{{#Wiki_filter:[7590-                                                                                       01-P]
{{#Wiki_filter:[7590- 01-P]


NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION


[Docket Nos. 72-78,                                           50-                                           317, and 50-                                                                                                                         318; NRC-                                                                                     2024-                                                                 0085]
[Docket Nos. 72-78, 50- 317, and 50- 318; NRC-2024- 0085]


Constellation Energy Generation, LLC.;
Constellation Energy Generation, LLC.;
Line 40: Line 40:
environmental assessment (EA) and a finding of no significant impact (FONSI) for an
environmental assessment (EA) and a finding of no significant impact (FONSI) for an


exemption request submitted by Constellation         Energy Generation, LLC (Constellation)
exemption request submitted by Constellation Energy Generation, LLC (Constellation)


that would permit Calvert Cliffs Nuclear Power Plant (CCNPP) to maintain nine loaded
that would permit Calvert Cliffs Nuclear Power Plant (CCNPP) to maintain nine loaded


and to load                                                                 six new 37           multi-purpose canisters                   (MPC) with continuous basket shims
and to load six new 37 multi-purpose canisters (MPC) with continuous basket shims


(CBS) in the                                             HI-STORM Flood/Wind (FW) MPC Storage System at its CCNPP Units                     1
(CBS) in the HI-STORM Flood/Wind (FW) MPC Storage System at its CCNPP Units 1


and 2 Independent Spent Fuel Storage Installation (ISFSI) in           a storage condition where
and 2 Independent Spent Fuel Storage Installation (ISFSI) in a storage condition where


the terms, conditions, and specifications in the Certificate of Compliance (CoC)         No.
the terms, conditions, and specifications in the Certificate of Compliance (CoC) No.


1032,                                                                                         Amendment No. 1         , Revision No. 1, are not met.
1032, Amendment No. 1, Revision No. 1, are not met.


DATES: The EA                                                     and FONSI referenced in this document are available on                                                                           May 20, 2024.
DATES: The EA and FONSI referenced in this document are available on May 20, 2024.


ADDRESSES: Please refer to Docket ID NRC-                                                                                               2024-                                           0085                                                                                       when contacting the NRC
ADDRESSES: Please refer to Docket ID NRC-2024- 0085 when contacting the NRC


about the availability of information regarding this document. You may obtain publicly
about the availability of information regarding this document. You may obtain publicly


available information related to this document using any of the following methods:
available information related to this document using any of the following methods:
* Federal Rulemaking Webs                                             ite: Go to https://www.regulations.gov and
* Federal Rulemaking Webs ite: Go to https://www.regulations.gov and


search for Docket ID NRC-2024-                                                                                       0085. Address questions about D                                                                                                 ocket IDs in
search for Docket ID NRC-2024- 0085. Address questions about D ocket IDs in


Regulations.gov to Stacy Schumann; telephone: 301-415-                                                                 0624; email:
Regulations.gov to Stacy Schumann; telephone: 301-415- 0624; email:
Stacy.Schumann@nrc.gov                                                                 . For technical questions, contact the individual listed in the
Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the


For Further Information Contact section of this document.
For Further Information Contact section of this document.
Line 73: Line 73:
(ADAMS): You may obtain publicly available documents online in the ADAMS Public
(ADAMS): You may obtain publicly available documents online in the ADAMS Public


Documents collection at https://www.nrc.gov/reading-                                           rm/adams.html. To begin the
Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the


search, select Begin Web-                     based ADAMS Search. For problems with ADAMS, please
search, select Begin Web-based ADAMS Search. For problems with ADAMS, please


contact the NRCs Public Document Room (PDR) reference staff at 1-                             800-397-                                                                 4209, at
contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, at


301-                                                                 415-                                                                 4737, or by email to PDR.                                                                                         Resource@nrc.gov. For the convenience of the
301-415-4737, or by email to PDR. Resource@nrc.gov. For the convenience of the


reader, instructions about obtaining materials referenced in this document are provided
reader, instructions about obtaining materials referenced in this document are provided
Line 88: Line 88:
available documents, is open by appointment. To make an appointment to visit the PDR,
available documents, is open by appointment. To make an appointment to visit the PDR,


please send an email to PDR.Resource@nrc.gov or call 1-                               800-397-                                                                   4209 or 301-415-
please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-


4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except
Line 98: Line 98:
Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555;
Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555;


telephone: 301-415-                                                                 1018; email:                     Yen-Ju.Chen@nrc.gov.
telephone: 301-415-1018; email: Yen-Ju.Chen@nrc.gov.


