ML15230A184: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[JAFP-15-0103, James A. FitzPatrick - Transmittal of Core Operating Limits Report, Revision 29 (Cycle 22)]]
| number = ML15230A184
| issue date = 08/18/2015
| title = James A. FitzPatrick - Transmittal of Core Operating Limits Report, Revision 29 (Cycle 22)
| author name = Adner C M
| author affiliation = Entergy Nuclear Northeast, Entergy Nuclear Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000333
| license number = DPR-059
| contact person =
| case reference number = JAFP-15-0103
| package number = ML15230A183
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:Proprietary Information Withhold Per 10 CFR 2.390
* JAFP-15-0103 August18,2015 United States Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
 
==Subject:==
 
Core Operating Limits Report, Revision 29 (Cycle 22) James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059
 
==Dear Sir or Madam,==
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc. James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 TAI 11 S-142-1840 Chris A. Adner Regulatory Assurance Manager -JAF Enclosed is Revision 29 to the James A. FitzPatrick (JAF) Core Operating Limits Report (COLR). This revision incorporates analyses that evaluated the impacts of the Cycle 22 elevated 38-39 Fuel Support Casting (FSC) into the 3DM core monitoring model due to changes in inlet orifice loss coefficients and increased bypass flow. This is submitted in accordance with JAF Technical Specifications (TS) 5.6.5. Enclosure 1 contains proprietary information.
Global Nuclear Fuel (GNF), as the owner of the proprietary information, has executed the enclosed affidavit.
It identifies which information should be handled as proprietary.
Entergy hereby requests that Enclosure 1 be withheld from public disclosure in accordance with the provisions of 1 O CFR 2.390 and 9.17. A proprietary version of the documentation is provided in Enclosure
: 2. There are no commitments contained in this report. Questions concerning this report may be addressed to Mr. Steve DeFillippo, (315) 349-6455.
WttL Chris A. Adner Regulatory Assurance Manager CA/mh
 
==Enclosure:==
: 1. Core Operating Limits Report, Revision 29 (Proprietary)
: 2. Core Operating Limits Report, Revision 29 (Non-Proprietary) cc: next page Enclosure 1 to this letter contains Proprietary Information that should be withheld from public disclosure per 10 CFR 2.390. When separated from Enclosure 1 there are no applicable withholding criteria.
Proprietary Information Withhold Per 10 CFR 2.390 JAFP-15-0103 Page 2 of 2  to this letter contains Proprietary Information that should be withheld from public disclosure per 10 CFR 2.390. When separated from Enclosure 1 there are no applicable
 
withholding criteria.
cc: (w/out enclosure)
Regional Administrator, NRC Region 1 Mr. Douglas V. Pickett, NRC Senior Project Manager
 
NRC Resident Inspector, JAFNPP
 
Mr. John Rhodes, President and CEO, NYSERDA
 
Ms. Bridget Frymire, New York State Dept. of Public Service
 
Document Components 00 Cover Letter, JAFP-15-0103 01 COLR, Rev 29 (Proprietary) 02 COLR, Rev 29 (Non-Proprietary)}}

Revision as of 00:37, 9 July 2018