ENS 46881: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 03/26/2011 20:05 CDT
| event date = 03/26/2011 20:05 CDT
| last update date = 05/24/2011
| last update date = 05/24/2011
| title = 60-Day Telephonic Notification Of Invalid Primary Containment Isolation Signal Due To Maintenance
| title = 60-Day Telephonic Notification of Invalid Primary Containment Isolation Signal Due to Maintenance
| event text = This 60-day telephone notification is being made per the reporting requirements specified by 10 CFR 50.73(a)(2)(iv) and 10 CFR 50.73(a)(1) to describe an invalid actuation of multiple secondary containment isolation signals affecting more than one system.  
| event text = This 60-day telephone notification is being made per the reporting requirements specified by 10 CFR 50.73(a)(2)(iv) and 10 CFR 50.73(a)(1) to describe an invalid actuation of multiple secondary containment isolation signals affecting more than one system.  
On March 26, 2011, at 2005 hours Central Daylight Time (CDT), following planned maintenance activities, an unplanned actuation of secondary containment isolation signals affecting containment isolation valves in more than one system occurred and resulted in a partial Primary Containment Isolation System (PCIS) (Group 6, Secondary Containment) isolation and receipt of a Unit 2 Reactor Building Ventilation Abnormal Alarm.  Unit 2 was in Mode 4, in a refueling outage, and at 0 percent power (0 MWT).  Units 1 and 3 were both in Mode 1 and operating at approximately 100 percent power.
On March 26, 2011, at 2005 hours Central Daylight Time (CDT), following planned maintenance activities, an unplanned actuation of secondary containment isolation signals affecting containment isolation valves in more than one system occurred and resulted in a partial Primary Containment Isolation System (PCIS) (Group 6, Secondary Containment) isolation and receipt of a Unit 2 Reactor Building Ventilation Abnormal Alarm.  Unit 2 was in Mode 4, in a refueling outage, and at 0 percent power (0 MWT).  Units 1 and 3 were both in Mode 1 and operating at approximately 100 percent power.

Latest revision as of 21:07, 1 March 2018

ENS 46881 +/-
Where
Browns Ferry Tennessee Valley Authority icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1409.07 h58.711 days <br />8.387 weeks <br />1.93 months <br />)
Opened: Ricky Givens
18:09 May 24, 2011
NRC Officer: Howie Crouch
Last Updated: May 24, 2011
46881 - NRC Website
Loading map...