SUPPLEMENTARY INFORMATION:
SUPPLEMENTARY INFORMATION:
Line 104: Line 104:
I. Introduction
I. Introduction


The NRC is reviewing an exemption                                           request from Constellation, dated
The NRC is reviewing an exemption request from Constellation, dated


March 22,                                           2024. Constellation is requesting an exemption                                             pursuant to section 72.7                       of
March 22, 2024. Constellation is requesting an exemption pursuant to section 72.7 of


title 10 of the Code of Federal Regulations         (10 CFR), in paragraphs 72.212(a)(2),
title 10 of the Code of Federal Regulations (10 CFR), in paragraphs 72.212(a)(2),


72.212(b)(3), 72.212(b)(5)(i), 72.212(b)(11), and 72.214                                                                 that require Constellation           to
72.212(b)(3), 72.212(b)(5)(i), 72.212(b)(11), and 72.214 that require Constellation to


comply with the terms, conditions, and specifications of the C         oC No. 1032, Amendment
comply with the terms, conditions, and specifications of the C oC No. 1032, Amendment


2 No. 1, Revision No.           1. If approved, the exemption would                     allow                             Constellation to maintain
2 No. 1, Revision No. 1. If approved, the exemption would allow Constellation to maintain


nine loaded and to load                                                                 six new MPC                                                                               CBS in the                                             HI-STORM FW MPC Storage
nine loaded and to load six new MPC CBS in the HI-STORM FW MPC Storage


System at the CCNPP ISFSI in a storage condition where the terms, conditions, and
System at the CCNPP ISFSI in a storage condition where the terms, conditions, and


specifications in the                                           CoC No. 1032         , Amendment No. 1, Revision No. 1, are not met.
specifications in the CoC No. 1032, Amendment No. 1, Revision No. 1, are not met.


II.                       Environmental Assessment
II. Environmental Assessment


===
===
Background===
Background===
 
CCNPP is located near Maryland Highway 2 -4 in Calvert County on the west
CCNPP is located near Maryland Highway 2                                                     -4 in Calvert County on the west


bank of the Chesapeake Bay, approximately halfway between the mouth of the
bank of the Chesapeake Bay, approximately halfway between the mouth of the
Line 133: Line 132:
Chesapeake Bay and its headwaters at the Susquehanna River. Unit 1 began operating
Chesapeake Bay and its headwaters at the Susquehanna River. Unit 1 began operating


in 1975 and Unit 2 began operating in 1977                               . Constellation has been storing spent fuel in
in 1975 and Unit 2 began operating in 1977. Constellation has been storing spent fuel in


an ISFSI at CCNPP           under a general license as authorized by 10 CFR p         art 72, subpart
an ISFSI at CCNPP under a general license as authorized by 10 CFR p art 72, subpart


K, General License for Storage of Spent Fuel at Power Reactor Sites. Constellation
K, General License for Storage of Spent Fuel at Power Reactor Sites. Constellation


currently uses the HI         -STORM FW MPC Storage System under CoC No. 1032,
currently uses the HI -STORM FW MPC Storage System under CoC No. 1032,


Amendment No. 1         , Revision No. 1, for dry storage of spent nuclear fuel in a specific
Amendment No. 1, Revision No. 1, for dry storage of spent nuclear fuel in a specific


MPC (i.e., MPC-37) at the CCNPP                                                                             ISFSI.
MPC (i.e., MPC-37) at the CCNPP ISFSI.


Description of the Proposed Action
Description of the Proposed Action


The CoC is the NRC approved design for each dry cask storage system       . The
The CoC is the NRC approved design for each dry cask storage system. The


proposed action would exempt the applicant from the requirements of
proposed action would exempt the applicant from the requirements of


10                                             CFR                           72.212(a)(2), 72.212(b)(3), 72.212(b)(5)(i), 72.212(b)(11), and 72.214 only as
10 CFR 72.212(a)(2), 72.212(b)(3), 72.212(b)(5)(i), 72.212(b)(11), and 72.214 only as


these requirements pertain to the use of the MPC                                           CBS in the           HI-STORM FW MPC
these requirements pertain to the use of the MPC CBS in the HI-STORM FW MPC


Storage System for the already loaded systems and the near-term planned loading of
Storage System for the already loaded systems and the near-term planned loading of


the canisters. The exemption would allow                                 Constellation to maintain nine loaded and to
the canisters. The exemption would allow Constellation to maintain nine loaded and to


load                                                                 six new MPC                                           CBS in the           HI-STORM FW MPC Storage System at the CCNPP
load six new MPC CBS in the HI-STORM FW MPC Storage System at the CCNPP


ISFSI, despite the MPC                                                   CBS in the           HI-STORM FW MPC Storage System not being
ISFSI, despite the MPC CBS in the HI-STORM FW MPC Storage System not being


3 in compliance with the terms         , conditions, and specifications in the CoC No. 1032         ,
3 in compliance with the terms, conditions, and specifications in the CoC No. 1032,


Amendment No. 1         , Revision                                                     No. 1.
Amendment No. 1, Revision No. 1.


The HI-STORM FW MPC Storage System CoC provides the requirements,
The HI-STORM FW MPC Storage System CoC provides the requirements,
Line 171: Line 170:
conditions, and operating limits necessary for use of the system to store spent fuel.
conditions, and operating limits necessary for use of the system to store spent fuel.


