ML17284A898: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 3: | Line 3: | ||
| issue date = 10/14/1999 | | issue date = 10/14/1999 | ||
| title = Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 | | title = Forwards Rev 0 to WNP-2 Cycle 15,COLR 99-15, IAW Requirements of TS 5.6.5 | ||
| author name = | | author name = Coleman D | ||
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | | author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM | ||
| addressee name = | | addressee name = | ||
Revision as of 23:37, 18 June 2019
| ML17284A898 | |
| Person / Time | |
|---|---|
| Site: | Columbia |
| Issue date: | 10/14/1999 |
| From: | Coleman D WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML17284A899 | List: |
| References | |
| GO2-99-182, NUDOCS 9910260106 | |
| Download: ML17284A898 (3) | |
Text
ATEGORY 1~'EGULAT RY, INFORMATION DISTRIBUTIOh SYSTEM (RIDS)ACCESSION NBR:9910260106 DOC.DATE.99/10/14 NOTARIZED:
NO DOCKET FACIL:50-397 WPPSS Nuclear Project, Unit 2, Washington Publi'c Powe 05000397 AUTH.NAME~.AUTHOR AFFILIATION COLEMAN,D.W.
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)
SUBJECT:
Forwards rev 0 to"WNP-2 Cycle 15,COLR 99-15," IAW recpxirements of TS 5.6.5.DZSTRZBUTZON CODE: AOOZD COPTER RECEZVED:LTR I ENCL J SZZE: "+Q TITLE: OR Submittal:
General Distribution NOTES: RECIPIENT ID CODE/NAME PEYTON,E SC INTERNAL: ACRS NRR/DSSA/SPLB NUDOCS-ABSTRACT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME CUSHING,J LE CENTER XB OGC/RP COPIES LTTR ENCL 1 1 1 1 1 1 1 0 R Y, EXTERNAL: NOAC 1 1 NRC PDR D U'E N NOTE TO ALL"RZDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 10 EÃE8F@ÃNORTH WEST PO.Box 968 a Richland, Washington 99352-0968 October 14, 1999 G02-99-182 Docket No.50-397 U.S.Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:
Subject:
WNP-2, OPERATING LICENSE NPF-21 CYCLE 15 CORE OPERATING LIMITS REPORT (COLR)Energy Northwest hereby submits COLR 99-15, Revision 0, in accordance with the requirements of WNP-2 Technical Specification 5.6.5.The operating limits in the COLR that were developed from the Cycle 15 reload and licensing analyses have been evaluated against the criteria of 10 CFR 50:59 and it was determined that implementation of this report does not result in an unreviewed safety question.The COLR has been reviewed and approved by the WNP-2 Plant Operations Committee.
Should you have any questions or desire additional information regarding this matter, please contact me or PJ Inserra at (509)377-4147.Respectfully, JR DW Coleman (Mail Drop PE20)Manager, Regulatory Affairs cc: EW Merschoff-NRC RIV JS Cushing-NRCNRR
~g tl~-Oo DL Williams-BPA/1399 TC Poindexter
-Winston&Strawn NRC Sr.Resident Inspector-927N parol I 9 9i0260i06 99iOi4 t PDR ADOCK 05000397 P PDR P