ENS 58069: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 22: Line 22:
This actuation was not in response to an actual engineered safety feature (ESF) condition and does not meet the criteria for a valid ESF actuation. This event is being reported as a 60-day report in accordance with 10 CFR 50.73(a)(1) for an invalid actuation of the EFW System.  
This actuation was not in response to an actual engineered safety feature (ESF) condition and does not meet the criteria for a valid ESF actuation. This event is being reported as a 60-day report in accordance with 10 CFR 50.73(a)(1) for an invalid actuation of the EFW System.  
The NRC Senior Resident Inspector has been notified.
The NRC Senior Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251204en.html#en58069
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251205en.html#en58069
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 07:20, 5 December 2025

ENS 58069 +/-
Where
Summer South Carolina Electric & Gas Company icon.png
South Carolina (NRC Region 2)
Reporting
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation
Time - Person (Reporting Time:+1460.63 h60.86 days <br />8.694 weeks <br />2.001 months <br />)
Opened: Justin Bouknight
12:26 Dec 3, 2025
NRC Officer: Karen Cotton
Last Updated: Dec 3, 2025
58069 - NRC Website
Loading map...