Holtec International (Holtec), the designer and manufacturer of the HI       -STORM FW MPC
Holtec International (Holtec), the designer and manufacturer of the HI -STORM FW MPC


Storage System, developed a variant of the design with CBS for the MPC-37, known as
Storage System, developed a variant of the design with CBS for the MPC-37, known as


MPC                                           CBS. Holtec originally implemented the CBS variant design under the
MPC CBS. Holtec originally implemented the CBS variant design under the


provisions of 10 CFR 72.48, which allows licensees to make changes to cask designs
provisions of 10 CFR 72.48, which allows licensees to make changes to cask designs


without a CoC                           amendment under certain conditions (listed in 10                                                                             CFR 72.48(c)). After
without a CoC amendment under certain conditions (listed in 10 CFR 72.48(c)). After


evaluating the specific changes to the cask designs, the NRC determined that Holtec
evaluating the specific changes to the cask designs, the NRC determined that Holtec
Line 185: Line 184:
erred when it implemented the CBS variant design under 10 CFR 72.48, as this was not
erred when it implemented the CBS variant design under 10 CFR 72.48, as this was not


the type of change allowed without a CoC                                           amendment. For this reason, the NRC issued
the type of change allowed without a CoC amendment. For this reason, the NRC issued


three Severity Level IV violations to Holtec. Prior to the issuance of the violations,
three Severity Level IV violations to Holtec. Prior to the issuance of the violations,


Constellation had already loaded           nine MPC                                           CBS in a HI         -STORM FW MPC Storage
Constellation had already loaded nine MPC CBS in a HI -STORM FW MPC Storage


System, which are safely in storage on the CCNPP                                                     ISFSI pad. Additionally,
System, which are safely in storage on the CCNPP ISFSI pad. Additionally,


Constellation plans to load six new MPC-37-CBS in the HI         -STORM FW MPC Storage
Constellation plans to load six new MPC-37-CBS in the HI -STORM FW MPC Storage


System beginning                                           in July 2024. This exemption considers the loading of the                                           nine                                             already
System beginning in July 2024. This exemption considers the loading of the nine already


loaded systems and the near-term planned loading of the six canisters with the CBS
loaded systems and the near-term planned loading of the six canisters with the CBS
Line 203: Line 202:
Need for the Proposed Action
Need for the Proposed Action


Constellation                                           requested this exemption because Constellation is currently out of
Constellation requested this exemption because Constellation is currently out of


compliance with NRC requirements, resulting from the previous loading of spent fuel into
compliance with NRC requirements, resulting from the previous loading of spent fuel into


a storage system with         the CBS variant basket design. This exemption would allow nine
a storage system with the CBS variant basket design. This exemption would allow nine


already loaded MPC                                         CBS in the HI                                                       -STORM FW MPC Storage System to remain in
already loaded MPC CBS in the HI -STORM FW MPC Storage System to remain in


storage at the           CCNPP ISFSI. The applicant also requested the exemption                                         in order to
storage at the CCNPP ISFSI. The applicant also requested the exemption in order to


4 allow CCNPP to load six new                                                                             MPC-37-CBS in HI         -STORM FW MPC Storage System                                       at
4 allow CCNPP to load six new MPC-37-CBS in HI -STORM FW MPC Storage System at


the CCNPP ISFSI for the future loading campaign beginning         in July 2024.
the CCNPP ISFSI for the future loading campaign beginning in July 2024.


Approval of the exemption request would         allow Constellation                                           to effectively
Approval of the exemption request would allow Constellation to effectively


manage the spent fuel pool margin and capacity to enable refueling and offloading fuel
manage the spent fuel pool margin and capacity to enable refueling and offloading fuel


from the reactor. It would also allow Constellation                                           to effectively manage the availability of
from the reactor. It would also allow Constellation to effectively manage the availability of


the                                           specialized workforce and equipment needed                                                                                                 to support competing fuel loading and
the specialized workforce and equipment needed to support competing fuel loading and


operational activities at CCNPP and other Constellation sites.
operational activities at CCNPP and other Constellation sites.
Line 231: Line 230:
This EA evaluates the potential environmental impacts of granting an exemption
This EA evaluates the potential environmental impacts of granting an exemption


from the                                           terms, conditions, and specifications in CoC No. 1032         , Amendment No. 1         ,
from the terms, conditions, and specifications in CoC No. 1032, Amendment No. 1,


Revision No. 1. The exemption would allow nine         loaded MPC-37-CBS in the HI-STORM
Revision No. 1. The exemption would allow nine loaded MPC-37-CBS in the HI-STORM


FW MPC Storage System to remain loaded                                                                                                               at the CCNPP ISFSI. The exemption also
FW MPC Storage System to remain loaded at the CCNPP ISFSI. The exemption also


would allow a near                                                                                                   -term loading of six new MPC-37-CBS to be loaded in the HI                               -STORM
would allow a near -term loading of six new MPC-37-CBS to be loaded in the HI -STORM


FW MPC Storage System and maintained in storage at the CCNPP         ISFSI.
FW MPC Storage System and maintained in storage at the CCNPP ISFSI.


