ML20057D108: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot change |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:, | {{#Wiki_filter:, | ||
GE Nuclear Energy September 30,1993 MFN No.155-93 Docket STN 52 004 | GE Nuclear Energy September 30,1993 MFN No.155-93 Docket STN 52 004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: | ||
Richard Borchardt, Acting Director Standardization Project Directorate | |||
Attention: | |||
==Subject:== | ==Subject:== | ||
Submittal of GE Analysis Report (NEDO-32246) for Review and | Submittal of GE Analysis Report (NEDO-32246) for Review and Acceptance for Referencing j | ||
==Dear Mr. Borchardt,== | ==Dear Mr. Borchardt,== | ||
GE Nuclear Energy is submitting, for review and approval for referencing in licensing actions, GE analysis report NEDO-32246, Geysering Instability Study for the SBMR, September 1993. | GE Nuclear Energy is submitting, for review and approval for referencing in licensing actions, GE analysis report NEDO-32246, Geysering Instability Study for the SBMR, September 1993. | ||
Three (3) hard copies are enclosed. | Three (3) hard copies are enclosed. | ||
Sincerely, n | Sincerely, n | ||
/ | |||
N' P.W. Marriott | N' P.W. Marriott SBWR Project Manager M/C 781, (408) 925-6948 I | ||
Melinda Malloy (NRC) | |||
) | |||
Larry E. Phillips (NRC) i | cc: | ||
Larry E. Phillips (NRC) i 1 | |||
+, ' Ds 'y | |||
[ | |||
9310010117 930930 | n 010015 T3) 9310010117 930930 I | ||
TOPRP EMVGENE | PDR TOPRP EMVGENE | ||
? | |||
i C | |||
PDR | |||
.}} | |||
Latest revision as of 11:56, 17 December 2024
| ML20057D108 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 09/30/1993 |
| From: | Marriott P GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20057D109 | List: |
| References | |
| MFN-155-93, NUDOCS 9310010117 | |
| Download: ML20057D108 (1) | |
Text
,
GE Nuclear Energy September 30,1993 MFN No.155-93 Docket STN 52 004 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Richard Borchardt, Acting Director Standardization Project Directorate
Subject:
Submittal of GE Analysis Report (NEDO-32246) for Review and Acceptance for Referencing j
Dear Mr. Borchardt,
GE Nuclear Energy is submitting, for review and approval for referencing in licensing actions, GE analysis report NEDO-32246, Geysering Instability Study for the SBMR, September 1993.
Three (3) hard copies are enclosed.
Sincerely, n
/
N' P.W. Marriott SBWR Project Manager M/C 781, (408) 925-6948 I
Melinda Malloy (NRC)
)
cc:
Larry E. Phillips (NRC) i 1
+, ' Ds 'y
[
n 010015 T3) 9310010117 930930 I
PDR TOPRP EMVGENE
?
i C
.