|
|
Line 16: |
Line 16: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:Page 1 of 27--J-(, As of: October 31, 2014Received: | | {{#Wiki_filter:Page 1 of 2 7--J-(, As of: October 31, 2014 Received: |
| October 30, 2014Status: Pending_ | | October 30, 2014 Status: Pending_ Post PUBLIC SUBMISSION Tracking No. ljy-8f80-rg6t Comments Due: October 34 Submission Type: Web Docket: NRC-2014-0207 Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations 1 0,.2014 Comment On: NRC-2014-0207-0001 Applications and Amendments to Facility Operating Licenses and Combined Licenses Hazards Considerations Document: |
| PostPUBLIC SUBMISSION Tracking No. ljy-8f80-rg6t Comments Due: October 34Submission Type: WebDocket: NRC-2014-0207 Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined LicensesInvolving No Significant Hazards Considerations 10,.2014Comment On: NRC-2014-0207-0001 Applications and Amendments to Facility Operating Licenses and Combined LicensesHazards Considerations Document:
| | NRC-2014-0207-DRAFT-0002 Comment on FR Doc # 2014-23015 No Significant Submitter Information Name: Michael Keegan Address: P.O. Box 463 Monroe, MI, 48161 Email: mkeeganj @comcast.net Submitter's Representative: |
| NRC-2014-0207-DRAFT-0002 Comment on FR Doc # 2014-23015 No Significant Submitter Information Name: Michael KeeganAddress:P.O. Box 463Monroe, MI, 48161Email: mkeeganj | | Michael J. Keegan Organization: |
| @comcast.net Submitter's Representative: | | Don't Waste Michigan Government Agency Type: State Government Agency: NGO 171 0i-~w rn-~m O~)General Comment |
| Michael J. KeeganOrganization: | |
| Don't Waste MichiganGovernment Agency Type: StateGovernment Agency: NGO1710i-~wrn-~mO~)General Comment | |
|
| |
|
| ==Dear NRC Docketing,== | | ==Dear NRC Docketing,== |
| | | Don't Waste Michigan goes on record in opposition to the proposed Palisades, License Amendment Request to Implement 10 CFR 50.61 a, "Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events." dated 7/29/2014. |
| Don't Waste Michigan goes on record in opposition to the proposed Palisades, License Amendment Request toImplement 10 CFR 50.61 a, "Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events." | | Palisades is the most embrittled nuclear power plant in the nation. Palisades Entergy, LLC is currently operating with a chunk of metal stuck in the bottom of the reactor. The Palisades nuclear facility is compromised in a multitude of ways that are well known and yet, unaddressed by Utility and NRC and with work is deferred.To the best of our records, Palisades exceeded technical specification regarding Pressurized Thermal Shock in 1981. Since that time standards have been pencil whipped 7 times by the NRC and methodologies have been switched out. Each time Palisades exceeds embrittlement |
| dated 7/29/2014. | |
| Palisades is the most embrittled nuclear power plant in the nation. Palisades | |
| : Entergy, LLC is currently operating with a chunk of metal stuck in the bottom of the reactor.
| |
| The Palisades nuclear facility is compromised in amultitude of ways that are well known and yet, unaddressed by Utility and NRC and with work is deferred. | |
| To the best of our records, Palisades exceeded technical specification regarding Pressurized Thermal Shock in1981. Since that time standards have been pencil whipped 7 times by the NRC and methodologies have beenswitched out. Each time Palisades exceeds embrittlement | |
| / PTS standards, the NRC has rolled those standards https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648190cd6f&for... | | / PTS standards, the NRC has rolled those standards https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648190cd6f&for... |
| 10/31/2014 Page 2 of 2back. The NRC oversight has been inadequate. | | 10/31/2014 Page 2 of 2 back. The NRC oversight has been inadequate. |
| If the Palisades reactor vessel fails due to PTS it will not be anaccident. | | If the Palisades reactor vessel fails due to PTS it will not be an accident. |
| It will be the probable outcome to a set of circumstances which the NRC has tolerated for decades atgreat peril to the public. The public has no confidence in the NRC knowing what they are doing. This hasbecome a jobs program for the NRC, perpetually kicking the proverbial can down the road with fingers crosseduntil it is time to retire. Stop twisting this Tiger by the tail.Don't Waste Michigan requests that the NRC not issue a License Amendment to Palisades Entergy LLC.Thank youMichael J. KeeganDon't Waste MichiganP.O. Box 463 Monroe, MI 48161mkeeganj | | It will be the probable outcome to a set of circumstances which the NRC has tolerated for decades at great peril to the public. The public has no confidence in the NRC knowing what they are doing. This has become a jobs program for the NRC, perpetually kicking the proverbial can down the road with fingers crossed until it is time to retire. Stop twisting this Tiger by the tail.Don't Waste Michigan requests that the NRC not issue a License Amendment to Palisades Entergy LLC.Thank you Michael J. Keegan Don't Waste Michigan P.O. Box 463 Monroe, MI 48161 mkeeganj @comcast.net https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648190cd6f&for... |