The potential environmental impacts of storing spent nuclear fuel in
The potential environmental impacts of storing spent nuclear fuel in


NRC-                                                                                   approved storage systems have been documented in previous assessments. On
NRC-approved storage systems have been documented in previous assessments. On


July 18, 1990, the NRC amended 10 CFR part 72 to provide for the storage of spent fuel
July 18, 1990, the NRC amended 10 CFR part 72 to provide for the storage of spent fuel
Line 253: Line 252:
casks. The EA for the HI-STORM FW MPC Storage System, CoC No. 1032,
casks. The EA for the HI-STORM FW MPC Storage System, CoC No. 1032,


Amendment No. 1         , Revision No. 1, , published in 2015, tiers off of the EA issued for the
Amendment No. 1, Revision No. 1,, published in 2015, tiers off of the EA issued for the


July 18, 1990,                                                                                       final rule.             Tiering                                               off earlier EAs is a standard process encouraged                                                                                                 by
July 18, 1990, final rule. Tiering off earlier EAs is a standard process encouraged by


the regulations implementing                                           the National Environmental Policy Act of 1969 (NEPA) that
the regulations implementing the National Environmental Policy Act of 1969 (NEPA) that


entails the use of impact analyses of previous EAs to bound the impacts of a proposed
entails the use of impact analyses of previous EAs to bound the impacts of a proposed


action                                             where appropriate. The Holtec HI           -STORM FW MPC Storage System is designed
action where appropriate. The Holtec HI -STORM FW MPC Storage System is designed


5 to mitigate the effects of design basis accidents that could occur during storage.
5 to mitigate the effects of design basis accidents that could occur during storage.
Line 273: Line 272:
not be significant.
not be significant.


The exemptions                                                               requested by Constellation at the CCNPP                               site as they relate to
The exemptions requested by Constellation at the CCNPP site as they relate to


CoC No. 1032         , Amendment No. 1         , Revision No. 1, for the HI         -STORM FW MPC Storage
CoC No. 1032, Amendment No. 1, Revision No. 1, for the HI -STORM FW MPC Storage


System are limited to the use of the CBS variant basket design                                             only for the already
System are limited to the use of the CBS variant basket design only for the already


loaded nine canisters and near-term planned loading                                             of six canisters                     utilizing the CBS
loaded nine canisters and near-term planned loading of six canisters utilizing the CBS


variant basket design.                                           The staff has determined that this change in the basket will not
variant basket design. The staff has determined that this change in the basket will not


result in either radiological or non-radiological environmental impacts that significantly
result in either radiological or non-radiological environmental impacts that significantly


differ from the environmental impacts evaluated in the EA                                                                         supporting the issuance of
differ from the environmental impacts evaluated in the EA supporting the issuance of


CoC No. 1032, Amendment No. 1         , Revision No.           1. If the exemption is granted, there will
CoC No. 1032, Amendment No. 1, Revision No. 1. If the exemption is granted, there will


be no significant change in the types or amounts of any effluents released, no significant
be no significant change in the types or amounts of any effluents released, no significant


increase in individual or cumulative                               public or occupational radiation exposure, and no
increase in individual or cumulative public or occupational radiation exposure, and no


significant increase in the potential for or consequences from radiological accidents.
significant increase in the potential for or consequences from radiological accidents.


Accordingly, the Commission concludes that there would be                                                                                         no significant environmental
Accordingly, the Commission concludes that there would be no significant environmental


impacts associated with the proposed action.
impacts associated with the proposed action.
Line 301: Line 300:
Alternative to the Proposed Action
Alternative to the Proposed Action


The staff considered the no-                                         action alternative.                     The no                                                       -action alternative (denial of
The staff considered the no-action alternative. The no -action alternative (denial of


the exemption request) would require Constellation                                                                           to unload spent fuel from the                                                                                                                         MPC-
the exemption request) would require Constellation to unload spent fuel from the MPC-


37-                                           CBS in the           HI-STORM FW MPC Storage System to bring it in compliance with the
37-CBS in the HI-STORM FW MPC Storage System to bring it in compliance with the


CoC terms, conditions, and specifications in the CoC No. 1032       , Amendment No. 1         ,
CoC terms, conditions, and specifications in the CoC No. 1032, Amendment No. 1,


Revision No. 1. Unloading the cask would subject station personnel to additional
Revision No. 1. Unloading the cask would subject station personnel to additional
Line 317: Line 316:
accident. Furthermore, the removed spent fuel would need to be placed in the spent fuel
accident. Furthermore, the removed spent fuel would need to be placed in the spent fuel


pool, where it would remain                     until approved storage casks can be fabricated and
pool, where it would remain until approved storage casks can be fabricated and


delivered to site for loading.                                           Delay in the loading of this spent fuel into other casks, as
delivered to site for loading. Delay in the loading of this spent fuel into other casks, as


well as not allowing the planned future loading campaign, could affect Constellations
well as not allowing the planned future loading campaign, could affect Constellations
Line 325: Line 324:
ability to effectively manage the spent fuel pool capacity, reactor fuel offloading, and
ability to effectively manage the spent fuel pool capacity, reactor fuel offloading, and


