of inaccessible low voltage power cables subject to adverse localized environments will be maintained consistent with the current licensing basis through the period of extended operation. | The discussion should include assessment of your aging management program description, program elements (Le., Scope of Program. Parameters Monitored/Inspected, Detection of Aging Effects, and Corrective Actions), and FSAR summary description to demonstrate reasonable assurance that the intended functions of inaccessible low voltage power cables subject to adverse localized environments will be maintained consistent with the current licensing basis through the period of extended operation. | ||
: 2. Provide an evaluation showing that the proposed Non-EO Inaccessible Medium-Voltage Cable Program test and inspection frequencies, including event-driven inspections, incorporate recent industry and plant-specific operating experience for both inaccessible low and medium voltage cable. 3. In Commitment | : 2. Provide an evaluation showing that the proposed Non-EO Inaccessible Medium-Voltage Cable Program test and inspection frequencies, including event-driven inspections, incorporate recent industry and plant-specific operating experience for both inaccessible low and medium voltage cable. 3. In Commitment | ||
: 40. Entergy committed to evaluate plant-specific and industry operating experience prior to entering the period of extended operation. | : 40. Entergy committed to evaluate plant-specific and industry operating experience prior to entering the period of extended operation. | ||
Explain how the proposed Non-EO Inaccessible Medium-Voltage Program will continue to ensure that future industry and plant-specific operating experience will be incorporated into the program such that inspection and test frequencies may be increased based on test and inspection results. RAI3.0.3.1.10-1 BACKGROUND By letter dated July 26. 2010, the applicant provided clarification of LRA Section B.1.28, "One Time Inspection | Explain how the proposed Non-EO Inaccessible Medium-Voltage Program will continue to ensure that future industry and plant-specific operating experience will be incorporated into the program such that inspection and test frequencies may be increased based on test and inspection results. RAI3.0.3.1.10-1 BACKGROUND By letter dated July 26. 2010, the applicant provided clarification of LRA Section B.1.28, "One Time Inspection | ||
Line 94: | Line 96: | ||
If the acceptance criteria in ACI 349.3R are not used, the plant-specific criteria should be described and a technical basis for deviation from ACI 349.3R should be provided. | If the acceptance criteria in ACI 349.3R are not used, the plant-specific criteria should be described and a technical basis for deviation from ACI 349.3R should be provided. | ||
ISSUE The LRA did not clearly identify quantitative acceptance criteria for the Structures Monitoring Program inspections. | ISSUE The LRA did not clearly identify quantitative acceptance criteria for the Structures Monitoring Program inspections. | ||
REQUEST 1. Provide the quantitative acceptance criteria for the Structures Monitoring Program. If the criteria deviate from those discussed in ACI 349.3R, provide technical justification for the differences. | REQUEST 1. Provide the quantitative acceptance criteria for the Structures Monitoring Program. If the criteria deviate from those discussed in ACI 349.3R, provide technical justification for the differences. | ||
: 2. If quantitative acceptance criteria will be added to the program as an enhancement, state whether Entergy plans to conduct an inspection with the quantitative acceptance criteria prior to the period of extended operation. | : 2. If quantitative acceptance criteria will be added to the program as an enhancement, state whether Entergy plans to conduct an inspection with the quantitative acceptance criteria prior to the period of extended operation. | ||
If there are no plans to conduct an inspection with quantitative acceptance criteria prior to entering the period of extended operation, explain how Entergy plans to monitor and trend data. RAI 3.1.2.2.13-1 BACKGROUND SRP-LR Section 3.1.2.2.13 identifies that cracking due to primary water stress corrosion cracking (PWSCC) could occur in PWR components made of nickel alloy and steel with nickel alloy cladding, including reactor coolant pressure boundary components and penetrations inside the RCS such as pressurizer heater sheathes and sleeves, nozzles, and other internal components. | If there are no plans to conduct an inspection with quantitative acceptance criteria prior to entering the period of extended operation, explain how Entergy plans to monitor and trend data. RAI 3.1.2.2.13-1 BACKGROUND SRP-LR Section 3.1.2.2.13 identifies that cracking due to primary water stress corrosion cracking (PWSCC) could occur in PWR components made of nickel alloy and steel with nickel alloy cladding, including reactor coolant pressure boundary components and penetrations inside the RCS such as pressurizer heater sheathes and sleeves, nozzles, and other internal components. | ||
Line 105: | Line 107: | ||
Therefore, the staff noted that the Water Chemistry Control -Primary and Secondary Program may not be effective in managing the aging effect of cracking due to PWSCC in SG divider plate assemblies. | Therefore, the staff noted that the Water Chemistry Control -Primary and Secondary Program may not be effective in managing the aging effect of cracking due to PWSCC in SG divider plate assemblies. | ||
Although these SG divider plate assembly cracks may not have a significant safety impact in and of themselves, such cracks could affect adjacent items that are part of the reactor coolant pressure boundary (RCPB), such as the tubesheet and the channel head, if they propagate to the boundary with these items. For the tubesheet. | Although these SG divider plate assembly cracks may not have a significant safety impact in and of themselves, such cracks could affect adjacent items that are part of the reactor coolant pressure boundary (RCPB), such as the tubesheet and the channel head, if they propagate to the boundary with these items. For the tubesheet. | ||
