ENS 48932: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 17: Line 17:
| event date = 04/16/2013 16:25 EDT
| event date = 04/16/2013 16:25 EDT
| last update date = 06/04/2013
| last update date = 06/04/2013
| title = Potential Cable Size And Breaker Mismatch
| title = Potential Cable Size and Breaker Mismatch
| event text = During investigation of a documentation discrepancy, a potential cable size and breaker mismatch was identified to exist in a non-safety related DC panel. Initial evaluation has shown that the cable may heat and be potentially damaged if exposed to a 'smart' high impedance fault for an extended period. This discovered condition has not been previously analyzed for NFPA [National Fire Protection Association] 805 common enclosure circuit coordination.
| event text = During investigation of a documentation discrepancy, a potential cable size and breaker mismatch was identified to exist in a non-safety related DC panel. Initial evaluation has shown that the cable may heat and be potentially damaged if exposed to a 'smart' high impedance fault for an extended period. This discovered condition has not been previously analyzed for NFPA [National Fire Protection Association] 805 common enclosure circuit coordination.
Fire watches were established as a compensatory measure immediately following identification of the issue on April 8, 2013. An initial review of fire protection analysis was completed on April 16, 2013.  Fire watches remain in place until a modification which will restore coordination is complete.
Fire watches were established as a compensatory measure immediately following identification of the issue on April 8, 2013. An initial review of fire protection analysis was completed on April 16, 2013.  Fire watches remain in place until a modification which will restore coordination is complete.

Latest revision as of 21:00, 1 March 2018

ENS 48932 +/- *RETRACTED*
Where
Harris Duke Energy icon.png
North Carolina (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition
Time - Person (Reporting Time:+-3.17 h-0.132 days <br />-0.0189 weeks <br />-0.00434 months <br />)
Opened: Mark Lee
17:15 Apr 16, 2013
NRC Officer: Charles Teal
Last Updated: Jun 4, 2013
48932 - NRC Website
Loading map...