refueling. It                                             could also                   pose challenges to                                                                                       spent fuel heat removal and                                                                   impact the
refueling. It could also pose challenges to spent fuel heat removal and impact the


availability of the           specialized workforce and equipment needed to support         competing fuel
availability of the specialized workforce and equipment needed to support competing fuel


loading and operational activities at CCNPP         and other Constellation sites. The NRC has
loading and operational activities at CCNPP and other Constellation sites. The NRC has


determined that the no-                                                     action alternative would result in undue potential human health
determined that the no-action alternative would result in undue potential human health


and safety impacts that could be avoided by proceeding with the proposed exemption                 ,
and safety impacts that could be avoided by proceeding with the proposed exemption,


especially given that the staff has concluded in         NRCs Safety Determination
especially given that the staff has concluded in NRCs Safety Determination


Memorandum, issued with respect to the enforcement action against Holtec regarding
Memorandum, issued with respect to the enforcement action against Holtec regarding


these                       violations, that fuel can be stored safety in the MPC         CBS canisters.
these violations, that fuel can be stored safety in the MPC CBS canisters.


Agencies Consulted
Agencies Consulted
Line 345: Line 344:
The NRC provided the Maryland Department of Natural Resources (MDNR) a
The NRC provided the Maryland Department of Natural Resources (MDNR) a


copy of this draft EA for review by an email dated April 29, 2024. On                                             May 9, 2024,
copy of this draft EA for review by an email dated April 29, 2024. On May 9, 2024,


MDNR                                                                                     provided its concurrence by email.
MDNR provided its concurrence by email.


III. Finding of No Significant Impact
III. Finding of No Significant Impact
Line 357: Line 356:
upon the foregoing EA, the NRC finds that the proposed action of granting the
upon the foregoing EA, the NRC finds that the proposed action of granting the


exemption from the regulations in                               10 CFR 72.212(a)(2), 72.212(b)(3), 72.212(b)(5)(i),
exemption from the regulations in 10 CFR 72.212(a)(2), 72.212(b)(3), 72.212(b)(5)(i),


72.212(b)(11) and 72.214,           which require the licensee to                                                       comply with the terms,
72.212(b)(11) and 72.214, which require the licensee to comply with the terms,


conditions, and specifications of the CoC, in this case                       limited to past and specific                                                                                         future
conditions, and specifications of the CoC, in this case limited to past and specific future


7 loadings                                                               of baskets with the CBS                                                       variant design, would                     not significantly impact the
7 loadings of baskets with the CBS variant design, would not significantly impact the


quality of the human environment. Accordingly, the NRC has determined that a FONSI is
quality of the human environment. Accordingly, the NRC has determined that a FONSI is
Line 375: Line 374:
persons through ADAMS, as indicated.
persons through ADAMS, as indicated.


Document Description                             ADAMS Accession No. or Federal Register notice Constellations request for   exemption   , dated                     ML24082A008 March   22, 2024.
Document Description ADAMS Accession No. or Federal Register notice Constellations request for exemption, dated ML24082A008 March 22, 2024.
Certificate of Compliance No. 1032, Amendment 1,                 ML15152A358 (Package)
Certificate of Compliance No. 1032, Amendment 1, ML15152A358 (Package)
Revision 1, dated May 29, 2015.
Revision 1, dated May 29, 2015.
Holtec International, Inc. -   Notice of Violation; The U.S. Nuclear Regulatory Commission Inspection                           ML24016A190 Report No. 07201014/2022-                                           201, EA-                                                   23-                                           044, dated January 30, 2024.
Holtec International, Inc. - Notice of Violation; The U.S. Nuclear Regulatory Commission Inspection ML24016A190 Report No. 07201014/2022-201, EA-23- 044, dated January 30, 2024.
10 CFR part 72 amendment to allow spent fuel storage in NRC-approved casks, dated                                     55 FR 29181 July 18, 1990.
10 CFR part 72 amendment to allow spent fuel storage in NRC-approved casks, dated 55 FR 29181 July 18, 1990.
EA for part 72 amendment to allow spent fuel                           ML051230231 storage in NRC-approved casks, March 8, 1989           .
EA for part 72 amendment to allow spent fuel ML051230231 storage in NRC-approved casks, March 8, 1989.
Final rule for List of Approved Spent Fuel Storage Casks: Holtec HI-STORM FW System CoC No.                                 80 FR 14291 1032,                                                                                         Amendment No. 1, Revision No. 1, dated March 19, 2015   .
Final rule for List of Approved Spent Fuel Storage Casks: Holtec HI-STORM FW System CoC No. 80 FR 14291 1032, Amendment No. 1, Revision No. 1, dated March 19, 2015.
Safety Determination of a Potential Structural Failure of the Fuel Basket During Accident Conditions for the HI-STORM 100 and HI-STORM                           ML24018A085 Flood/Wind Dry Cask Storage Systems, dated January 31, 2024.
Safety Determination of a Potential Structural Failure of the Fuel Basket During Accident Conditions for the HI-STORM 100 and HI-STORM ML24018A085 Flood/Wind Dry Cask Storage Systems, dated January 31, 2024.
NRC email to MDNR regarding the         review of EA/FONSI for CCNPP             Exemption,       dated                   ML24131A121 April 29, 2024.
NRC email to MDNR regarding the review of EA/FONSI for CCNPP Exemption, dated ML24131A121 April 29, 2024.