PWSCC cracks in the divider plate could propagate to the tubesheet cladding with possible consequences to the integrity of the tube-to-tubesheet welds. For the channel head, the PWSCC cracks in the divider plate could propagate to the SG triple point and potentially affect the pressure boundary of the SG channel head. REQUEST 1. Discuss the materials of construction of the Units 2 and 3 SG divider plate assemblies, including the welds within these assemblies and to the channel head and to the tubesheet. | PWSCC cracks in the divider plate could propagate to the tubesheet cladding with possible consequences to the integrity of the tube-to-tubesheet welds. For the channel head, the PWSCC cracks in the divider plate could propagate to the SG triple point and potentially affect the pressure boundary of the SG channel head. REQUEST 1. Discuss the materials of construction of the Units 2 and 3 SG divider plate assemblies, including the welds within these assemblies and to the channel head and to the tubesheet. | ||
: 2. If any constitutive/weld material of the SG divider plate assemblies is susceptible to cracking (e.g., Alloy 600 or the associated Alloy 600 weld materials). | : 2. If any constitutive/weld material of the SG divider plate assemblies is susceptible to cracking (e.g., Alloy 600 or the associated Alloy 600 weld materials). | ||
explain how Entergy plans to manage PWSCC of the SG divider plate assemblies to prevent the propagation of cracks into other items that are part of the RCPB, whereby it challenges the integrity of the adjacent items. RAI3.1.2.2.16-1 BACKGROUND SRP-LR Section 3.1.2.2.16 identifies that cracking due to PWSCC could occur on the primary coolant side of PWR steel SG tube-to-tubesheet welds made or clad with nickel alloy. The GALL Report recommends ASME Section XI lSI and control of water chemistry to manage this aging effect and recommends no further aging management review for PWSCC of nickel alloy if the applicant complies with applicable NRC Orders and provides a commitment in the FSAR supplement to implement applicable (1) Bulletins and Generic Letters and (2) staff-accepted industry guidelines. | explain how Entergy plans to manage PWSCC of the SG divider plate assemblies to prevent the propagation of cracks into other items that are part of the RCPB, whereby it challenges the integrity of the adjacent items. RAI3.1.2.2.16-1 BACKGROUND SRP-LR Section 3.1.2.2.16 identifies that cracking due to PWSCC could occur on the primary coolant side of PWR steel SG tube-to-tubesheet welds made or clad with nickel alloy. The GALL Report recommends ASME Section XI lSI and control of water chemistry to manage this aging effect and recommends no further aging management review for PWSCC of nickel alloy if the applicant complies with applicable NRC Orders and provides a commitment in the FSAR supplement to implement applicable (1) Bulletins and Generic Letters and (2) staff-accepted industry guidelines. | ||
Line 114: | Line 116: | ||
1 b. If the SGs do not have permanently approved alternate repair criteria, justify how your Steam Generator Integrity Program is capable to manage PWSCC in tube-to-tubesheet welds, or provide a plant-specific AMP that will complement the primary water chemistry program, in order to verify the effectiveness of the primary water chemistry program and ensure that cracking due to PWSCC is not occurring in tube-to-tubesheet welds. 2. For Unit 3 SGs tube-to-tubesheet welds, justify how your Steam Generator Integrity Program is capable to manage PWSCC in tube-to-tubesheet welds, or provide either a plant-specific AMP that will complement the primary water chemistry program, in order to verify the effectiveness of the primary water chemistry program and ensure that cracking due to PWSCC is not occurring in tube-to-tubesheet welds, or a rationale for why such a program is not needed. RAI RCS-3 BACKGROUND In LRA Section 4.3.3 and Commitment 33 (as amended by the letter dated January 22, 2008) the applicant discussed the methodology used to determine the locations that required environmentally-assisted fatigue analyses consistent with NUREG/CR-6260, "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." The staff recognized that, in LRA Tables 4.3-13 and 4.3-14, there are eight plant-specific locations listed based on the six generic components identified in NUREG/CR-6260. | 1 b. If the SGs do not have permanently approved alternate repair criteria, justify how your Steam Generator Integrity Program is capable to manage PWSCC in tube-to-tubesheet welds, or provide a plant-specific AMP that will complement the primary water chemistry program, in order to verify the effectiveness of the primary water chemistry program and ensure that cracking due to PWSCC is not occurring in tube-to-tubesheet welds. 2. For Unit 3 SGs tube-to-tubesheet welds, justify how your Steam Generator Integrity Program is capable to manage PWSCC in tube-to-tubesheet welds, or provide either a plant-specific AMP that will complement the primary water chemistry program, in order to verify the effectiveness of the primary water chemistry program and ensure that cracking due to PWSCC is not occurring in tube-to-tubesheet welds, or a rationale for why such a program is not needed. RAI RCS-3 BACKGROUND In LRA Section 4.3.3 and Commitment 33 (as amended by the letter dated January 22, 2008) the applicant discussed the methodology used to determine the locations that required environmentally-assisted fatigue analyses consistent with NUREG/CR-6260, "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." The staff recognized that, in LRA Tables 4.3-13 and 4.3-14, there are eight plant-specific locations listed based on the six generic components identified in NUREG/CR-6260. | ||
The applicant also discussed in LRA Tables 4.3-13 and 4.3-14 that the surge line nozzle in the RCS piping is bounded by the surge line piping to safe end weld at the pressurizer nozzle. LRA Section 4.3.3 and Commitment 33 were amended as follow: | The applicant also discussed in LRA Tables 4.3-13 and 4.3-14 that the surge line nozzle in the RCS piping is bounded by the surge line piping to safe end weld at the pressurizer nozzle. LRA Section 4.3.3 and Commitment 33 were amended as follow: | ||
ISSUE At least 2 years prior to entering the period of extended operation, for the locations identified in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), under the Fatigue Monitoring Program, IP2 and IP3, IPEC will implement one or more of the following: | ISSUE At least 2 years prior to entering the period of extended operation, for the locations identified in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), under the Fatigue Monitoring Program, IP2 and IP3, IPEC will implement one or more of the following: | ||