| @comcast.net https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648190cd6f&for... | |
| 10/31/2014}} | | 10/31/2014}} |
|
---|
Category:General FR Notice Comment Letter
MONTHYEARML23005A2082022-12-29029 December 2022 Comment (14) of B. Iris Potter on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A1982022-12-27027 December 2022 Comment (8) of Terry Lodge on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A1972022-12-27027 December 2022 Comment (7) of Kraig Schultz on Behalf of Schultz Engineering on Holtec Decommissioning International, LLC, Palisades Nuclear Plant, Post-Shutdown Decommissioning Activities Report ML23005A2012022-12-27027 December 2022 Comment (9) of Kathryn Barnes on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A2022022-12-27027 December 2022 Comment (10) of Mark Muhich on Behalf of Sierra Club Nuclear Free Michigan on Holtec Decommissioning International, LLC, Palisades Nuclear Plant, Post- Shutdown Decommissioning Activities Report ML23005A2032022-12-27027 December 2022 Comment (11) of the Council on Intelligent Energy & Conservation Policy and Promoting Health & Sustainable Energy on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A2052022-12-27027 December 2022 Comment (12) of Michael J. Keegan on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A2062022-12-27027 December 2022 Comment (13) of Kevin Kamps on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A2102022-12-27027 December 2022 Comment (15) of Kay Cumbow and Victor Mcmnemy on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A2112022-12-27027 December 2022 Comment (16) of Terry J. Lodge on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A2132022-12-27027 December 2022 Comment (17) of Kevin Kamps on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A1932022-12-26026 December 2022 Comment (5) of Steve Smith on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML23005A1952022-12-26026 December 2022 Comment (6) of Ryan Pickering on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML22355A1482022-12-21021 December 2022 Comment (4) of Shawn Connors on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML22355A1422022-12-20020 December 2022 Comment (2) from Karen Schaumann Re Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML22355A1472022-12-20020 December 2022 Comment (3) of Matthew C on Holtec Decommissioning International, LLC Palisades Nuclear Plant Post-Shutdown Decommissioning Activities Report ML21069A0392021-03-0303 March 2021 Comment (173) of Kevin on Notice of Intent to Conduct Scoping Process and Prepare Environmental Impact Statement NextEra Energy Point Beach, LLC; Point Beach Nuclear Plant, Unit Nos. 1 and 2 ML21041A1262021-02-0909 February 2021 Comment (4) of Cathy Sayre on Palisades Nuclear Plant and Big Rock Point Plant Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments ML21040A2152021-02-0808 February 2021 Comment (2) of Stephen C. Brown on Palisade Nuclear Plant and Big Rock Point Plant Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments ML21040A2172021-02-0808 February 2021 Comment (3) of Richard Barron on Palisades and Big Rock Point Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments ML21040A2112021-02-0707 February 2021 Comment (1) of Mark Muhich on Palisade Nuclear Plant and Big Rock Point Plant Consideration of Approval of Transfer of Control of Licenses and Conforming Amendments ML16015A3272016-01-0707 January 2016 Comment (2) of Jan Boudart Regarding Guidance: Subsequent License Renewal ML15139A0832015-05-12012 May 2015 Comment (10) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule ML15139A0822015-05-12012 May 2015 Comment (15) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule ML15139A0342015-05-12012 May 2015 Comment (12) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule ML15139A0332015-05-12012 May 2015 Comment (11) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule ML15139A0322015-05-12012 May 2015 Comment (9) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule ML15139A0302015-05-12012 May 2015 Comment (7) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule ML15139A0292015-05-12012 May 2015 Comment (6) of Kevin Kamps on Behalf of Beyond Nuclear Opposing Draft Guidance Regarding the Alternate Pressurized Thermal Shock Rule ML14309A1912014-10-31031 October 2014 Comment (4) of Sandy Mccomb on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML14309A1922014-10-30030 October 2014 Comment (00002) of Michael Keegan on Behalf of Don'T Waste Michigan on Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations ML0804203042008-01-21021 January 2008 Comment (1) of Tom Gurdziel Opposing the Inclusion of Vermont Yankee, Indian Point Unit 1, Indian Point Unit 2, and Indian Point Unit 3 in a Holding Company Owned by Entergy ML0636204232006-12-12012 December 2006 Comment (1) of K. A. Westlake on Behalf of EPA Re Generic Environmental Impact Statement for License Renewal of Nuclear Plant, Supplement 27: Palisades, Final Report, NUREG-1437 ML0625500622006-09-0505 September 2006 Comment (22) of Kimon Kotos on Nrc'S Low-Level Radioactive Waste Program. Supports Position Submitted by Nirs and Recommends Not to Renew Palisades License Extension ML0618600692006-06-22022 June 2006 Comment (16) of Terry J. Lodge Regarding Notice of Pertinent New