{{#Wiki_filter:U.S. Nuclear Regulatory Commission RIC   2024   Hybrid             36thAnnual Regulatory Information Conference
{{#Wiki_filter:U.S. Nuclear Regulatory Commission RIC 2024 Hybrid 36thAnnual Regulatory Information Conference


ADAPTING       TO A CHANGING LANDSCAPE MARCH 12-14, 2024 Bethesda North Marriott Hotel and Conference Center Rockville, Maryland
ADAPTING TO A CHANGING LANDSCAPE MARCH 12-14, 2024 Bethesda North Marriott Hotel and Conference Center Rockville, Maryland
                                        #nrcric2024       www.nrc.gov RIC   2024     Hybrid                                             MARCH 12-14, 2024
#nrcric2024 www.nrc.gov RIC 2024 Hybrid MARCH 12-14, 2024


U.S. Nuclear Regulatory Commission                                                     #nrcric2024 36thAnnual Regulatory Information Conference                                           www.nrc.gov
U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov


Draft Interim Staff Guidance (ISG)
Draft Interim Staff Guidance (ISG)
DUWP-ISG-02, Radiological Surveys and Dose Modeling of the Subsurface to Support License Termination Extends NUREG-1575, Multi-                             Agency                     Image Credit: E. Darois (ML22136A164)
DUWP-ISG-02, Radiological Surveys and Dose Modeling of the Subsurface to Support License Termination Extends NUREG-1575, Multi-Agency Image Credit: E. Darois (ML22136A164)
Radiation Sur vey and Site Investigation, (MARSSIM) to the subsurface, addressing surveys of open excavations, reactor basement substructures, and materials planned for reuse, among other topics
Radiation Sur vey and Site Investigation, (MARSSIM) to the subsurface, addressing surveys of open excavations, reactor basement substructures, and materials planned for reuse, among other topics


Image Credit: DUWP-ISG         -02, Figure 2.9
Image Credit: DUWP-ISG -02, Figure 2.9


ADAPTING   TO A CHANGING LANDSCAPE RIC   2024     Hybrid                                           MARCH 12-14, 2024
ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024


U.S. Nuclear Regulatory Commission                                               #nrcric2024 36thAnnual Regulatory Information Conference                                     www.nrc.gov
U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov


DUWP-ISG-02Alternative Sampling and Survey Methods
DUWP-ISG-02Alternative Sampling and Survey Methods


Includes guidance on use of in situ gamma spectroscopy for radiological sur veys, including final status sur veys
Includes guidance on use of in situ gamma spectroscopy for radiological sur veys, including final status sur veys


Image Credit: DUWP-ISG-02, Figure 2.7.
Image Credit: DUWP-ISG-02, Figure 2.7.


ADAPTING   TO A CHANGING LANDSCAPE RIC   2024     Hybrid                                         MARCH 12-14, 2024
ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024


U.S. Nuclear Regulatory Commission                                               #nrcric2024 36thAnnual Regulatory Information Conference                                     www.nrc.gov
U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov


DUWP-ISG-02Dose Modeling for Existing Groundwater Contamination Addresses guidance gaps regarding adequacy of groundwater monitoring networks and assessment of risk from existing groundwater contamination
DUWP-ISG-02Dose Modeling for Existing Groundwater Contamination Addresses guidance gaps regarding adequacy of groundwater monitoring networks and assessment of risk from existing groundwater contamination
Line 46: Line 46:
Image Credit: Fort Calhoun License Termination Plan, Figure 1-7
Image Credit: Fort Calhoun License Termination Plan, Figure 1-7


ADAPTING   TO A CHANGING LANDSCAPE RIC   2024     Hybrid                                         MARCH 12-14, 2024
ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024


U.S. Nuclear Regulatory Commission                                               #nrcric2024 36thAnnual Regulatory Information Conference                                     www.nrc.gov
U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov


DUWP-ISG-02Dose Modeling for Unsubmerged and Submerged Sources Addresses guidance gaps for application of commonly used decommissioning dose modeling codes to develop cleanup levels for unsubmerged and submerged sources, including basement substructures
DUWP-ISG-02Dose Modeling for Unsubmerged and Submerged Sources Addresses guidance gaps for application of commonly used decommissioning dose modeling codes to develop cleanup levels for unsubmerged and submerged sources, including basement substructures


Image Credit: DUWP-ISG-02, Figure 3.5 (modified from RESRAD training slide)
Image Credit: DUWP-ISG-02, Figure 3.5 (modified from RESRAD training slide)
ADAPTING   TO A CHANGING LANDSCAPE RIC       2024         Hybrid                                                                       MARCH 12-14, 2024
ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024


U.S. Nuclear Regulatory Commission                                                                                                 #nrcric2024 36thAnnual Regulatory Information Conference                                                                                     www.nrc.gov
U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov


DUWP-ISG-02Public Comments
DUWP-ISG-02Public Comments


Issued October 19, 2023, with a 60-day public comment period (88 FR 72112)
Issued October 19, 2023, with a 60-day public comment period (88 FR 72112)
Comments were due December 18, 2023 12 comments were received, including the following:
Comments were due December 18, 2023 12 comments were received, including the following:
: 1.                                                                           Level of survey needed for reuse of offsite materials
: 1. Level of survey needed for reuse of offsite materials
: 2.                                                                           Survey of low-risk or small excavations
: 2. Survey of low-risk or small excavations
: 3.                                                                           Need for and nature of site-specific support for risk-Image Credit: DUWP-ISG-02, Figure 3.10 significant parameters
: 3. Need for and nature of site-specific support for risk-Image Credit: DUWP-ISG-02, Figure 3.10 significant parameters
: 4.                                                                 Adding realism to assessment of risk from existing groundwater contamination
: 4. Adding realism to assessment of risk from existing groundwater contamination


ADAPTING   TO A CHANGING LANDSCAPE RIC     2024       Hybrid                                                 MARCH 12-14, 2024
ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024


U.S. Nuclear Regulatory Commission                                                             #nrcric2024 36thAnnual Regulatory Information Conference                                                 www.nrc.gov
U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov


DUWP-ISG-02Next Steps Publication of the final DUWP-                                 ISG-02 is anticipated in late summer 2024; comment responses will accompany the final document The final DUWP-                                 ISG-02 will be incorporated into the next revision of NUREG-1757, Volume 2 The NRC is separately updating NUREG/CR -7021 and Visual Sample Plan under contracts with ORNL and PNNL, respectively (see the draft ISG for more information on planned updates)                                                           Image Credit: DUWP-ISG-02, Figure B.1
DUWP-ISG-02Next Steps Publication of the final DUWP-ISG-02 is anticipated in late summer 2024; comment responses will accompany the final document The final DUWP-ISG-02 will be incorporated into the next revision of NUREG-1757, Volume 2 The NRC is separately updating NUREG/CR -7021 and Visual Sample Plan under contracts with ORNL and PNNL, respectively (see the draft ISG for more information on planned updates) Image Credit: DUWP-ISG-02, Figure B.1


You can find the draft ISG and other related reports on the NRC s What's New in Decommissioning     website
You can find the draft ISG and other related reports on the NRC s What's New in Decommissioning website


ADAPTING   TO A CHANGING LANDSCAPE RIC   2024   Hybrid                                   MARCH 12-14, 2024
ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024


U.S. Nuclear Regulatory Commission                                   #nrcric2024 36thAnnual Regulatory Information Conference                         www.nrc.gov
U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov


Contact Information
Contact Information
Line 84: Line 84:
Randall Fedors, NRC/NMSS Randall.Fedors@nrc.gov
Randall Fedors, NRC/NMSS Randall.Fedors@nrc.gov


Special thanks to NMSS/DUWP management: Chris McKenney, Shaun Anderson, Bruce Watson, and Jane Marshall for their guidance and support
Special thanks to NMSS/DUWP management: Chris McKenney, Shaun Anderson, Bruce Watson, and Jane Marshall for their guidance and support