(1) Consistent with the Fatigue Monitoring Program, Detection of Aging Effects, update the fatigue usage calculations using refined fatigue analyses to determine valid CUFs less than 1.0 when accounting for the effects of reactor water environment. | (1) Consistent with the Fatigue Monitoring Program, Detection of Aging Effects, update the fatigue usage calculations using refined fatigue analyses to determine valid CUFs less than 1.0 when accounting for the effects of reactor water environment. | ||
This includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following. | This includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following. | ||
Line 123: | Line 125: | ||
However, it is only one of the options that may be taken. Furthermore, the limiting locations may be added and the staff is concerned whether the applicant is committed to verify that the plant-specific locations per NUREG/CR-6260 are bounding for the generic NUREG/CR-6260 components. | However, it is only one of the options that may be taken. Furthermore, the limiting locations may be added and the staff is concerned whether the applicant is committed to verify that the plant-specific locations per NUREG/CR-6260 are bounding for the generic NUREG/CR-6260 components. | ||
Second, the staff noted that the applicant's plant-specific configuration may contain locations that should be analyzed for the effects of reactor coolant environment, that are more limiting than those identified in NUREG/CR-6260. | Second, the staff noted that the applicant's plant-specific configuration may contain locations that should be analyzed for the effects of reactor coolant environment, that are more limiting than those identified in NUREG/CR-6260. | ||
This may include locations that are limiting or bounding for a particular plant-specific configuration or that have calculated CUF values that are greater when compared to the locations identified in NUREG/CR-6260. REQUEST 1. Confirm and justify that the plant-specific locations listed in LRA Tables 4.3-13 and 4.3-14 are bounding for the generic NUREG/CR-6260 components. | This may include locations that are limiting or bounding for a particular plant-specific configuration or that have calculated CUF values that are greater when compared to the locations identified in NUREG/CR-6260. REQUEST 1. Confirm and justify that the plant-specific locations listed in LRA Tables 4.3-13 and 4.3-14 are bounding for the generic NUREG/CR-6260 components. | ||
: 2. Confirm and justify that the locations selected for environmentally-assisted fatigue analyses in LRA Tables 4.3-13 and 4.3-14 consist of the most limiting locations for the plant (beyond the generiC components identified in the NUREG/CR-6260 guidance). | : 2. Confirm and justify that the locations selected for environmentally-assisted fatigue analyses in LRA Tables 4.3-13 and 4.3-14 consist of the most limiting locations for the plant (beyond the generiC components identified in the NUREG/CR-6260 guidance). | ||
If these locations are not bounding, clarify which locations require an environmentally-assisted fatigue analysiS and the actions that will be taken for these additional locations. | If these locations are not bounding, clarify which locations require an environmentally-assisted fatigue analysiS and the actions that will be taken for these additional locations. |
Revision as of 02:40, 29 April 2019
ML12334A664 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 02/10/2011 |
From: | Green K J License Renewal Projects Branch 2 |
To: | Entergy Nuclear Operations, Atomic Safety and Licensing Board Panel |
SECY RAS | |
References | |
RAS 21546, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
Download: ML12334A664 (16) | |
Text
United States Nuclear Regulatory Commission Official Hearing Exhibit In the Matter of
- Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3)
ASLBP #:07-858-03-LR-BD01 Docket #:05000247 l 05000286 Exhibit #:
Identified:
Admitted: Withdrawn:
Rejected: Stricken: Other: NYS000150-00-BD01 10/15/2012 10/15/2012 NYS000150 Submitted: December 15, 2011
""tP-f'REGU(.q" 0 " : i Y'1J.: 0' ? '" .. ** ** UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 Vice President, Operations Entergy Nuclear Operations, Inc. I ndian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 February 10, 2011
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3, LICENSE RENEWAL APPLICATION
Dear Sir or Madam:
By letter dated April 23,2007, as supplemented by letters dated May 3,2007, and June 21 2007, Entergy Nuclear Operations, Inc., (Entergy) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear Regulatory Commission (NRC or the staff). The staff documented its findings in the Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3 which was issued in August 2009. Since the issuance of the safety evaluation report, the staff has identified the need for additional information with respect to certain aging management programs based on lessons learned from past LRAs and recent industry operating experience.
Additionally, the staff has identified issues that need additional clarification for the license renewal application.
Therefore, the staff requests additional information as described in the enclosure.
Items in the enclosure were discussed with Mr. Robert Walpole, and a mutually agreeable date for the response is within 45 days from the date of this letter. If you have any questions, please contact me at 301-415-1627, or via e-mail at Kimberly.Green@nrc.gov.
Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc w/encl: Distribution via Listserv Sincerely, Kimberly J. Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3 LICENSE RENEWAL APPLICATION REQUEST FOR ADDITIONAL INFORMATION RAI 3.0.3.1.2-1 BACKGROUND In light of Operating Experience (OE) that has occurred coincident with and after the U.S. Nuclear Regulatory Commission (NRC or the staff) evaluation of the Indian Point License Renewal Application (LRA) and issuance of the Safety Evaluation Report (SER), the staff is concerned about the continued susceptibility to failure of buried (Le., piping in direct contact with soil) and/or underground piping (Le., piping not in direct contact with soil, but located below grade in a vault, pipe chase, or other structure where it is exposed to air and where access is limited) that is within the scope of Title 10 of the Code of Federal Regulations (10 CFR) 54.4 and subject to aging management for license renewal. The staff reviewed the LRA, SER and a letter dated July 27,2009, from the applicant addressing buried pipe program modifications as a result of recent site operating experience.
Based on the review of these documents subsequent to the recent industry OE, the staff does not have enough information to evaluate how Indian Point is implementing changes to their program based on the industry experience.
