FEB 211990 | |||
' | |||
Docket No. 50-245 | |||
Northeast Nuclear Energy Company | |||
ATTN: Mr. Edward J. Mroczka | |||
Senior Vice President - Nuclear | |||
Engineering and Operations Group | |||
~P.O. Box 270 | |||
Hartford, Connecticut 06101 - 0270 | |||
Dear Mr. Mroczka: | |||
SUBJECT: EMERGENCY OPERATING PROCEDURES AND POWER OSCILLATION INSPECTION | |||
(INSPECTION REPORT NO.- 50-245/89-19) | |||
Thi; letter forwards the results and conclusions of an inspection conducted | |||
October 23 - 27,"1989, at Millstone Unit 1, regarding the implementation of the | |||
Emergency Operating Procedures (EOP)<and.your response to NRC Bulletin No. | |||
88-07 and Supplement 1, Power Level Oscillations. | |||
Your attention is directed to sections 3 and 4 of the report concerning the | |||
technical deviations and deficiencies discussed during the inspection of the | |||
Emergency Operating Procedures (EOPs). | |||
The technical deviations from the BWR | |||
Owner's Group (BWROG) Emergency Procedures Guidelines (EPG) (which were | |||
previously accepted by an NRC staff safety evaluation report) appear to be | |||
' | |||
incompletely evaluated in the licensee's deviation document to justify differ- | |||
ences between the EPG and the Plant Specific Technical Guidelines (PSTG). | |||
Further, some of the deficiencies noted in this inspection, especially in the | |||
area of human. factors appear to be repetitive of previous inspection findings | |||
, | |||
in the E0P area. | |||
-We plan.to discuss these issues with your staff at a management meeting | |||
scheduled for March 1, 1990 in the Region I office. We note that your staff | |||
" | |||
agreed to review these matters but did not provide dates when these actioni, | |||
will be complete. At the meeting noted above, your staff should be prepared to | |||
' | |||
address dispositions and completion dates for these actions. | |||
Inaccordancewith10CFR2.790oftheCommission'sregulations,acopyofthhs | |||
^ | |||
letter and the enclosed inspection report will be placed in the NRC Public | |||
.- | |||
Document Room. | |||
No reply to this letter is required. | |||
- | |||
Sincerely, | |||
"' | |||
Original Signed By: | |||
Marvin W. Hodges | |||
Robert M. Gallo, Chief | |||
Operations Branch | |||
9003020076 +00m1 | |||
p | |||
Division of Reactor Safety | |||
PDR | |||
ADOCK 03000245 " EJ | |||
/, ()\\ | |||
% | |||
.-O | |||
P.JC | |||
\\ | |||
i, | |||
(\\/ | |||
+ | |||
9 | |||
, | |||
\\ | |||
. _ . _ _ _ _ _ _ - _ _ _ _ _ - - - _ _ - - - | |||
. , . . - . . . | |||
' | |||
' - - - - - - - - | |||
- - - - | |||
's | |||
. | |||
. | |||
Northeast Nuclear Energy Company | |||
2 | |||
* | |||
. | |||
_ | |||
, | |||
-- | |||
Enclosure: NRC Inspection Report 50-245/89-19 | |||
cc w/ enc 1: | |||
W. D. Romberg, Vice President, Nuclear Operations | |||
S. E. Scace, Station Superintendent | |||
D. O. Nordquist, Director of Quality Services | |||
R. M. Kacich, Manager, Generation Facilities Licensing | |||
- | |||
D. B. Miller, Station Superintendent, Haddam Neck | |||
Gerald Garfield, Esquire | |||
Public Document Room (PDR) | |||
Local Public Document Room (LPDR) | |||
Nuclear Safety Information Center (NSIC) | |||
NRC Resident inspector | |||
State of Connecticut | |||
- | |||
bec w/ enc 1: | |||
. | |||
Region I Document Room (with concurrences) | |||
Management Assistant, DRMA (w/o enc 1) | |||
_ | |||
A. Sutthoff, Human Factors Specialist, NRR | |||
G. Galletti Human Factors Specialist, NRR | |||
R. Conte, DRS | |||
C. Sisco, DRS | |||
DRP Section Chief | |||
"" | |||
W. Raymond, SRI, Millstone | |||
M. Boyle, LPM, NRR | |||
J. Shediosky, SRI, Haddam Neck | |||
DRS Files (3) | |||
L | |||
l | |||
p t:: | |||
DRS:RI | |||
DRS:RI | |||
DRS:RI | |||
Sisco/ces/ajk/dmg | |||
Conte | |||
Gallo | |||
02/13/90 | |||
02 | |||
02/gl/90 | |||
- | |||
th sf. | |||
- | |||
J | |||
T@ | |||
Pt ,' | |||
___ | |||
t o/ | |||
_-. | |||
U- | |||
OFFICIAL RECORD COPY | |||
SISC0/E0P/2/6/90 - 0001.1.0 | |||
02/06/90 | |||
v | |||
- | |||
_, | |||
. | |||
. | |||
. | |||
.. . | |||
_ | |||
}} | }} | ||
Latest revision as of 15:32, 17 December 2024
| ML20055C314 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/21/1990 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20055C315 | List: |
| References | |
| NUDOCS 9003020076 | |
| Download: ML20055C314 (2) | |
See also: IR 05000245/1989019
Text
p
,
i
1
<
p
<
c
- .