ADAPTING   TO A CHANGING LANDSCAPE}}
ADAPTING TO A CHANGING LANDSCAPE}}

Revision as of 10:23, 5 October 2024

RIC 2024 Barr Abstract 9 Digital Exhibit ISG DUWP-ISG-02
ML24081A088
Person / Time
Issue date: 03/12/2024
From: Cynthia Barr
NRC/NMSS/DDUWP/RTAB
To:
References
Download: ML24081A088 (8)


Text

U.S. Nuclear Regulatory Commission RIC 2024 Hybrid 36thAnnual Regulatory Information Conference

ADAPTING TO A CHANGING LANDSCAPE MARCH 12-14, 2024 Bethesda North Marriott Hotel and Conference Center Rockville, Maryland

  1. nrcric2024 www.nrc.gov RIC 2024 Hybrid MARCH 12-14, 2024

U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov

Draft Interim Staff Guidance (ISG)

DUWP-ISG-02, Radiological Surveys and Dose Modeling of the Subsurface to Support License Termination Extends NUREG-1575, Multi-Agency Image Credit: E. Darois (ML22136A164)

Radiation Sur vey and Site Investigation, (MARSSIM) to the subsurface, addressing surveys of open excavations, reactor basement substructures, and materials planned for reuse, among other topics

Image Credit: DUWP-ISG -02, Figure 2.9

ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024

U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov

DUWP-ISG-02Alternative Sampling and Survey Methods

Includes guidance on use of in situ gamma spectroscopy for radiological sur veys, including final status sur veys

Image Credit: DUWP-ISG-02, Figure 2.7.

ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024

U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov

DUWP-ISG-02Dose Modeling for Existing Groundwater Contamination Addresses guidance gaps regarding adequacy of groundwater monitoring networks and assessment of risk from existing groundwater contamination

Image Credit: Fort Calhoun License Termination Plan, Figure 1-7

ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024

U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov

DUWP-ISG-02Dose Modeling for Unsubmerged and Submerged Sources Addresses guidance gaps for application of commonly used decommissioning dose modeling codes to develop cleanup levels for unsubmerged and submerged sources, including basement substructures

Image Credit: DUWP-ISG-02, Figure 3.5 (modified from RESRAD training slide)

ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024

U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov

DUWP-ISG-02Public Comments

Issued October 19, 2023, with a 60-day public comment period (88 FR 72112)

Comments were due December 18, 2023 12 comments were received, including the following:

1. Level of survey needed for reuse of offsite materials
2. Survey of low-risk or small excavations
3. Need for and nature of site-specific support for risk-Image Credit: DUWP-ISG-02, Figure 3.10 significant parameters
4. Adding realism to assessment of risk from existing groundwater contamination

ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024

U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov

DUWP-ISG-02Next Steps Publication of the final DUWP-ISG-02 is anticipated in late summer 2024; comment responses will accompany the final document The final DUWP-ISG-02 will be incorporated into the next revision of NUREG-1757, Volume 2 The NRC is separately updating NUREG/CR -7021 and Visual Sample Plan under contracts with ORNL and PNNL, respectively (see the draft ISG for more information on planned updates) Image Credit: DUWP-ISG-02, Figure B.1

You can find the draft ISG and other related reports on the NRC s What's New in Decommissioning website

ADAPTING TO A CHANGING LANDSCAPE RIC 2024 Hybrid MARCH 12-14, 2024

U.S. Nuclear Regulatory Commission #nrcric2024 36thAnnual Regulatory Information Conference www.nrc.gov

Contact Information

Cynthia Barr, NRC/NMSS Cynthia.Barr@nrc.gov

Randall Fedors, NRC/NMSS Randall.Fedors@nrc.gov

Special thanks to NMSS/DUWP management: Chris McKenney, Shaun Anderson, Bruce Watson, and Jane Marshall for their guidance and support

ADAPTING TO A CHANGING LANDSCAPE