ISSUE 1. The LRA and supplemental material did not contain enough specifics on the planned inspections for the staff to determine if the inspections would be adequate to manage the aging effect for all types/materials of in-scope buried pipes [e.g., safety/code class and potential to release materials detrimental to the environment (e.g., diesel fuel and radioisotopes that exceed Environmental Protection Agency drinking water standards)].
- 2. The staff believes that buried coated steel piping is more susceptible to potential failure if it is not protected by a cathodic protection system unless soil resistivity is greater than 20,000 ohm-cm. 3. The LRA and supplemental material did not contain enough specifics for the staff to understand the general condition of the backfill used in the vicinity of buried in-scope piping. 4. In a letter dated July 27, 2009, the applicant stated that it will employ qualified inspection methods with demonstrated effectiveness for detection of aging effects during the period of extended operation.
The staff acknowledges that where examining buried pipe from the exterior surface is not possible due to plant configuration (e.g., the piping is located underneath foundations) it is reasonable to substitute a volumetric examination from the interior of the pipe provided the surface is properly prepared.
However, beyond ultrasonic techniques, the staff is not aware of another reliable volumetric inspection methodology that is suitable for inspecting buried in-scope piping. This is particularly true, in light of industry experience, with guided wave ultrasonic technology.
ENCLOSURE 2-5. Based on a review of the LRA and UFSAR, it is not clear to the staff what in-scope systems (if any) have underground piping or if such piping will receive inspections consistent with the program described in External Surfaces Monitoring Program. 6. LRA Sections A.2.1.5 and A.3.1.5 states that corrosion risk will be determined through consideration of material, soil resistivity, drainage, presence of cathodic protection and type of coating. Given that cathodic protection has not been installed for all buried in-scope piping, the staff lacks sufficient information to conclude that the applicant's evaluation of soil corrosivity will provide reasonable assurance that in-scope buried piping will meet its intended license renewal function(s).
Specifically, the staff is concerned with the following:
- a. While the applicant stated that it will include consideration of soil resistivity and drainage, it did not state that other important soil parameters would be included such as, pH, chlorides, redox potential, sulfates and sulfides.
- b. The applicant did not state how often it witl conduct testing of localized soil conditions, nor provide the specific locations relative to buried in-scope piping that is not cathodically protected.
- c. The applicant did not state how they would integrate the various soil parameters into an assessment of corrosivity of the soil, such as using "Assessment of Overall Soil Corrosivity to Steel,,,1 or AWWA C1 05 2. d. The applicant did not specifically state how localized soil data will be factored into increased inspections, including the specific increase in the number of committed inspections by material type and location.
REQUEST 1. Respond to the following:
- a. Describe how many in-scope buried piping segments for each material, code/safety-related piping, and potential to release materials detrimental to the environment category will be inspected.
- b. For the 45 planned inspections prior to the period of extended operation:
- i. How many will consist of an excavated direct visual inspection of the external surfaces of the buried pipe? ii. What length of piping will be excavated and have a direct visual inspection conducted?
1 Assessment of Overall Soil Corrosivity to Steel, CP. Dillon, Corrosion Control in the Chemical Process Industries, Second Edition, Materials Technology Institute of the Chemical Process Industries, Inc. and Washington Suburban Sanitary Commission.
2 ANSI/AWWA C105/A21.5, "Polyethylene Encasement for Ductile-Iron Pipe Systems."
3-c. Understanding that the total number of inspections performed will be informed by plant-specific and industry operating experience, what minimum number of inspections of buried in-scope piping is planned during the 40 -50 and 50 -60 year operating periods? When describing the minimum number of planned inspections, differentiate between material, code/safety-related piping, and potential to release materials detrimental to the environment category piping inspection quantities of buried in-scope piping. d. What specific inspections will be performed for the IP3 security generator propane tank and at what frequency?
- 2. Respond to the following:
- a. Confirm at IP2 that the service water system and at IP3 that the service water suction piping are the only in-scope steel piping systems currently protected by a cathodic protection (CP) system. b. For those systems that are protected by a CP system: i. Has annual NACE survey testing been conducted, and if so, for how many years? ii. Have the output of the beds been trended, and if so, what are the results of the trending?
iii. What is the availability of the cathodic protection system? c. For buried in-scope steel piping systems that are not cathodically protected:
- i. Justify why this piping will continue to meet or exceed the minimum design wall thickness throughout the period of extended operation, assuming that no coatings are applied to the piping, or ii. Justify why the number of the planned inspections of this piping is sufficient to reasonably assure that this piping will continue to meet or exceed the minimum design wall thickness throughout the period of extended operation.
- 3. Respond to the following:
- a. Provide details on any further excavations conducted since July 2009 that provide insight on the extent of condition of the quality of the backfill in the vicinity of buried pipes. b. If there is no further information on the condition of the quality of backfill, justify why the planned inspections are adequate to detect potential degradation as a result of coating damage, particularly in steel buried pipe systems that are not protected by a CP system. 4. Respond to the following:
- a. In absence of a qualified method, and until such time that one is demonstrated to be effective, what alternative inspection methods will Entergy employ when excavated direct visual examinations are not possible due to plant configuration.
- b. Justify why the methods identified in response to request 4a will be effective at providing reasonable assurance that the buried in-scope piping systems will meet their current licensing basis function.
- c. If a volumetric examination method is used, what percentage of interior axial length of the pipe will be inspected?
- 5. For in-scope underground piping, respond to the following:
- a. State what systems have underground piping and indicate the corresponding length of piping. b. State how often and what quantity of underground piping for each system will be inspected by an aging management program (AMP), and indicate which AMP will be used. 6. Respond to the following for buried in-scope steel piping without cathodic protection:
- a. State what soil parameters will be included in the analysis of soil corrosivity beyond soil resistivity and drainage.
