ENS 53522: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 17: Line 17:
| last update date = 07/24/2018
| last update date = 07/24/2018
| title = Unplanned Loss of Steam Line Monitor Channels
| title = Unplanned Loss of Steam Line Monitor Channels
| event text = The following event description is based on information currently available. If through subsequent reviews of this event additional information is identified that is pertinent to this event or alters the information being provided at this time a follow-up notification will be made via the ENS [Emergency Notification System] or under the reporting requirements of 10CFR50.73.
| event text = The following event description is based on information currently available. If through subsequent reviews of this event additional information is identified that is pertinent to this event or alters the information being provided at this time, a follow-up notification will be made via the ENS [Emergency Notification System] or under the reporting requirements of 10CFR50.73.
This event is being reported pursuant to 10CFR50.72(b)(3)(xiii) as a Loss of Emergency Preparedness Capabilities at Palo Verde Nuclear Generating Station (PVNGS) Unit 2. On July 23, 2018, at approximately 1631 Mountain Standard Time (MST), the Unit 2 control room experienced an unplanned loss of Steam Generator #1 steam line monitor (RU-139), channels A and B.
This event is being reported pursuant to 10CFR50.72(b)(3)(xiii) as a Loss of Emergency Preparedness Capabilities at Palo Verde Nuclear Generating Station (PVNGS) Unit 2. On July 23, 2018, at approximately 1631 Mountain Standard Time (MST), the Unit 2 control room experienced an unplanned loss of Steam Generator #1 steam line monitor (RU-139), channels A and B.
This monitor is used to assess dose projections for Main Steam line exhaust while in Modes 1-4 and is used in the PVNGS Emergency Plan to perform classification of Initiating Conditions 'RS1' and' RG1' and Emergency Action Levels (EALs) 'RS1.2' and 'RG1.2'. The PVNGS Emergency Plan does have two additional EALs that can be assessed for each Initiating Condition. The loss of this monitor constitutes a reportable loss of emergency assessment capability.
This monitor is used to assess dose projections for Main Steam line exhaust while in Modes 1-4 and is used in the PVNGS Emergency Plan to perform classification of Initiating Conditions 'RS1' and' RG1' and Emergency Action Levels (EALs) 'RS1.2' and 'RG1.2'. The PVNGS Emergency Plan does have two additional EALs that can be assessed for each Initiating Condition. The loss of this monitor constitutes a reportable loss of emergency assessment capability.
The NRC Resident Inspector has been informed of this condition."
The NRC Resident Inspector has been informed of this condition."
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20180724en.html#en53522
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2018/20180725en.html#en53522
}}{{unit info
}}{{unit info
| Unit =  2  
| Unit =  2  

Revision as of 07:30, 25 July 2018

ENS 53522 +/-
Where
Palo Verde Arizona Public Service icon.png
Arizona (NRC Region 4)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+17.95 h0.748 days <br />0.107 weeks <br />0.0246 months <br />)
Opened: Justin Gunther
00:57 Jul 24, 2018
NRC Officer: Vince Klco
Last Updated: Jul 24, 2018
53522 - NRC Website
Loading map...