ENS 51547: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by Mark Hawes)
 
(Created page by program invented by StriderTol)
 
Line 16: Line 16:
| event date = 11/18/2015 03:26 EST
| event date = 11/18/2015 03:26 EST
| last update date = 01/19/2016
| last update date = 01/19/2016
| title = Invalid Actuation Of 3A Emergency Diesel Generator (Edg)
| title = Invalid Actuation of 3A Emergency Diesel Generator (Edg)
| event text = This is a non-emergency eight hour notification in accordance with 10 CFR 50.72(b)(3)(iv)(A), for an automatic actuation of the 3A Emergency Diesel Generator (EDG).
| event text = This is a non-emergency eight hour notification in accordance with 10 CFR 50.72(b)(3)(iv)(A), for an automatic actuation of the 3A Emergency Diesel Generator (EDG).
On 11/18/15 at approximately 0326 [EST] a loss of power was experienced on the 3A 4KV Bus. The redundant 3B 4KV bus did not experience a loss of power. All systems operated as expected following the loss of power with the 3A EDG automatically sequencing onto the 3A 4KV bus and the load sequencer loading as designed. At the time of the actuation, Unit 3 was in a refueling outage in MODE 5. Investigation into the cause of the loss of power is in progress. There was no impact on Unit 4 operation during this time.
On 11/18/15 at approximately 0326 [EST] a loss of power was experienced on the 3A 4KV Bus. The redundant 3B 4KV bus did not experience a loss of power. All systems operated as expected following the loss of power with the 3A EDG automatically sequencing onto the 3A 4KV bus and the load sequencer loading as designed. At the time of the actuation, Unit 3 was in a refueling outage in MODE 5. Investigation into the cause of the loss of power is in progress. There was no impact on Unit 4 operation during this time.

Latest revision as of 21:45, 1 March 2018

ENS 51547 +/-
Where
Turkey Point NextEra Energy icon.png
Florida (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1.45 h0.0604 days <br />0.00863 weeks <br />0.00199 months <br />)
Opened: Nicholas Desantis
09:53 Nov 18, 2015
NRC Officer: Steven Vitto
Last Updated: Jan 19, 2016
51547 - NRC Website