- b. State how often soil sampling will be conducted and in what locations.
- c. State how the various soil parameters will be integrated into an assessment of the corrosivity of the soil. d. State how localized soil conditions will be factored into increased inspections, including the specific increase in the number of committed inspections by material type and location.
RAJ 3.0.3.1.6-1 BACKGROUND NUREG-1801, Rev. 1, "Generic Aging Lessons Learned (GALL) Report," (the GALL Report) addresses inaccessible medium-voltage cables in Aging Management Program XI.E3, "Inaccessible Medium Voltage Cables Not Subject to 10 CFR 50.49 Environmental Qualification Requirements." The purpose of this program is to provide reasonable assurance that the intended functions of inaccessible medium-voltage cables (2 kV to 35 kV), that are not subject to environmental qualification requirements of 10 CFR 50.49 and are exposed to adverse localized environments caused by moisture while energized, will be maintained consistent with the current licensing basis. The scope of the program applies to inaccessible (in conduits, cable trenches, cable troughs, duct banks, underground vaults or direct buried installations) medium-voltage cables within the scope of license renewal that are subject to significant moisture simultaneously with significant voltage. The application of GALL Report AMP XI. E3 to medium-voltage cables was based on the operating experience available at the time Revision 1 of the GALL Report was developed.
However, recently-identified industry operating experience indicates that the presence of water or moisture can be a contributing factor in inaccessible power cables failures at lower service voltages (480 V to 2 kV). Applicable operating experience was identified in licensee responses to Generic Letter (GL) 2007-01, "Inaccessible or Underground Power Cable Failures that Disable Accident Mitigation Systems or Cause Plant Transients," which included failures of power cable operating at service voltages of less than 2 kV where water was considered a contributing factor. Recently-identified industry operating experience provided by NRC licensees in response to GL 2007-01 has shown: (a) that there is an increasing trend of cable failures with length in service beginning in the 6 th through 10 th years of operation and, (b) that moisture intrusion is the predominant factor contributing to cable failure. The staff has determined, based on the review of the cable failure distribution, that an annual inspection of manholes and a cable test frequency of at least every six years is a conservative approach to ensuring the operability of power cables and, therefore, should be considered.
In addition, recently-identified industry operating experience has shown that some NRC licensees may experience cable manhole water intrusion events, such as flooding or heavy rain, that subjects cables within the scope of program for GALL Report AMP XI.E3 to significant moisture.
The staff has determined that event driven inspections of cable manholes, in addition to a one-year periodic inspection frequency, is a conservative approach and, therefore, should be considered.
ISSUE The staff has concluded, based on recently-identified industry operating experience concerning the failure of inaccessible low voltage power cables (480 V to 2 kV) in the presence of significant moisture, that these cables can potentially experience age related degradation.
The staff noted that the applicant's Inaccessible Medium-Voltage Cables Program does not address inaccessible low-voltage power cables [400 V (nominally 480 V) to 2 kV inclusive].
In addition, more frequent cable test and cable manhole inspection frequencies (e.g., from ten and two years to six and one year, respectively) should be evaluated to ensure that the Non-EQ Inaccessible Medium-Voltage Cable program test and inspection frequencies reflect industry and plant-specific operating experience and that test and inspection frequencies may be increased based on future industry and plant-specific operating experience.
REQUEST Provide a summary of your evaluation of recently identified industry operating experience and any plant-specific operating experience concerning inaccessible low voltage power cable failures within the scope of license renewal (not subject to 10 CFR 50.49 environmental qualification requirements), and how this operating experience applies to the need for additional aging management activities at your plant for such cables. 1. Explain how Entergy will manage the effects of aging on inaccessible low voltage power cables within the scope of license renewal and subject to aging management review; with consideration of recently identified industry operating experience and any specific operating experience.
The discussion should include assessment of your aging management program description, program elements (Le., Scope of Program. Parameters Monitored/Inspected, Detection of Aging Effects, and Corrective Actions), and FSAR summary description to demonstrate reasonable assurance that the intended functions of inaccessible low voltage power cables subject to adverse localized environments will be maintained consistent with the current licensing basis through the period of extended operation.
- 2. Provide an evaluation showing that the proposed Non-EO Inaccessible Medium-Voltage Cable Program test and inspection frequencies, including event-driven inspections, incorporate recent industry and plant-specific operating experience for both inaccessible low and medium voltage cable. 3. In Commitment
- 40. Entergy committed to evaluate plant-specific and industry operating experience prior to entering the period of extended operation.
Explain how the proposed Non-EO Inaccessible Medium-Voltage Program will continue to ensure that future industry and plant-specific operating experience will be incorporated into the program such that inspection and test frequencies may be increased based on test and inspection results. RAI3.0.3.1.10-1 BACKGROUND By letter dated July 26. 2010, the applicant provided clarification of LRA Section B.1.28, "One Time Inspection
-Small Bore Piping." The applicant stated that its Inservice Inspection (lSI) Program includes periodic volumetric examinations on ASME Code Class 1 small-bore socket welds. The applicant further stated that the inspection volume is in accordance with guidelines established in MRP-146 which recommends examination of the base metal one-half inch beyond the toe of the weld. The applicant also cited recent plant-specific operating experience in which leakage was detected in a Class 1 socket weld, and referenced the related Licensee Event Report (LER#2010-004-00).
The staff noted that the applicant did not provide information that supports its conclusion on the failure mechanism.
