ML14279A147: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 14: | Line 14: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:II II II I . ! I I ; I . I II i! I. I I I BOARD OF SUPERVISORS 1055 MONTEREY, ROOM D430 | |||
* SAN LUIS 0BlSPO, CALIFORNIA 93408-1003 | |||
* 805.781.5450 September 19, 20.14 U.S. Nuclear Regulatory Commission Mail Stop 0-16G4 Washington, DC 20555-0001 RE: Diablo Canyon Power Plant Hazard Analyses | |||
==Dear Dr. Macfarlane:== | |||
DEBBIE ARNOLD SUPERVISOR DISTRICT FIVE In recent weeks, we have been informed of reports regarding the natural hazards that might affect the safe operation of the Diablo Canyon Power Plant {DCCP) located in San Luis Obispo County. Specifically, it has come to my attention that a tsunami hazard analysis by Dr. Robert Sewell was recently reviewed by NRC staff. I have heard from various constituents representing local advocacy groups during the public comment period of our recent County Board of Supervisors meetings that the NRC has refused to publicly disclose the findings of this report. I would like to respectfully request that the tsunami hazard study by Dr. Sewell be made available to the public for their review as soon as possible. Thank you for your time and consideration. Sincerely, Debbie Arnold Supervisor, 5th District}} |
Revision as of 12:45, 26 June 2018
ML14279A147 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 09/19/2014 |
From: | Arnold D City of San Luis Obispo, CA, Board of Supervisors |
To: | Macfarlane A M NRC/Chairman, NRC/OIS/CSD/FPIB |
References | |
FOIA/PA-2015-0013 | |
Download: ML14279A147 (1) | |
Text
II II II I . ! I I ; I . I II i! I. I I I BOARD OF SUPERVISORS 1055 MONTEREY, ROOM D430
- SAN LUIS 0BlSPO, CALIFORNIA 93408-1003
- 805.781.5450 September 19, 20.14 U.S. Nuclear Regulatory Commission Mail Stop 0-16G4 Washington, DC 20555-0001 RE: Diablo Canyon Power Plant Hazard Analyses
Dear Dr. Macfarlane:
DEBBIE ARNOLD SUPERVISOR DISTRICT FIVE In recent weeks, we have been informed of reports regarding the natural hazards that might affect the safe operation of the Diablo Canyon Power Plant {DCCP) located in San Luis Obispo County. Specifically, it has come to my attention that a tsunami hazard analysis by Dr. Robert Sewell was recently reviewed by NRC staff. I have heard from various constituents representing local advocacy groups during the public comment period of our recent County Board of Supervisors meetings that the NRC has refused to publicly disclose the findings of this report. I would like to respectfully request that the tsunami hazard study by Dr. Sewell be made available to the public for their review as soon as possible. Thank you for your time and consideration. Sincerely, Debbie Arnold Supervisor, 5th District