ENS 48987: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:
| event date = 04/22/2013 CDT
| event date = 04/22/2013 CDT
| last update date = 05/01/2013
| last update date = 05/01/2013
| title = Agreement State Report - Shutters Found That Were Difficult To Operate On Two Process Gauges
| title = Agreement State Report - Shutters Found That Were Difficult to Operate on Two Process Gauges
| event text = The following was received from the State of Louisiana via facsimile:
| event text = The following was received from the State of Louisiana via facsimile:
On 4/22/2013, the Radiation Safety Officer (RSO) for ExxonMobile Chemical was performing his annual inventory and operational checks on the level gauges at the Baton Rouge facility. During the checks, two level gauges were found with shutters that were difficult to operate.
On 4/22/2013, the Radiation Safety Officer (RSO) for ExxonMobile Chemical was performing his annual inventory and operational checks on the level gauges at the Baton Rouge facility. During the checks, two level gauges were found with shutters that were difficult to operate.

Revision as of 22:01, 1 March 2018

ENS 48987 +/-
Where
Exxon Mobile Chemical
Baton Rouge, Louisiana (NRC Region 4)
License number: La-2349-L01
Organization: Louisiana Radiation Protection Div
Reporting
Agreement State
Time - Person (Reporting Time:+220.72 h9.197 days <br />1.314 weeks <br />0.302 months <br />)
Opened: Melanie Bauder
09:43 May 1, 2013
NRC Officer: Charles Teal
Last Updated: May 1, 2013
48987 - NRC Website