The staff noted that for IP2, the facility operating license (DPR-26) expires at midnight September 28,2013, and for IP3, the facility operating license (DPR-64) expires at midnight December 12, 2015. The staff further noted that both IP2 and IP3 will be in their 4th lSI interval upon entering the period of extended operation. ISSUE The staff noted that the inspections performed by its Inservice Inspection Program for ASME Code Class 1 small-bore socket welds only include the base metal, one-half inch beyond the toe of the weld. It is not clear to the staff how an inspection of the base metal, one-half inch beyond the toe of the weld, is capable of detecting cracking in the ASME Code Class 1 small-bore socket weld metal. REQUEST 1. Explain how Entergy will manage aging (i.e., cracking) in the weld metal of ASME Code Class 1 small-bore socket welds. 2. Clarify if the inspection volume selected for the proposed volumetric examinations of ASME Code Class 1 small-bore butt welds, performed by the One-Time Inspection
-Small-Bore Piping Program, includes the weld metal. If it does not include the weld metal, justify that the inspection volume is sufficient and capable of detecting cracking in the ASME Code Class 1 small-bore butt weld metal. 3. Based on the operating experience at Indian Point, justify that an aging management program that performs periodic volumetric inspections of the weld metal for ASME Code Class 1 small-bore socket and butt welds is not necessary.
In lieu of this justification, provide an aging management program that includes periodic volumetric inspections to manage cracking in small-bore piping and the associated weld metal (socket weld metal and butt weld metal). 4. Whether a one-time inspection program or periodic inspection program is selected, clarify the implementation schedule of the inspections for ASME Code Class 1 small-bore piping including the associated welds (socket welds and butt welds). RAI 3.0.3.1.10-2 BACKGROUND SRP-LR Section A.1.2.3.4 states that when sampling is used a basis should be provided for the inspection population and sample size. The "monitoring and trending" program element of GALL AMP XI.M35 recommends that the volumetric inspection should be performed at a sufficient number of locations to assure an adequate sample. Furthermore, this number, or sample size, will be based on susceptibility, inspectability, dose considerations, operating experience, and limiting locations of the total population of ASME Code Class 1 small-bore piping locations.
ISSUE The staff noted that the applicant did not provide its basis for the sample size that it selected.
Specifically, the weld populations and the sample size were not provided to the staff, therefore it is not clear to the staff what percentage of ASME Code Class 1 welds, both full penetration welds and socket welds, will be inspected.
It is also not clear to the staff if a sufficient number of locations will be selected to ensure an adequate sample. REQUEST Provide the total populations of ASME Code Class 1 small-bore butt welds and socket welds at Indian Point for each unit. Justify that the number of samples, for both butt welds and socket welds, is sufficient to ensure that an adequate sample is selected for inspections to be performed.
RAI3.0.3.2.10-1 BACKGROUND NRC staff has determined that masonry walls that are within the scope of license renewal should be visually examined at least every five years, with provisions for more frequent inspections in areas where significant loss of material or cracking is observed.
ISSUE The LRA did not discuss the inspection interval for in-scope masonry walls. REQUEST Provide the inspection interval for in-scope masonry walls. If the interval exceeds five years, clearly explain why and how the interval will ensure that there is no loss of intended function between inspections.
RAI 3.0.3.2.15-1 BACKGROUND NRC staff has determined that adequate acceptance criteria for the Structures Monitoring Program should include quantitative limits for characterizing degradation.
Chapter 5 of ACI 349.3R provides acceptable criteria for concrete structures.
If the acceptance criteria in ACI 349.3R are not used, the plant-specific criteria should be described and a technical basis for deviation from ACI 349.3R should be provided.
ISSUE The LRA did not clearly identify quantitative acceptance criteria for the Structures Monitoring Program inspections.
REQUEST 1. Provide the quantitative acceptance criteria for the Structures Monitoring Program. If the criteria deviate from those discussed in ACI 349.3R, provide technical justification for the differences.
- 2. If quantitative acceptance criteria will be added to the program as an enhancement, state whether Entergy plans to conduct an inspection with the quantitative acceptance criteria prior to the period of extended operation.
If there are no plans to conduct an inspection with quantitative acceptance criteria prior to entering the period of extended operation, explain how Entergy plans to monitor and trend data. RAI 3.1.2.2.13-1 BACKGROUND SRP-LR Section 3.1.2.2.13 identifies that cracking due to primary water stress corrosion cracking (PWSCC) could occur in PWR components made of nickel alloy and steel with nickel alloy cladding, including reactor coolant pressure boundary components and penetrations inside the RCS such as pressurizer heater sheathes and sleeves, nozzles, and other internal components.
GALL Report Volume 2, Item IV.D1-06, recommends Chapter XI.M2, "Water Chemistry," for PWR primary water to manage the aging effect of cracking in the nickel alloy steam generator (SG) divider plate exposed to reactor coolant. LRA Table 3.1.1, item 3.1.1-81, credits the Water Chemistry Control-Primary and Secondary Program to manage cracking due to PWSCC in nickel-alloy steam generator primary channel head divider plate exposed to reactor coolant in the steam generators, and LRA Table 3.1.1, item 3.1.1-82, indicates that the SG primary side divider plates are composed of nickel alloy. Unit 2 FSAR Section 4.2.2.3 and Table 4.2-1 describe the construction materials for the replacement Model 44F steam generators.
The staff noted that there is no information about the construction materials of the divider plate assembly for the Unit 2 steam generators.
Unit 3 FSAR Section 4.2.2 and Table 4.2-1 describe the construction materials for the replacement Model 44F steam generators.
The staff noted that there is no information about the construction materials of the divider plate assembly for the Unit 3 steam generators.
ISSUE In some foreign steam generators with a similar design to that of Indian Point Units 2 and 3 steam generators, extensive cracking due to PWSCC has been identified in SG divider plate assemblies made with Alloy 600, even with proper primary water chemistry.
