ENS 41508: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/21/2005 10:45 EST
| event date = 03/21/2005 10:45 EST
| last update date = 03/21/2005
| last update date = 03/21/2005
| title = Offsite Notification To Derm About Fuel Oil Spill
| title = Offsite Notification to Derm About Fuel Oil Spill
| event text = On 3/21/05 at 1045, the Control Room was notified of a fuel oil spill.  The event was believed to have occurred on Saturday, 3/19/05 between 1900 and 0300.  The amount of fuel oil ( Grade 2 Diesel) that was spilled was approximately 219 gallons and dispersed over a distance of about 1 mile.  The cause of the spill was possibly due to a valve left open on the tanker after making a fuel delivery.  The long trail of oil was made as the tanker left the site.  The spill is contained and being cleaned up at this time.  The area will be excavated and transported to Redland Construction.
| event text = On 3/21/05 at 1045, the Control Room was notified of a fuel oil spill.  The event was believed to have occurred on Saturday, 3/19/05 between 1900 and 0300.  The amount of fuel oil ( Grade 2 Diesel) that was spilled was approximately 219 gallons and dispersed over a distance of about 1 mile.  The cause of the spill was possibly due to a valve left open on the tanker after making a fuel delivery.  The long trail of oil was made as the tanker left the site.  The spill is contained and being cleaned up at this time.  The area will be excavated and transported to Redland Construction.
The location of the fuel oil spill occurred outside of the Nuclear Plant protected area at the new fossil plant. Construction site.  
The location of the fuel oil spill occurred outside of the Nuclear Plant protected area at the new fossil plant. Construction site.  

Latest revision as of 22:21, 1 March 2018

ENS 41508 +/-
Where
Turkey Point NextEra Energy icon.png
Florida (NRC Region 2)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-3.42 h-0.143 days <br />-0.0204 weeks <br />-0.00468 months <br />)
Opened: Jim Russell
12:20 Mar 21, 2005
NRC Officer: Chauncey Gould
Last Updated: Mar 21, 2005
41508 - NRC Website
Loading map...