ENS 45178: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 06/30/2009 15:13 PDT
| event date = 06/30/2009 15:13 PDT
| last update date = 06/30/2009
| last update date = 06/30/2009
| title = Potential Media Interest Due To Forced Outage
| title = Potential Media Interest Due to Forced Outage
| event text = On June 30, 2009, at 1513 PDT, Unit 2 commenced a ramp[-down] in accordance with the annunciator response guidance to enter Operating Procedure (OP) Abnormal Procedure AP-25 due to loss of  forced cooling to main transformer bank (MTB) C-Phase transformer.  At 1538, Unit 2 was separated from the grid in accordance with plant OP AP-25 initiation of a main generator unit trip.  At 1554 PDT, the Reactor Trip Breakers (RTBs) were manually opened per OP AP-25 Step 24.j.  [Reactor] power was being held in Mode 2 at about 3% reactor power per the procedure when the RTBs were opened.
| event text = On June 30, 2009, at 1513 PDT, Unit 2 commenced a ramp[-down] in accordance with the annunciator response guidance to enter Operating Procedure (OP) Abnormal Procedure AP-25 due to loss of  forced cooling to main transformer bank (MTB) C-Phase transformer.  At 1538, Unit 2 was separated from the grid in accordance with plant OP AP-25 initiation of a main generator unit trip.  At 1554 PDT, the Reactor Trip Breakers (RTBs) were manually opened per OP AP-25 Step 24.j.  [Reactor] power was being held in Mode 2 at about 3% reactor power per the procedure when the RTBs were opened.
The investigation into the cause is continuing.
The investigation into the cause is continuing.

Latest revision as of 22:11, 1 March 2018

ENS 45178 +/-
Where
Diablo Canyon Pacific Gas & Electric icon.png
California (NRC Region 4)
Reporting
10 CFR 50.72(b)(2)(xi), Notification to Government Agency or News Release
Time - Person (Reporting Time:+-0.4 h-0.0167 days <br />-0.00238 weeks <br />-5.4792e-4 months <br />)
Opened: Anthony Chitwood
21:49 Jun 30, 2009
NRC Officer: Vince Klco
Last Updated: Jun 30, 2009