ML12362A073: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
Line 2: Line 2:
| number = ML12362A073
| number = ML12362A073
| issue date = 11/05/2012
| issue date = 11/05/2012
| title = Donald C. Cook, Units 1 & 2, Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-113 Through C-156
| title = Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-113 Through C-156
| author name = Stoeva N
| author name = Stoeva N
| author affiliation = Stevenson & Associates
| author affiliation = Stevenson & Associates
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: iYj] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Ecuipment  
{{#Wiki_filter:DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: iYj] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Ecuipment


==
== Description:==
Description:==
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
: 9.
Do attached lines have adequate flexibility to avoid damage?
Yes
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-113
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-114
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB Equipment Class:
(20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion:
AB EMERGENCY DIESEL GENERATOR OME-150-A C-115
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: r N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-116


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL 7. Are soft targets free from impact by nearby equipment or structures?
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.:
Yes 9. Do attached lines have adequate flexibility to avoid damage?Yes 10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Other Adverse Conditions
1-DGAB Equipment Class:
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
(20) Instrumentation and Control Panels and Cabinets Equipment
Comments Evaluated by: George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-113 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-114 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion:
AB EMERGENCY DIESEL GENERATOR OME-150-A C-115 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: r N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-116 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment  


==
== Description:==
Description:==
AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL P9130239 P9130240 C-117


AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL P9130239 P9130240 C-117 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-YI N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets ioment Descriotion:
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-YI N U Seismic Walkdown Checklist (SWC)
AB EMERGENCY DIESEL GENERATOR OME-150-A C-118 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-119 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:
Equipment ID No.:
AB EMERGENCY DIESEL GENERATOR OME-150-AI C-120 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LIII N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-121 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LI] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB Equipment Class: (20) Instrumentation and Control Panels and Cabinets oment Descrintion:
1-DGAB Equipment Class:
AB EMERGENCY DIESEL GENERATOR OME-150-Al C-122 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters Equipment
(20) Instrumentation and Control Panels and Cabinets ioment Descriotion:
AB EMERGENCY DIESEL GENERATOR OME-150-A C-118


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
1-DGAB Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-119


AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:
AB EMERGENCY DIESEL GENERATOR OME-150-AI C-120
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LIII N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-121
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LI] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB Equipment Class:
(20) Instrumentation and Control Panels and Cabinets oment Descrintion:
AB EMERGENCY DIESEL GENERATOR OME-150-Al C-122
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB-INV Equipment Class:
(16) Inverters Equipment
 
== Description:==
AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 587.00 ft, 121 Manufacturer/Model:
AB1, 587.00 ft, 121 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
YSE 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
of SWEL items requiring such verification)?
Edge distance OK on bolts but looks small due to oversized washers underneath Not Applicable Yes Interaction Effects C-123 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters Equipment  
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
YSE
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Edge distance OK on bolts but looks small due to oversized washers underneath Not Applicable Yes Interaction Effects C-123
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-DGAB-INV Equipment Class:
(16) Inverters Equipment
 
== Description:==
AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-124
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F N U Seismic Walkdown Checklist (SWC)
Eauioment ID No.:
1-DGAB-INV Equipment Class:
(16) Inverters Eauioment DescriDtion:
AB EMERGEI C-125


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
1-DGAB-INV Equipment Class:
(16) Inverters Equipment


AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER P9130218 P9130219 C-126
Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: " George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-124 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F N U Seismic Walkdown Checklist (SWC)Eauioment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters Eauioment DescriDtion:
AB EMERGEI C-125 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-DGAB-INV Equipment Class: (16) Inverters Equipment


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
Equipment Class:
1 -DGAB-INV (16) Inverters C-127


AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER P9130218 P9130219 C-126 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 -DGAB-INV (16) Inverters C-127 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: I -DGAB-f NV (16) Inverters C-128 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
I -DGAB-f NV (16) Inverters C-128


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
Y-] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-ESW Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment


