ENS 49619: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 12/09/2013 09:06 CST
| event date = 12/09/2013 09:06 CST
| last update date = 12/09/2013
| last update date = 12/09/2013
| title = Smoke Detection Panel Removed From Service For Planned Maintenance
| title = Smoke Detection Panel Removed from Service for Planned Maintenance
| event text = At 0906 CST on December 9, 2013, the Unit 1 pyro panel (smoke detection panel) was removed from service for planned repairs.  The pyro panel is expected to be out of service for approximately 8 hours.  Viable compensatory measures have been established for all affected areas except the Unit 1 Containment Building.  Since a fire in Containment is an entry condition for the site's Emergency Plan, this is considered a loss of emergency assessment capability and is being reported per 10CFR50.72(b)(3)(xiii).  Containment temperatures are being monitored while the pyro panel is out of service, however this is not considered a satisfactory compensatory measure for maintaining an effective assessment capability.  
| event text = At 0906 CST on December 9, 2013, the Unit 1 pyro panel (smoke detection panel) was removed from service for planned repairs.  The pyro panel is expected to be out of service for approximately 8 hours.  Viable compensatory measures have been established for all affected areas except the Unit 1 Containment Building.  Since a fire in Containment is an entry condition for the site's Emergency Plan, this is considered a loss of emergency assessment capability and is being reported per 10CFR50.72(b)(3)(xiii).  Containment temperatures are being monitored while the pyro panel is out of service, however this is not considered a satisfactory compensatory measure for maintaining an effective assessment capability.  
A follow-up notification will be provided upon restoration of Containment Building smoke detection capability.  
A follow-up notification will be provided upon restoration of Containment Building smoke detection capability.  

Latest revision as of 20:52, 1 March 2018

ENS 49619 +/-
Where
Farley Southern Nuclear icon.png
Alabama (NRC Region 2)
Reporting
10 CFR 50.72(b)(3)(xiii), Loss of Emergency Preparedness
Time - Person (Reporting Time:+-4.78 h-0.199 days <br />-0.0285 weeks <br />-0.00655 months <br />)
Opened: John Andrews
10:19 Dec 9, 2013
NRC Officer: Donald Norwood
Last Updated: Dec 9, 2013
49619 - NRC Website
Loading map...