Specifically, cracks have been detected in the stub runner, very close to the tubesheetlstub runner weld with depths of almost a third of the divider plate thickness.
Therefore, the staff noted that the Water Chemistry Control -Primary and Secondary Program may not be effective in managing the aging effect of cracking due to PWSCC in SG divider plate assemblies.
Although these SG divider plate assembly cracks may not have a significant safety impact in and of themselves, such cracks could affect adjacent items that are part of the reactor coolant pressure boundary (RCPB), such as the tubesheet and the channel head, if they propagate to the boundary with these items. For the tubesheet.
PWSCC cracks in the divider plate could propagate to the tubesheet cladding with possible consequences to the integrity of the tube-to-tubesheet welds. For the channel head, the PWSCC cracks in the divider plate could propagate to the SG triple point and potentially affect the pressure boundary of the SG channel head. REQUEST 1. Discuss the materials of construction of the Units 2 and 3 SG divider plate assemblies, including the welds within these assemblies and to the channel head and to the tubesheet.
- 2. If any constitutive/weld material of the SG divider plate assemblies is susceptible to cracking (e.g., Alloy 600 or the associated Alloy 600 weld materials).
explain how Entergy plans to manage PWSCC of the SG divider plate assemblies to prevent the propagation of cracks into other items that are part of the RCPB, whereby it challenges the integrity of the adjacent items. RAI3.1.2.2.16-1 BACKGROUND SRP-LR Section 3.1.2.2.16 identifies that cracking due to PWSCC could occur on the primary coolant side of PWR steel SG tube-to-tubesheet welds made or clad with nickel alloy. The GALL Report recommends ASME Section XI lSI and control of water chemistry to manage this aging effect and recommends no further aging management review for PWSCC of nickel alloy if the applicant complies with applicable NRC Orders and provides a commitment in the FSAR supplement to implement applicable (1) Bulletins and Generic Letters and (2) staff-accepted industry guidelines.
In GALL Report Revision 1, Volume 2, this aging effect is addressed in item IV.D2-4, applicable only to once-through SGs, but not to recirculating SGs. The staff noted that ASME Code Section XI does not require any inspection of the tubesheet welds. In addition, there are no NRC Orders or bulletins requiring examination of this weld. However, the staff's concern is that, if the tubesheet cladding is Alloy 600 or the associated Alloy 600 weld materials, the tube-to-tubesheet weld region may have insufficient Chromium content to prevent initiation of PWSCC. Similarly, this concern applies to SG tubes made from Alloy 690TT. Consequently, such a PWSCC crack initiated in this region, close to a tube, could propagate into/through the weld, causing a failure of the weld and of the reactor coolant pressure boundary, for both recirculating and once-through steam generators.
In LRA Table 3.1.1, item 3.1.1-35, the applicant stated that the corresponding GALL Report line applies to once-through steam generators and was used as a comparison for the steam generator tubesheets.
The applicant further stated that for the steel with nickel alloy clad steam generator tubesheets, cracking is managed by the Water Chemistry Control -Primary and Secondary and Steam Generator Integrity Programs. In LRA Section 2.3.1.4, the applicant described that the Unit 2 replacement Westinghouse Model 44 steam generator tubes are fabricated from Alloy 600TT and the Unit 3 replacement Westinghouse Model 44 steam generator tubes are fabricated from Alloy 690TT. The applicant also described that the tubesheet surfaces in contact with reactor coolant are clad with Inconel, and the tube-to-tubesheet joints are welded. ISSUE Unless the NRC has approved a redefinition of the pressure boundary in which the autogenous tube-to-tubesheet weld is no longer included, or the tubesheet cladding and welds are not susceptible to PWSCC, the staff considers that the effectiveness of the primary water chemistry program should be verified to ensure PWSCC cracking is not occurring.
Moreover, it is not clear to the staff how the Steam Generator Integrity Program wi" be able to manage PWSCC of the tubesheet cladding, including the tube-to-tubesheet welds. REQUEST 1 a. For Unit 2 SGs, clarify whether the tube-to-tubesheet welds are included in the RCPB or alternate repair criteria have been permanently approved.
1 b. If the SGs do not have permanently approved alternate repair criteria, justify how your Steam Generator Integrity Program is capable to manage PWSCC in tube-to-tubesheet welds, or provide a plant-specific AMP that will complement the primary water chemistry program, in order to verify the effectiveness of the primary water chemistry program and ensure that cracking due to PWSCC is not occurring in tube-to-tubesheet welds. 2. For Unit 3 SGs tube-to-tubesheet welds, justify how your Steam Generator Integrity Program is capable to manage PWSCC in tube-to-tubesheet welds, or provide either a plant-specific AMP that will complement the primary water chemistry program, in order to verify the effectiveness of the primary water chemistry program and ensure that cracking due to PWSCC is not occurring in tube-to-tubesheet welds, or a rationale for why such a program is not needed. RAI RCS-3 BACKGROUND In LRA Section 4.3.3 and Commitment 33 (as amended by the letter dated January 22, 2008) the applicant discussed the methodology used to determine the locations that required environmentally-assisted fatigue analyses consistent with NUREG/CR-6260, "Application of NUREG/CR-5999 Interim Fatigue Curves to Selected Nuclear Power Plant Components." The staff recognized that, in LRA Tables 4.3-13 and 4.3-14, there are eight plant-specific locations listed based on the six generic components identified in NUREG/CR-6260.
