ENS 45500: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by Mark Hawes) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 16: | Line 16: | ||
| event date = 11/16/2009 EST | | event date = 11/16/2009 EST | ||
| last update date = 11/16/2009 | | last update date = 11/16/2009 | ||
| title = Part 21 Notification - Potential Failure | | title = Part 21 Notification - Potential Failure in Emergency Diesel Generator Bearings | ||
| event text = The following report was received via facsimile: | | event text = The following report was received via facsimile: | ||
PART 21 involving Wartsila type SACM UD45 Emergency Diesel Generating [EDG] set big end bearings installed in the US nuclear power stations of Constellation Energy at Calvert Cliffs and Xcel Energy at Prairie Island. | PART 21 involving Wartsila type SACM UD45 Emergency Diesel Generating [EDG] set big end bearings installed in the US nuclear power stations of Constellation Energy at Calvert Cliffs and Xcel Energy at Prairie Island. |
Latest revision as of 22:10, 1 March 2018
Where | |
---|---|
Wartsila France S.A.S (NRC Region) | |
Organization: | Wartsila France S.A.S |
Reporting | |
10 CFR 21.21 | |
Time - Person (Reporting Time:+9.45 h0.394 days <br />0.0562 weeks <br />0.0129 months <br />) | |
Opened: | Daniel Dietrich 14:27 Nov 16, 2009 |
NRC Officer: | Mark Abramovitz |
Last Updated: | Nov 16, 2009 |
45500 - NRC Website | |