ESSENTIAL SERVICE WATER CONTROL PANEL Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
== Description:==
ESSENTIAL SERVICE WATER CONTROL PANEL Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 633.00 ft, 123 Manufacturer/Model:
AB1, 633.00 ft, 123 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
No 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Not Applicable Welded to embedded plate with shim plates 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is anchorage configuration verification required (i.e., is the item one of the 50%
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
of SWEL items requiring such verification)?
Not Applicable Yes Interaction Effects C-129 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets Equipment  
No
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Not Applicable Welded to embedded plate with shim plates
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Not Applicable Yes Interaction Effects C-129
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-ESW Equipment Class:
(20) Instrumentation and Control Panels and Cabinets Equipment
 
== Description:==
ESSENTIAL SERVICE WATER CONTROL PANEL
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Check ceiling tiles - OK - clipped per DWG 12-4070
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 (3
L$ A )"
Neda Stoeva 10/18/12 Photos C-130
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F]
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-ESW Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-1 31
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-ESW Equipment Class:
(20) Instrumentation and Control Panels and Cabinets C-132
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-ESW Equipment Class:
(20) Instrumentation and Control Panels and Cabinets pement


==
== Description:==
Description:==
ESSENTIAL SERVICE WATER CONTROL PANEL C-133


ESSENTIAL SERVICE WATER CONTROL PANEL 7. Are soft targets free from impact by nearby equipment or structures?
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-] N U
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Seismic Walkdown Checklist (SWC)
Check ceiling tiles -OK -clipped per DWG 12-4070 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
Equipment ID No.:
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
1-EZC-A Equipment Class:
Comments Evaluated by: -George G Thomas Date: 10/18/12 (3 L$ A )" Neda Stoeva 10/18/12 Photos C-130 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-1 31 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets C-132 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-ESW Equipment Class: (20) Instrumentation and Control Panels and Cabinets pement
(1) Motor Control Centers Equipment


== Description:==
== Description:==
600VAC MOTOR CONTROL CENTER EZC-A Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Anchorage
: 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
SQUG 1-EZC-A REVO
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-134


ESSENTIAL SERVICE WATER CONTROL PANEL C-133 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment  
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-A Equipment Class:
(1) Motor Control Centers Equipment


==
== Description:==
Description:==
600VAC MOTOR CONTROL CENTER EZC-A
: 7.
Are soft targets free from impact by nearby equipment or structures?
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-135


600VAC MOTOR CONTROL CENTER EZC-A Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
AB1, 613.00 ft, 205 Manufacturer/Model:
Y N U Seismic Walkdown Checklist (SWC)
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Equipment ID No.:
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
1-EZC-A Equipment Class:
SQUG 1-EZC-A REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
(1) Motor Control Centers 17 ui mn ecito:bUVUM 1
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
NIX C-136
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-134 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E N U Seismic Walkdown Checklist (SWC)
Description:==
Equipment ID No.:
1-EZC-A Equipment Class:
(1) Motor Control Centers Equipment


600VAC MOTOR CONTROL CENTER EZC-A 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
600VAC MOTOR CONTROL CENTER EZC-A P9170590 P9170591 C-137
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-135 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers 17 ui mn ecito:bUVUM 1 NIX C-136 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers Equipment


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
* N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-A Equipment Class:
(1) Motor Control Centers IT C-1 38


600VAC MOTOR CONTROL CENTER EZC-A P9170590 P9170591 C-137 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A Equipment Class: (1) Motor Control Centers IT C-1 38 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: rY-i N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A1 Equipment Class: (1) Motor Control Centers Euiodment Descriotion:
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: rY-i N U
600VAC MOTOR CONTROL CENTER EZC-A1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-A1 Equipment Class:
(1) Motor Control Centers Euiodment Descriotion:
600VAC MOTOR CONTROL CENTER EZC-A1 Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
A131, 613.00 ft, 205 Manufacturer/Model:
A131, 613.00 ft, 205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
Attached to 1-EZC-BI 2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1. Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
of SWEL items requiring such verification)?
Attached to 1-EZC-BI
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
No Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-139 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: T N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A1 Equipment Class: (1) Motor Control Centers Equipment
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-139