Case Law Affecting Proceeding: Request for Redraft of EIS, Additional Comment Period, and for New Period for Receipt of Contentions on Terrorism ML0619204802006-06-19019 June 2006 Comment (17) of Martha Macfarlane Faes, Re ER-05-249, Palisades Nuclear Power Plant License Renewal, Covert Township, Van Buren County (NRC) ML0616401142006-05-26026 May 2006 Comment (14) of Kenneth A. Westlake on Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 27: Palisades Nuclear Plant, Van Buren County, Michigan, Draft Report, NUREG-1437 ML0615700222006-05-18018 May 2006 Comment (12) of Kevin Kamps on NUREG-1437, Supplement 27, Draft ML0615700422006-05-18018 May 2006 Comment (10) of Various, on NUREG-1437, Supplement 27 to Generic Environmental Impact Statement for License Renewal of Palisades Nuclear Power Plant ML0615700252006-05-15015 May 2006 Comment (13) of Michael T. Chezik for Renewing License for Palisades Nuclear Plant ML0615700202006-05-15015 May 2006 Comment (11) of Terry and Laura O'Brien on NUREG-1437, Supplement 27 Re Opposition of the Renewal of the Palisades Nuclear Power Plant License ML0613705092006-05-15015 May 2006 Comment (8) of P. Harden Draft Supplement 27 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants, NUREG 1437, for Palisades Nuclear Plant License Renewal ML0613200362006-05-0101 May 2006 Comment (7) of Diane Byme, Re While for Safe, New, Nuclear Plants/Technology, Feels in Best Interest of Public for Safety Issues to Close Down Palisades and Not Renew License ML0612402062006-04-23023 April 2006 Comment (6) of Marguerite Callaghan for Renewal of License for Palisades Nuclear Facility ML0614601462006-04-19019 April 2006 Comment (9) of Morgan Dill, Opposing License Renewal of Palisades ML0612100512006-04-10010 April 2006 Comment (3) of Paul C. French, Jr., Supporting Renewing License for Palisades Nuclear Generating Plant for Another 20 Years ML0612100432006-04-0202 April 2006 Comment (5) of A. Hanson, Strongly Opposing the Proposed 20 Year License Extension at Palisades Nuclear Power Plant ML0612100442006-04-0202 April 2006 Comment (4) of N. Hanson, Strongly Opposing the Proposed 20 Year License Extension at Palisades Nuclear Power Plant ML0609000432006-03-20020 March 2006 Comment (1) of Ruben Dal Monte P.E., on NUREG 1437, Supplement 27 Draft, Re Generic Environmental Impact Statement for License Renewal of Nuclear Plants Regarding Palisades Nuclear Plant; Draft Report for Comments, Us NRC February 2006 ML0616502572006-02-23023 February 2006 Comment (15) of Connie & Jim Mcallister on Public Meeting to Discuss Draft Environmental Impact Statement for Palisades Nuclear Plant 2022-12-29
[Table view] |
Text
Page 1 of 2 7--J-(, As of: October 31, 2014 Received:
October 30, 2014 Status: Pending_ Post PUBLIC SUBMISSION Tracking No. ljy-8f80-rg6t Comments Due: October 34 Submission Type: Web Docket: NRC-2014-0207 Biweekly Notice: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations 1 0,.2014 Comment On: NRC-2014-0207-0001 Applications and Amendments to Facility Operating Licenses and Combined Licenses Hazards Considerations Document:
NRC-2014-0207-DRAFT-0002 Comment on FR Doc # 2014-23015 No Significant Submitter Information Name: Michael Keegan Address: P.O. Box 463 Monroe, MI, 48161 Email: mkeeganj @comcast.net Submitter's Representative:
Michael J. Keegan Organization:
Don't Waste Michigan Government Agency Type: State Government Agency: NGO 171 0i-~w rn-~m O~)General Comment
Dear NRC Docketing,
Don't Waste Michigan goes on record in opposition to the proposed Palisades, License Amendment Request to Implement 10 CFR 50.61 a, "Alternate Fracture Toughness Requirements for Protection Against Pressurized Thermal Shock Events." dated 7/29/2014.
Palisades is the most embrittled nuclear power plant in the nation. Palisades Entergy, LLC is currently operating with a chunk of metal stuck in the bottom of the reactor. The Palisades nuclear facility is compromised in a multitude of ways that are well known and yet, unaddressed by Utility and NRC and with work is deferred.To the best of our records, Palisades exceeded technical specification regarding Pressurized Thermal Shock in 1981. Since that time standards have been pencil whipped 7 times by the NRC and methodologies have been switched out. Each time Palisades exceeds embrittlement
/ PTS standards, the NRC has rolled those standards https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648190cd6f&for...
10/31/2014 Page 2 of 2 back. The NRC oversight has been inadequate.
If the Palisades reactor vessel fails due to PTS it will not be an accident.
It will be the probable outcome to a set of circumstances which the NRC has tolerated for decades at great peril to the public. The public has no confidence in the NRC knowing what they are doing. This has become a jobs program for the NRC, perpetually kicking the proverbial can down the road with fingers crossed until it is time to retire. Stop twisting this Tiger by the tail.Don't Waste Michigan requests that the NRC not issue a License Amendment to Palisades Entergy LLC.Thank you Michael J. Keegan Don't Waste Michigan P.O. Box 463 Monroe, MI 48161 mkeeganj @comcast.net https://www.fdms.gov/fdms-web-agency/component/contentstreamer?objectld=090000648190cd6f&for...
10/31/2014