<
.
.
L
FEB 211990
'
Docket No. 50-245
Northeast Nuclear Energy Company
ATTN: Mr. Edward J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group
~P.O. Box 270
Hartford, Connecticut 06101 - 0270
Dear Mr. Mroczka:
SUBJECT: EMERGENCY OPERATING PROCEDURES AND POWER OSCILLATION INSPECTION
(INSPECTION REPORT NO.- 50-245/89-19)
Thi; letter forwards the results and conclusions of an inspection conducted
October 23 - 27,"1989, at Millstone Unit 1, regarding the implementation of the
Emergency Operating Procedures (EOP)<and.your response to NRC Bulletin No.
88-07 and Supplement 1, Power Level Oscillations.
Your attention is directed to sections 3 and 4 of the report concerning the
technical deviations and deficiencies discussed during the inspection of the
Emergency Operating Procedures (EOPs).
The technical deviations from the BWR
Owner's Group (BWROG) Emergency Procedures Guidelines (EPG) (which were
previously accepted by an NRC staff safety evaluation report) appear to be
'
incompletely evaluated in the licensee's deviation document to justify differ-
ences between the EPG and the Plant Specific Technical Guidelines (PSTG).
Further, some of the deficiencies noted in this inspection, especially in the
area of human. factors appear to be repetitive of previous inspection findings
,
in the E0P area.
-We plan.to discuss these issues with your staff at a management meeting
scheduled for March 1, 1990 in the Region I office. We note that your staff
"
agreed to review these matters but did not provide dates when these actioni,
will be complete. At the meeting noted above, your staff should be prepared to
'
address dispositions and completion dates for these actions.
Inaccordancewith10CFR2.790oftheCommission'sregulations,acopyofthhs
^
letter and the enclosed inspection report will be placed in the NRC Public
.-
Document Room.
No reply to this letter is required.
-
Sincerely,
"'
Original Signed By:
Marvin W. Hodges
Robert M. Gallo, Chief
Operations Branch
9003020076 +00m1
p
Division of Reactor Safety
ADOCK 03000245 " EJ
/, ()\\
%
.-O
P.JC
\\
i,
(\\/
+
9
,
\\
. _ . _ _ _ _ _ _ - _ _ _ _ _ - - - _ _ - - -
. , . . - . . .
'
' - - - - - - - -
- - - -
's
.
.
Northeast Nuclear Energy Company
2
.
_
,
--
Enclosure: NRC Inspection Report 50-245/89-19
cc w/ enc 1:
W. D. Romberg, Vice President, Nuclear Operations
S. E. Scace, Station Superintendent
D. O. Nordquist, Director of Quality Services
R. M. Kacich, Manager, Generation Facilities Licensing
-
D. B. Miller, Station Superintendent, Haddam Neck
Gerald Garfield, Esquire
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident inspector
State of Connecticut
-
bec w/ enc 1:
.
Region I Document Room (with concurrences)
Management Assistant, DRMA (w/o enc 1)
_
A. Sutthoff, Human Factors Specialist, NRR
G. Galletti Human Factors Specialist, NRR
R. Conte, DRS
C. Sisco, DRS
DRP Section Chief
""
W. Raymond, SRI, Millstone
M. Boyle, LPM, NRR
J. Shediosky, SRI, Haddam Neck
DRS Files (3)
L
l
p t::
DRS:RI
DRS:RI
DRS:RI
Sisco/ces/ajk/dmg
Conte
Gallo
02/13/90
02
02/gl/90
-
th sf.
-
J
T@
Pt ,'
___
t o/
_-.
U-
OFFICIAL RECORD COPY
SISC0/E0P/2/6/90 - 0001.1.0
02/06/90
v
-
_,
.
.
.
.. .
_