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
T N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-A1 Equipment Class:
(1) Motor Control Centers Equipment


600VAC MOTOR CONTROL CENTER EZC-A1 7. Are soft targets free from impact by nearby equipment or structures?
== Description:==
Yes 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
600VAC MOTOR CONTROL CENTER EZC-A1
Yes 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Other Adverse Conditions
: 7.
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Are soft targets free from impact by nearby equipment or structures?
Comments Evaluated by: ,,.- .. George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-1 40 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-A1 Equipment Class: (1) Motor Control Centers Eauioment
Yes
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Yes
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-1 40


==
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []
Description:==
N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-A1 Equipment Class:
(1) Motor Control Centers Eauioment


600VAC MOTOR CONTR C-141 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: 1 -EZC-A1 (1) Motor Control Centers IT C-142 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers Equioment DescriDtion:
== Description:==
600VAC MOTOR CONTROL CENTER EZC-B Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
600VAC MOTOR CONTR C-141
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y] N U
Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
1 -EZC-A1 (1) Motor Control Centers IT C-142
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [*Y1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-B Equipment Class:
(1) Motor Control Centers Equioment DescriDtion:
600VAC MOTOR CONTROL CENTER EZC-B Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
AB1, 613.00 ft, 205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
SQUG 1-EZC-B REVO 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is anchorage configuration verification required (i.e., is the item one of the 50%
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
of SWEL items requiring such verification)?
Yes Interaction Effects C-143 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: ] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers EauiDment  
SQUG 1-EZC-B REVO
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
Yes Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-143
 
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:  
] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-B Equipment Class:
(1) Motor Control Centers EauiDment
 
== Description:==
600VAC MOTOR CONTROL CENTER EZC-B
: 7.
Are soft targets free from impact by nearby equipment or structures?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-1 44
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-B Equipment Class:
(1) Motor Control Centers C-145
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-B Equipment Class:
(1) Motor Control Centers Equipment


==
== Description:==
Description:==
600VAC MOTOR CONTROL CENTER EZC-B P9170617 P9170618 C-146


600VAC MOTOR CONTROL CENTER EZC-B 7. Are soft targets free from impact by nearby equipment or structures?
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-] N U Seismic Walkdown Checklist (SWC)
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Equipment ID No.:
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
1-EZC-B Equipment Class:
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
(1) Motor Control Centers IT C-147
Comments Evaluated by: ,,..- George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-1 44 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers C-145 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers Equipment


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
Y N
U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
Equipment Class:
ioment Descriotion:
1 -EZC-B (1) Motor Control Centers IT C-148


600VAC MOTOR CONTROL CENTER EZC-B P9170617 P9170618 C-146 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B Equipment Class: (1) Motor Control Centers IT C-147 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: Equipment Class: ioment Descriotion:
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-] N U Seismic Walkdown Checklist (SWC)
1 -EZC-B (1) Motor Control Centers IT C-148 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B1 Equipment Class: (1) Motor Control Centers EauiDment DescriDtion:
Equipment ID No.:
600VAC MOTOR CONTROL CENTER EZC-B1 Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
1-EZC-B1 Equipment Class:
(1) Motor Control Centers EauiDment DescriDtion:
600VAC MOTOR CONTROL CENTER EZC-B1 Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1, 613.00 ft, 205 Manufacturer/Model:
AB1, 613.00 ft, 205 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
Attached to 1-EZC-A1 2. Is the anchorage free of bent, broken, missing or loose hardware?No Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 1.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
Attached to 1-EZC-A1
: 2.
Is the anchorage free of bent, broken, missing or loose hardware?
No Yes
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Not Applicable
Not Applicable
: 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
: 6.
Yes Interaction Effects C-149 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B1 Equipment Class: (1) Motor Control Centers EauiDment DescriDtion:
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
600VAC MOTOR CONTROL CENTER EZC-B1 7. Are soft targets free from impact by nearby equipment or structures?
Yes Interaction Effects C-149
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by: '" '- -George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-150 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B1 Equipment Class: (1) Motor Control Centers IT C-151 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-EZC-B1 Equipment Class: (1) Motor Control Centers EaUipment DesCdDtion:
600VAC MOTOR CONTROL CENTER EZC-B1 C-152 DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on Racks EquiDment