8 MDNRs email response regarding EA/FONSI for                                               ML24131A120 CCNPP Exemption, dated May 9, 2024.
8 MDNRs email response regarding EA/FONSI for ML24131A120 CCNPP Exemption, dated May 9, 2024.


Dated: May 14,                                           2024                                                                 .
Dated: May 14, 2024.


For the Nuclear Regulatory Commission.
For the Nuclear Regulatory Commission.


                                                                /RA/
/RA/


Bernard H. White, Acting Chief, Storage and Transportation                                           Licensing Branch                     ,
Bernard H. White, Acting Chief, Storage and Transportation Licensing Branch,
Division of Fuel Management, Office of Nuclear Material Safety and Safeguards                     .
Division of Fuel Management, Office of Nuclear Material Safety and Safeguards.


9}}
9}}

Latest revision as of 17:32, 4 October 2024

FRN - Notice of Availability of EA-FONSI for Calvert Cliffs
ML24109A167
Person / Time
Site: 07200078, Calvert Cliffs
Issue date: 05/14/2024
From: Bernie White
Storage and Transportation Licensing Branch
To:
Constellation Energy Generation
Shared Package
ML24108A129 List:
References
89 FR 43878, NRC-2024-0085
Download: ML24109A167 (1)


Text

[7590- 01-P]

NUCLEAR REGULATORY COMMISSION

[Docket Nos. 72-78, 50- 317, and 50- 318; NRC-2024- 0085]

Constellation Energy Generation, LLC.;

Calvert Cliffs Nuclear Power Plant, Units 1 and 2;

Independent Spent Fuel Storage Installation;

Environmental Assessment and Finding of No Significant Impact

AGENCY: Nuclear Regulatory Commission.

ACTION: Notice; issuance.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) is issuing an

environmental assessment (EA) and a finding of no significant impact (FONSI) for an

exemption request submitted by Constellation Energy Generation, LLC (Constellation)

that would permit Calvert Cliffs Nuclear Power Plant (CCNPP) to maintain nine loaded

and to load six new 37 multi-purpose canisters (MPC) with continuous basket shims

(CBS) in the HI-STORM Flood/Wind (FW) MPC Storage System at its CCNPP Units 1

and 2 Independent Spent Fuel Storage Installation (ISFSI) in a storage condition where

the terms, conditions, and specifications in the Certificate of Compliance (CoC) No.

1032, Amendment No. 1, Revision No. 1, are not met.

DATES: The EA and FONSI referenced in this document are available on May 20, 2024.

ADDRESSES: Please refer to Docket ID NRC-2024- 0085 when contacting the NRC

about the availability of information regarding this document. You may obtain publicly

available information related to this document using any of the following methods:

search for Docket ID NRC-2024- 0085. Address questions about D ocket IDs in

Regulations.gov to Stacy Schumann; telephone: 301-415- 0624; email:

Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the

For Further Information Contact section of this document.

  • NRCs Agencywide Documents Access and Management System

(ADAMS): You may obtain publicly available documents online in the ADAMS Public

Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the

search, select Begin Web-based ADAMS Search. For problems with ADAMS, please

contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, at

301-415-4737, or by email to PDR. Resource@nrc.gov. For the convenience of the

reader, instructions about obtaining materials referenced in this document are provided

in the Availability of Documents section.

  • NRCs PDR: The PDR, where you may examine and order copies of publicly

available documents, is open by appointment. To make an appointment to visit the PDR,

please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-

4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except

Federal holidays.

FOR FURTHER INFORMATION CONTACT: Yen-Ju Chen, Office of Nuclear Material

Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555;

telephone: 301-415-1018; email: Yen-Ju.Chen@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Introduction

The NRC is reviewing an exemption request from Constellation, dated

March 22, 2024. Constellation is requesting an exemption pursuant to section 72.7 of

title 10 of the Code of Federal Regulations (10 CFR), in paragraphs 72.212(a)(2),

72.212(b)(3), 72.212(b)(5)(i), 72.212(b)(11), and 72.214 that require Constellation to

comply with the terms, conditions, and specifications of the C oC No. 1032, Amendment

2 No. 1, Revision No. 1. If approved, the exemption would allow Constellation to maintain

nine loaded and to load six new MPC CBS in the HI-STORM FW MPC Storage

System at the CCNPP ISFSI in a storage condition where the terms, conditions, and

specifications in the CoC No. 1032, Amendment No. 1, Revision No. 1, are not met.

