=Text=
{{#Wiki_filter:Entergy Operations, Inc.River Bend Station5485 U.S. Highway 61NSt. Francisville, LA 70775En ter 7 Tel 225-381-4177 Joseph A. ClarkManager-Licensing RBG- 47395October 2, 2013U. S. Nuclear Regulatory Commission Document Control DeskWashington, DC 20555
==Subject:==
Notification of Deviation from BWRVIP-183 River Bend Station -Unit 1Docket No. 50-458License No. NPF-47This letter provides notification of a deviation from the Boiling Water Reactor Vessel andInternals Project (BWRVIP) guidelines for River Bend Station.
This is a deviation from theperformance of inspection in accordance with the examination schedules of BWRVIP-183, "BWR Vessel and Internals
: Project, Top Guide Grid Beam Inspection and Flaw Evaluation Guidelines,"
(EPRI Report 1013401, December 2007).This is a deviation from a "needed" element of the BWRVIP program to perform inspections in accordance with the guidance of BWRVIP-183.
BWRVIP-183 requires an inspection ofthe top guide rim area and two cells every six years and implementation of this inspection should have been completed by Refuel Outage16 (2011). It was discovered that this topguide inspection has not been completed to date at River Bend. The inspection has beenscheduled for the next refuel outage which is Refuel Outage 18 (2015).This deviation from the BWRVIP guidelines has been reviewed and approved in accordance with Entergy procedures and NEI 03-08 guidance.
This is a notification of deviation only, andno action is being requested from the NRC.The attachment to this letter provides a summary of the regulatory commitment made in thissubmittal.
AJ??oC RBG-47395 Page 2 of 2Should you have any questions regarding this deviation, please contact me at (225) 381-4177.Sin IJoseph A. ClarkManager -Licensing RBF1-13-0121 Attachment List of Regulatory Commitments cc: Regional Administrator U. S. Nuclear Regulatory Commission Region IV1600 E. Lamar Blvd.Arlington, TX 76011-4511 NRC Senior Resident Inspector P. 0. Box 1050St. Francisville, LA 70775U. S. Nuclear Regulatory Commission Attn: Mr. Alan WangMS 0-8B1One White Flint North11555 Rockville PikeRockville, MD 20852Louisiana Department of Environmental QualityOffice of Environmental Compliance Radiological Emergency Planning and Response SectionJiYoung WileyP. O. Box 4312Baton Rouge, LA 70821-4312 Public Utility Commission of TexasAttn: PUC Filing Clerk1701 N. Congress AvenueP. O. Box 13326Austin, TX 78711-3326 Attachment RBG-47395 List of Regulatory Commitments RBG-47395 Attachment toPage 1 of 1List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document.
Anyother statements in this submittal are provided for information purposes and are notconsidered to be regulatory commitments.
TYPE(Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATEACTIONThe inspection has been scheduled for the next X RF-18refuel outage which is Refuel Outage 18 (Spring 2015)
OUTGOING CORRESPONDENCE CHECKLIST
: 1. Verify transmittal and document is in accordance with Preparation/Acceptance Stds2. Retrieve yellow folder & Outgoing Checklist
: 3. Numbers RBFI -RBG -Verify that the corlog & correspondence issue log have the correct information
: 4. Make Label {RBF #, RBG, subject}5. Make CopiesCopies will be mailed to the individuals listed in the cc: section of letter.Addressee of the letter gets the original.
{W/O on the cc: list means without attachments}
: 6. 1. Scan 2. Rename to RBG# 3. MOVE to my F: drive 4. Paper capture 5. COPY to the ( N or L drive)6. Rename to the RBFI # (example:
1120120)N:llrs docsllicrbgslpdfsll12xxr.--doc ORSecurity Related Letter L:I12rbfll2Ol2 Security Confidential OROperator Confidential Letter L:l12rbfl12012 Operator Confidential
: 7. ElogMake entry into the electronic log of the Licensing Research System (LRS)8. Email EngineerNotify Licensing Lead that the Letter is in the Elog for review9. EmailSend electronic copy to the following distribution
& attach letter from the N: or L: drive(as appropriate):
{this list will change as position are vacated & refilled}
EXCEPTION:
Ops Confidential
& Security Confidential (see outgoing distribution list for these}Eric Olson Donna Fancher Richard GadboisJerry Roberts Bryan Ford Roger PersonsJoey Clark John McCannMike Boyle Charlene Faison10. Retrieve indexing guides and enter the letter into eB following the guide /Import Image11. Get document independent verified.
: 12. File original letter in the cabinet.
{ensure is filed in the PPI cabinet}J:1LicAIdmn1nOutgoing Correspondence Checklistdoc 10/23/2012}}

Revision as of 23:38, 3 July 2018

River Bend Station, Unit 1 - Notification of Deviation from BWRVIP-183
ML13281A802
Person / Time
Site: River Bend 
Issue date: 10/02/2013
From: Clark J A
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG- 47395
Download: ML13281A802 (5)


Text

Entergy Operations, Inc.River Bend Station5485 U.S. Highway 61NSt. Francisville, LA 70775En ter 7 Tel 225-381-4177 Joseph A. ClarkManager-Licensing RBG- 47395October 2, 2013U. S. Nuclear Regulatory Commission Document Control DeskWashington, DC 20555

Subject:

Notification of Deviation from BWRVIP-183 River Bend Station -Unit 1Docket No. 50-458License No. NPF-47This letter provides notification of a deviation from the Boiling Water Reactor Vessel andInternals Project (BWRVIP) guidelines for River Bend Station.