==
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Description:==
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-B1 Equipment Class:
(1) Motor Control Centers EauiDment DescriDtion:
600VAC MOTOR CONTROL CENTER EZC-B1
: 7.
Are soft targets free from impact by nearby equipment or structures?
: 8.
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:  
- George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-150


AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Project: DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [*Y1 N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-B1 Equipment Class:
(1) Motor Control Centers IT C-151
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-EZC-B1 Equipment Class:
(1) Motor Control Centers EaUipment DesCdDtion:
600VAC MOTOR CONTROL CENTER EZC-B1 C-152
 
DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-FFI-240 Equipment Class:
(18) Instruments on Racks EquiDment
 
== Description:==
AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Project:
DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):
AB1,621.00 ft, 10 Manufacturer/Model:
AB1,621.00 ft, 10 Manufacturer/Model:
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings.
Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.
Additional space is provided at the end of this checklist for documenting other comments.Anchorage 1. Is anchorage configuration verification required (i.e., is the item one of the 50%of SWEL items requiring such verification)?
Anchorage
: 1.
Is anchorage configuration verification required (i.e., is the item one of the 50%
of SWEL items requiring such verification)?
DOCS SD-090519-001, SD-090313-001, SD-090313-002
DOCS SD-090519-001, SD-090313-001, SD-090313-002
: 2. Is the anchorage free of bent, broken, missing or loose hardware?Yes Yes 3. Is the anchorage free of corrosion that is more than mild surface oxidation?
: 2.
Yes 4. Is the anchorage free of visible cracks in the concrete near the anchors?Yes 5. Is the anchorage configuration consistent with plant documentation? (Note: This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Is the anchorage free of bent, broken, missing or loose hardware?
Yes 6. Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Yes
Yes Interaction Effects C-153 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on Racks EQuipment Descriotion:
: 3.
Is the anchorage free of corrosion that is more than mild surface oxidation?
Yes
: 4.
Is the anchorage free of visible cracks in the concrete near the anchors?
Yes
: 5.
Is the anchorage configuration consistent with plant documentation? (Note:
This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)
Yes
: 6.
Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?
Yes Interaction Effects C-153
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-FFI-240 Equipment Class:
(18) Instruments on Racks EQuipment Descriotion:
AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER
AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER
: 7. Are soft targets free from impact by nearby equipment or structures?
: 7.
: 8. Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Are soft targets free from impact by nearby equipment or structures?
: 9. Do attached lines have adequate flexibility to avoid damage?10. Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?Yes Yes Yes Yes Other Adverse Conditions
: 8.
: 11. Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?
Comments Evaluated by: , George G Thomas Date: 10/18/12 Neda Stoeva 10/18/12 Photos C-154 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on Racks C-155 DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: Y-] N U Seismic Walkdown Checklist (SWC)Equipment ID No.: 1-FFI-240 Equipment Class: (18) Instruments on Racks C-156}}
: 9.
Do attached lines have adequate flexibility to avoid damage?
: 10.
Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?
Yes Yes Yes Yes Other Adverse Conditions
: 11.
Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?
Comments Evaluated by:
George G Thomas Date:
10/18/12 Neda Stoeva 10/18/12 Photos C-154
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-FFI-240 Equipment Class:
(18) Instruments on Racks C-155
 
DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:
Y-] N U Seismic Walkdown Checklist (SWC)
Equipment ID No.:
1-FFI-240 Equipment Class:
(18) Instruments on Racks C-156}}

Latest revision as of 19:32, 11 January 2025

Seismic Walkdown Report SD-121023-001, Rev. 0 in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Appendix C, Page C-113 Through C-156
ML12362A073
Person / Time
Site: Cook  
Issue date: 11/05/2012
From: Stoeva N
Stevenson & Associates
To:
Office of Nuclear Reactor Regulation, American Electric Power, Indiana Michigan Power Co
References
AEP-NRC-2012-87 SD-121023-001, Rev 0
Download: ML12362A073 (44)


Text

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: iYj] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Ecuipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

Yes

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-113

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-114

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets EauiDment Descriotion:

AB EMERGENCY DIESEL GENERATOR OME-150-A C-115

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: r N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-116

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB CONTROL P9130239 P9130240 C-117

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E-YI N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets ioment Descriotion:

AB EMERGENCY DIESEL GENERATOR OME-150-A C-118

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-119

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Eauioment Descriotion:

AB EMERGENCY DIESEL GENERATOR OME-150-AI C-120

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LIII N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-121

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LI] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB Equipment Class:

(20) Instrumentation and Control Panels and Cabinets oment Descrintion:

AB EMERGENCY DIESEL GENERATOR OME-150-Al C-122

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB-INV Equipment Class:

(16) Inverters Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER Project:

DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 587.00 ft, 121 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

YSE

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Edge distance OK on bolts but looks small due to oversized washers underneath Not Applicable Yes Interaction Effects C-123

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB-INV Equipment Class:

(16) Inverters Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-124

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F N U Seismic Walkdown Checklist (SWC)

Eauioment ID No.:

1-DGAB-INV Equipment Class:

(16) Inverters Eauioment DescriDtion:

AB EMERGEI C-125

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-DGAB-INV Equipment Class:

(16) Inverters Equipment

Description:

AB EMERGENCY DIESEL GENERATOR OME-150-AB INVERTER P9130218 P9130219 C-126

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

1 -DGAB-INV (16) Inverters C-127

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: EY] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

I -DGAB-f NV (16) Inverters C-128

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL Project:

DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 633.00 ft, 123 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

No

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Not Applicable Welded to embedded plate with shim plates

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Not Applicable Yes Interaction Effects C-129

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets Equipment

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Check ceiling tiles - OK - clipped per DWG 12-4070

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 (3

L$ A )"

Neda Stoeva 10/18/12 Photos C-130

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F]

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-1 31

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets C-132

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-ESW Equipment Class:

(20) Instrumentation and Control Panels and Cabinets pement

Description:

ESSENTIAL SERVICE WATER CONTROL PANEL C-133

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-A Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A Project:

DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

SQUG 1-EZC-A REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-134

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-A Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-135

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-A Equipment Class:

(1) Motor Control Centers 17 ui mn ecito:bUVUM 1

NIX C-136

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: E N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-A Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A P9170590 P9170591 C-137

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

  • N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-A Equipment Class:

(1) Motor Control Centers IT C-1 38

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: rY-i N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-A1 Equipment Class:

(1) Motor Control Centers Euiodment Descriotion:

600VAC MOTOR CONTROL CENTER EZC-A1 Project:

DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

A131, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1. Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Attached to 1-EZC-BI

2.

Is the anchorage free of bent, broken, missing or loose hardware?

No Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-139

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

T N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-A1 Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-A1

7.

Are soft targets free from impact by nearby equipment or structures?