II. Environmental Assessment

=

Background===

CCNPP is located near Maryland Highway 2 -4 in Calvert County on the west

bank of the Chesapeake Bay, approximately halfway between the mouth of the

Chesapeake Bay and its headwaters at the Susquehanna River. Unit 1 began operating

in 1975 and Unit 2 began operating in 1977. Constellation has been storing spent fuel in

an ISFSI at CCNPP under a general license as authorized by 10 CFR p art 72, subpart

K, General License for Storage of Spent Fuel at Power Reactor Sites. Constellation

currently uses the HI -STORM FW MPC Storage System under CoC No. 1032,

Amendment No. 1, Revision No. 1, for dry storage of spent nuclear fuel in a specific

MPC (i.e., MPC-37) at the CCNPP ISFSI.

Description of the Proposed Action

The CoC is the NRC approved design for each dry cask storage system. The

proposed action would exempt the applicant from the requirements of

10 CFR 72.212(a)(2), 72.212(b)(3), 72.212(b)(5)(i), 72.212(b)(11), and 72.214 only as

these requirements pertain to the use of the MPC CBS in the HI-STORM FW MPC

Storage System for the already loaded systems and the near-term planned loading of

the canisters. The exemption would allow Constellation to maintain nine loaded and to

load six new MPC CBS in the HI-STORM FW MPC Storage System at the CCNPP

ISFSI, despite the MPC CBS in the HI-STORM FW MPC Storage System not being

3 in compliance with the terms, conditions, and specifications in the CoC No. 1032,

Amendment No. 1, Revision No. 1.

The HI-STORM FW MPC Storage System CoC provides the requirements,

conditions, and operating limits necessary for use of the system to store spent fuel.

Holtec International (Holtec), the designer and manufacturer of the HI -STORM FW MPC

Storage System, developed a variant of the design with CBS for the MPC-37, known as

MPC CBS. Holtec originally implemented the CBS variant design under the

provisions of 10 CFR 72.48, which allows licensees to make changes to cask designs

without a CoC amendment under certain conditions (listed in 10 CFR 72.48(c)). After

evaluating the specific changes to the cask designs, the NRC determined that Holtec

erred when it implemented the CBS variant design under 10 CFR 72.48, as this was not

the type of change allowed without a CoC amendment. For this reason, the NRC issued

three Severity Level IV violations to Holtec. Prior to the issuance of the violations,

Constellation had already loaded nine MPC CBS in a HI -STORM FW MPC Storage

System, which are safely in storage on the CCNPP ISFSI pad. Additionally,

Constellation plans to load six new MPC-37-CBS in the HI -STORM FW MPC Storage

System beginning in July 2024. This exemption considers the loading of the nine already

loaded systems and the near-term planned loading of the six canisters with the CBS

variant basket design.

Need for the Proposed Action

Constellation requested this exemption because Constellation is currently out of

compliance with NRC requirements, resulting from the previous loading of spent fuel into

a storage system with the CBS variant basket design. This exemption would allow nine

already loaded MPC CBS in the HI -STORM FW MPC Storage System to remain in

storage at the CCNPP ISFSI. The applicant also requested the exemption in order to

4 allow CCNPP to load six new MPC-37-CBS in HI -STORM FW MPC Storage System at

the CCNPP ISFSI for the future loading campaign beginning in July 2024.

Approval of the exemption request would allow Constellation to effectively

manage the spent fuel pool margin and capacity to enable refueling and offloading fuel

from the reactor. It would also allow Constellation to effectively manage the availability of

the specialized workforce and equipment needed to support competing fuel loading and

operational activities at CCNPP and other Constellation sites.

Environmental Impacts of the Proposed Action

This EA evaluates the potential environmental impacts of granting an exemption

from the terms, conditions, and specifications in CoC No. 1032, Amendment No. 1,

Revision No. 1. The exemption would allow nine loaded MPC-37-CBS in the HI-STORM

FW MPC Storage System to remain loaded at the CCNPP ISFSI. The exemption also

would allow a near -term loading of six new MPC-37-CBS to be loaded in the HI -STORM

FW MPC Storage System and maintained in storage at the CCNPP ISFSI.

The potential environmental impacts of storing spent nuclear fuel in

NRC-approved storage systems have been documented in previous assessments. On

July 18, 1990, the NRC amended 10 CFR part 72 to provide for the storage of spent fuel

under a general license in cask designs approved by the NRC. The EA for the 1990 final

rule analyzed the potential environmental impacts of using NRC-approved storage

casks. The EA for the HI-STORM FW MPC Storage System, CoC No. 1032,

Amendment No. 1, Revision No. 1,, published in 2015, tiers off of the EA issued for the

July 18, 1990, final rule. Tiering off earlier EAs is a standard process encouraged by

the regulations implementing the National Environmental Policy Act of 1969 (NEPA) that

entails the use of impact analyses of previous EAs to bound the impacts of a proposed

action where appropriate. The Holtec HI -STORM FW MPC Storage System is designed

5 to mitigate the effects of design basis accidents that could occur during storage.