The applicant also discussed in LRA Tables 4.3-13 and 4.3-14 that the surge line nozzle in the RCS piping is bounded by the surge line piping to safe end weld at the pressurizer nozzle. LRA Section 4.3.3 and Commitment 33 were amended as follow:
ISSUE At least 2 years prior to entering the period of extended operation, for the locations identified in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3), under the Fatigue Monitoring Program, IP2 and IP3, IPEC will implement one or more of the following:
(1) Consistent with the Fatigue Monitoring Program, Detection of Aging Effects, update the fatigue usage calculations using refined fatigue analyses to determine valid CUFs less than 1.0 when accounting for the effects of reactor water environment.
This includes applying the appropriate Fen factors to valid CUFs determined in accordance with one of the following.
For locations in LRA Table 4.3-13 (IP2) and LRA Table 4.3-14 (IP3) with existing fatigue analysis valid for the period of extended operation, use the existing CUF. More plant-specific limiting locations with a valid CUF may be evaluated.
In particular, the pressurizer lower shell will be reviewed to ensure the surge nozzle remains the limiting component.
Representative CUF values from other plants, adjusted to or enveloping the IPEC plant-specific external loads may be used if demonstrated applicable to IPEC. An analYSis using an NRC-approved version of the ASME code or NRC-approved alternative (e.g., NRC-approved code case) may be performed to determine a valid CUF. GALL AMP X.M1 states the impact of the reactor coolant environment on a sample of critical components should include the locations identified in NUREG/CR-6260, as a minimum, and that additional locations may be needed. The staff identified two concerns regarding the applicant's environmentally-assisted fatigue analyses.
First, item (1) above LRA section and Commitment 33 indicated that more limiting plant-specific locations may be evaluated.
However, it is only one of the options that may be taken. Furthermore, the limiting locations may be added and the staff is concerned whether the applicant is committed to verify that the plant-specific locations per NUREG/CR-6260 are bounding for the generic NUREG/CR-6260 components.
Second, the staff noted that the applicant's plant-specific configuration may contain locations that should be analyzed for the effects of reactor coolant environment, that are more limiting than those identified in NUREG/CR-6260.
This may include locations that are limiting or bounding for a particular plant-specific configuration or that have calculated CUF values that are greater when compared to the locations identified in NUREG/CR-6260. REQUEST 1. Confirm and justify that the plant-specific locations listed in LRA Tables 4.3-13 and 4.3-14 are bounding for the generic NUREG/CR-6260 components.
- 2. Confirm and justify that the locations selected for environmentally-assisted fatigue analyses in LRA Tables 4.3-13 and 4.3-14 consist of the most limiting locations for the plant (beyond the generiC components identified in the NUREG/CR-6260 guidance).
If these locations are not bounding, clarify which locations require an environmentally-assisted fatigue analysiS and the actions that will be taken for these additional locations.
If the limiting locations identified consist of nickel alloy, state whether the methodology used to perform environmentally-assisted fatigue calculation for nickel alloy is consistent with NUREG/CR-6909.
If not, justify the method chosen.
Vice President, Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3, LICENSE RENEWAL APPLICATION
Dear Sir or Madam:
By letter dated April 23, 2007, as supplemented by letters dated May 3,2007, and June 21, 2007, Entergy Nuclear Operations, Inc., (Entergy) submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54, to renew the operating licenses for Indian Point Nuclear Generating Unit Nos. 2 and 3, for review by the U.S. Nuclear RegUlatory Commission (NRC or the staff). The staff documented its findings in the Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3 which was issued in August 2009. Since the issuance of the safety evaluation report, the staff has identified the need for additional information with respect to certain aging management programs based on lessons learned from past LRAs and recent industry operating experience.
Additionally, the staff has identified issues that need additional clarification for the license renewal application.
Therefore, the staff requests additional information as described in the enclosure.
Items in the enclosure were discussed with Mr. Robert Walpole, and a mutually agreeable date for the response is within 45 days from the date of this letter. If you have any questions, please contact me at 301-415-1627, or via e-mail at Kimberly.Green@nrc.gov.
Docket Nos. 50-247 and 50-286
Enclosure:
As stated cc w/encl: Distribution via Listserv DISTRIBUTION:
See next page ADAMS Accession Number: Ml110190809 Sincerely, IRA! Kimberly J. Green, Safety Project Manager Projects Branch 2 Division of License Renewal Office of Nuclear Reactor Regulation OFFICE LA: DLR PM: DLR/RPB2 Be: DLR/RPB2 PM: DLRlRPB2 NAME YEdmonds KGreen DWrona KGreen DATE 01/07/2011 02/07/2011 02/10/2011 02/10/2011 OFFICIAL RECORD COPY Letter to the Vice President of Operations from Kimberly J. Green dated February '10,2011
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THE INDIAN POINT NUCLEAR GENERATING UNIT NUMBERS 2 AND 3, LICENSE RENEWAL APPLICATION DISTRIBUTION:
HARDCOPY:
DLR R/F E-MAIL: PUBLIC [or NON-PUBLIC, if applicable]
RidsNrrDlr Resource RidsNrrDlrRpb1 Resource RidsNrrDlrRpb2 Resource RidsNrrDlrRarb Resource RidsNrrDlrRasb Resource RidsNrrDIrRapb Resource RidsNrrDlrRerb Resource RidsNrrDlrRpob Resource RidsOgcMailCenter Resource EDacus,OCA GMeyer, RI KGreen AStuyvenberg RConte, RI JBoska MKowal STurk,OGC SBurnell, OPA DMclntyre, OPA DScrenci, RI OPA NSheehan, RI OPA SBurnell,OPA PCataldo, RI NMcNamara, RI BWelling, RI ADias, RARB OAvegbusi, RI MCatts, RI PCataldo, RI MHalter, RI DJackson, RI BMizuno, OGC