Yes

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

Yes

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-1 40

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: []

N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-A1 Equipment Class:

(1) Motor Control Centers Eauioment

Description:

600VAC MOTOR CONTR C-141

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y] N U

Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

1 -EZC-A1 (1) Motor Control Centers IT C-142

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [*Y1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B Equipment Class:

(1) Motor Control Centers Equioment DescriDtion:

600VAC MOTOR CONTROL CENTER EZC-B Project:

DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

SQUG 1-EZC-B REVO

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-143

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B Equipment Class:

(1) Motor Control Centers EauiDment

Description:

600VAC MOTOR CONTROL CENTER EZC-B

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-1 44

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B Equipment Class:

(1) Motor Control Centers C-145

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B Equipment Class:

(1) Motor Control Centers Equipment

Description:

600VAC MOTOR CONTROL CENTER EZC-B P9170617 P9170618 C-146

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: F-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B Equipment Class:

(1) Motor Control Centers IT C-147

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N

U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

Equipment Class:

ioment Descriotion:

1 -EZC-B (1) Motor Control Centers IT C-148

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: LY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B1 Equipment Class:

(1) Motor Control Centers EauiDment DescriDtion:

600VAC MOTOR CONTROL CENTER EZC-B1 Project:

DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1, 613.00 ft, 205 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

Attached to 1-EZC-A1

2.

Is the anchorage free of bent, broken, missing or loose hardware?

No Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Not Applicable

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-149

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B1 Equipment Class:

(1) Motor Control Centers EauiDment DescriDtion:

600VAC MOTOR CONTROL CENTER EZC-B1

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

- George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-150

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: [*Y1 N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B1 Equipment Class:

(1) Motor Control Centers IT C-151

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-EZC-B1 Equipment Class:

(1) Motor Control Centers EaUipment DesCdDtion:

600VAC MOTOR CONTROL CENTER EZC-B1 C-152

DC Cook Unit I & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status: FY-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-FFI-240 Equipment Class:

(18) Instruments on Racks EquiDment

Description:

AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER Project:

DC Cook 1 SWEL Location (Bldg, Elev, Room/Area):

AB1,621.00 ft, 10 Manufacturer/Model:

Instructions for Completing Checklist This checklist may be used to document the results of the Seismic Walkdown of an item of equipment on the SWEL. The space below each of the following questions may be used to record the results of judgments and findings. Additional space is provided at the end of this checklist for documenting other comments.

Anchorage

1.

Is anchorage configuration verification required (i.e., is the item one of the 50%

of SWEL items requiring such verification)?

DOCS SD-090519-001, SD-090313-001, SD-090313-002

2.

Is the anchorage free of bent, broken, missing or loose hardware?

Yes Yes

3.

Is the anchorage free of corrosion that is more than mild surface oxidation?

Yes

4.

Is the anchorage free of visible cracks in the concrete near the anchors?

Yes

5.

Is the anchorage configuration consistent with plant documentation? (Note:

This question only applies if the item is one of the 50% for which an anchorage configuration verification is required.)

Yes

6.

Based on the above anchorage evaluations, is the anchorage free of potentially adverse seismic conditions?

Yes Interaction Effects C-153

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-FFI-240 Equipment Class:

(18) Instruments on Racks EQuipment Descriotion:

AUX FEEDWATER TO SG OME-3-4 FLOW INDICATOR TRANSMITTER

7.

Are soft targets free from impact by nearby equipment or structures?

8.

Are overhead equipment, distribution systems, ceiling tiles and lighting, and masonry block walls not likely to collapse onto the equipment?

9.

Do attached lines have adequate flexibility to avoid damage?

10.

Based on the above seismic interaction evaluations, is equipment free of potentially adverse seismic interaction effects?

Yes Yes Yes Yes Other Adverse Conditions

11.

Have you looked for and found no adverse seismic conditions that could Yes adversely affect the safety functions of the equipment?

Comments Evaluated by:

George G Thomas Date:

10/18/12 Neda Stoeva 10/18/12 Photos C-154

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-FFI-240 Equipment Class:

(18) Instruments on Racks C-155

DC Cook Unit 1 & Unit 2 SD-121023-001 Rev. 0, 11/05/12 Status:

Y-] N U Seismic Walkdown Checklist (SWC)

Equipment ID No.:

1-FFI-240 Equipment Class:

(18) Instruments on Racks C-156