This is a deviation from theperformance of inspection in accordance with the examination schedules of BWRVIP-183, "BWR Vessel and Internals

Project, Top Guide Grid Beam Inspection and Flaw Evaluation Guidelines,"

(EPRI Report 1013401, December 2007).This is a deviation from a "needed" element of the BWRVIP program to perform inspections in accordance with the guidance of BWRVIP-183.

BWRVIP-183 requires an inspection ofthe top guide rim area and two cells every six years and implementation of this inspection should have been completed by Refuel Outage16 (2011). It was discovered that this topguide inspection has not been completed to date at River Bend. The inspection has beenscheduled for the next refuel outage which is Refuel Outage 18 (2015).This deviation from the BWRVIP guidelines has been reviewed and approved in accordance with Entergy procedures and NEI 03-08 guidance.

This is a notification of deviation only, andno action is being requested from the NRC.The attachment to this letter provides a summary of the regulatory commitment made in thissubmittal.

AJ??oC RBG-47395 Page 2 of 2Should you have any questions regarding this deviation, please contact me at (225) 381-4177.Sin IJoseph A. ClarkManager -Licensing RBF1-13-0121 Attachment List of Regulatory Commitments cc: Regional Administrator U. S. Nuclear Regulatory Commission Region IV1600 E. Lamar Blvd.Arlington, TX 76011-4511 NRC Senior Resident Inspector P. 0. Box 1050St. Francisville, LA 70775U. S. Nuclear Regulatory Commission Attn: Mr. Alan WangMS 0-8B1One White Flint North11555 Rockville PikeRockville, MD 20852Louisiana Department of Environmental QualityOffice of Environmental Compliance Radiological Emergency Planning and Response SectionJiYoung WileyP. O. Box 4312Baton Rouge, LA 70821-4312 Public Utility Commission of TexasAttn: PUC Filing Clerk1701 N. Congress AvenueP. O. Box 13326Austin, TX 78711-3326 Attachment RBG-47395 List of Regulatory Commitments RBG-47395 Attachment toPage 1 of 1List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document.

Anyother statements in this submittal are provided for information purposes and are notconsidered to be regulatory commitments.

TYPE(Check one) SCHEDULED ONE- CONTINUING COMPLETION COMMITMENT TIME COMPLIANCE DATEACTIONThe inspection has been scheduled for the next X RF-18refuel outage which is Refuel Outage 18 (Spring 2015)

OUTGOING CORRESPONDENCE CHECKLIST

1. Verify transmittal and document is in accordance with Preparation/Acceptance Stds2. Retrieve yellow folder & Outgoing Checklist
3. Numbers RBFI -RBG -Verify that the corlog & correspondence issue log have the correct information
4. Make Label {RBF #, RBG, subject}5. Make CopiesCopies will be mailed to the individuals listed in the cc: section of letter.Addressee of the letter gets the original.

{W/O on the cc: list means without attachments}

6. 1. Scan 2. Rename to RBG# 3. MOVE to my F: drive 4. Paper capture 5. COPY to the ( N or L drive)6. Rename to the RBFI # (example:

1120120)N:llrs docsllicrbgslpdfsll12xxr.--doc ORSecurity Related Letter L:I12rbfll2Ol2 Security Confidential OROperator Confidential Letter L:l12rbfl12012 Operator Confidential

7. ElogMake entry into the electronic log of the Licensing Research System (LRS)8. Email EngineerNotify Licensing Lead that the Letter is in the Elog for review9. EmailSend electronic copy to the following distribution

& attach letter from the N: or L: drive(as appropriate):

{this list will change as position are vacated & refilled}

EXCEPTION:

Ops Confidential

& Security Confidential (see outgoing distribution list for these}Eric Olson Donna Fancher Richard GadboisJerry Roberts Bryan Ford Roger PersonsJoey Clark John McCannMike Boyle Charlene Faison10. Retrieve indexing guides and enter the letter into eB following the guide /Import Image11. Get document independent verified.

12. File original letter in the cabinet.

{ensure is filed in the PPI cabinet}J:1LicAIdmn1nOutgoing Correspondence Checklistdoc 10/23/2012