Considering the specific design requirements for the accident conditions, the design of

the cask would prevent loss of containment, shielding, and criticality control. If there is

no loss of containment, shielding, or criticality control, the environmental impacts would

not be significant.

The exemptions requested by Constellation at the CCNPP site as they relate to

CoC No. 1032, Amendment No. 1, Revision No. 1, for the HI -STORM FW MPC Storage

System are limited to the use of the CBS variant basket design only for the already

loaded nine canisters and near-term planned loading of six canisters utilizing the CBS

variant basket design. The staff has determined that this change in the basket will not

result in either radiological or non-radiological environmental impacts that significantly

differ from the environmental impacts evaluated in the EA supporting the issuance of

CoC No. 1032, Amendment No. 1, Revision No. 1. If the exemption is granted, there will

be no significant change in the types or amounts of any effluents released, no significant

increase in individual or cumulative public or occupational radiation exposure, and no

significant increase in the potential for or consequences from radiological accidents.

Accordingly, the Commission concludes that there would be no significant environmental

impacts associated with the proposed action.

Alternative to the Proposed Action

The staff considered the no-action alternative. The no -action alternative (denial of

the exemption request) would require Constellation to unload spent fuel from the MPC-

37-CBS in the HI-STORM FW MPC Storage System to bring it in compliance with the

CoC terms, conditions, and specifications in the CoC No. 1032, Amendment No. 1,

Revision No. 1. Unloading the cask would subject station personnel to additional

radiation exposure, generate additional contaminated waste, increase the risk of a

6 possible fuel handling accident, and increase the risk of a possible heavy load handling

accident. Furthermore, the removed spent fuel would need to be placed in the spent fuel

pool, where it would remain until approved storage casks can be fabricated and

delivered to site for loading. Delay in the loading of this spent fuel into other casks, as

well as not allowing the planned future loading campaign, could affect Constellations

ability to effectively manage the spent fuel pool capacity, reactor fuel offloading, and

refueling. It could also pose challenges to spent fuel heat removal and impact the

availability of the specialized workforce and equipment needed to support competing fuel

loading and operational activities at CCNPP and other Constellation sites. The NRC has

determined that the no-action alternative would result in undue potential human health

and safety impacts that could be avoided by proceeding with the proposed exemption,

especially given that the staff has concluded in NRCs Safety Determination

Memorandum, issued with respect to the enforcement action against Holtec regarding

these violations, that fuel can be stored safety in the MPC CBS canisters.

Agencies Consulted

The NRC provided the Maryland Department of Natural Resources (MDNR) a

copy of this draft EA for review by an email dated April 29, 2024. On May 9, 2024,

MDNR provided its concurrence by email.

III. Finding of No Significant Impact

The environmental impacts of the proposed action have been reviewed in

accordance with the requirements in 10 CFR part 51, which implement NEPA. Based

upon the foregoing EA, the NRC finds that the proposed action of granting the

exemption from the regulations in 10 CFR 72.212(a)(2), 72.212(b)(3), 72.212(b)(5)(i),

72.212(b)(11) and 72.214, which require the licensee to comply with the terms,

conditions, and specifications of the CoC, in this case limited to past and specific future

7 loadings of baskets with the CBS variant design, would not significantly impact the

quality of the human environment. Accordingly, the NRC has determined that a FONSI is

appropriate, and an environmental impact statement is not warranted.

IV. Availability of Documents

The documents identified in the following table are available to interested

persons through ADAMS, as indicated.

Document Description ADAMS Accession No. or Federal Register notice Constellations request for exemption, dated ML24082A008 March 22, 2024.

Certificate of Compliance No. 1032, Amendment 1, ML15152A358 (Package)

Revision 1, dated May 29, 2015.

Holtec International, Inc. - Notice of Violation; The U.S. Nuclear Regulatory Commission Inspection ML24016A190 Report No. 07201014/2022-201, EA-23- 044, dated January 30, 2024.

10 CFR part 72 amendment to allow spent fuel storage in NRC-approved casks, dated 55 FR 29181 July 18, 1990.

EA for part 72 amendment to allow spent fuel ML051230231 storage in NRC-approved casks, March 8, 1989.

Final rule for List of Approved Spent Fuel Storage Casks: Holtec HI-STORM FW System CoC No. 80 FR 14291 1032, Amendment No. 1, Revision No. 1, dated March 19, 2015.

Safety Determination of a Potential Structural Failure of the Fuel Basket During Accident Conditions for the HI-STORM 100 and HI-STORM ML24018A085 Flood/Wind Dry Cask Storage Systems, dated January 31, 2024.

NRC email to MDNR regarding the review of EA/FONSI for CCNPP Exemption, dated ML24131A121 April 29, 2024.

8 MDNRs email response regarding EA/FONSI for ML24131A120 CCNPP Exemption, dated May 9, 2024.

Dated: May 14, 2024.

For the Nuclear Regulatory Commission.

/RA/

Bernard H. White, Acting Chief, Storage and Transportation Licensing Branch,

Division of Fuel Management, Office of Nuclear Material Safety and Safeguards.

9