ML20249A689: Difference between revisions

From kanterella
Jump to navigation Jump to search
StriderTol Bot insert
 
StriderTol Bot change
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:- _ - -.
SDT BYrWESTINGHOUSE - CNFD
: 6-15-88 : 15:52 : WESTINGliOUSE - CN&
l#8/lidE
:# 1/ 2 m
b h,! jhf Westinghouse Electric Corporation P. O. Drewer R Columbia, SC 29250 l
Far Cover Sheet DATE:
/I JUAl Y8 TIMC:
3!30 /s TO:
0W121 $^W20 (AldCi PHONE:
(300 4/f~Ollie FAK:
(2nd 416 - 5390 l
FROM:
Robert A. Wlhems -
PHONE:
(803) 776-2610, Ext. 3393 or WIN 4393 Regulatory ANairs FAX:
(803) 695-3964 RE:
Z'AlfEn/T TO CHAn/dd LICEAlff Aa/Jrx CC:
\\s/lLGud C6*Ddin) ( WArjrin/4it* W 9)
Number of pages including cover sheet: 2 Message
$tt'.4trWett Eb.
D
/
I y;3 (U
"~
9806180102 990615 PDR ADOCK 07001151 l
C PDR j
i a
 
SIDT BY4ESTINGH0l'SE - CNFD
: 6-15-88 ; 15:52 ; WESTINGHOUSE - CNFD-
;c 2/ 2 r-INTENT TO CIIANGE LICENSE ANNEX On June 13, 1998, Westinghouse Columbia Fuel Fabrication Facility (CFFF) Regulatory Management approved a project that will require a change to the License Armex submitted in support of the Plant Ventilation System Integrated Safety Assessment.
j Project DescIjp.LiCD Replace filter housing for the Fluoride Stripping System ventilation filter and modify ducting to mate up with the new filter house. Install a new automatic flow valve and field temperature indicator in the liquid circulation loop. Add a high level deionized water and ammonia supply interlock cut-off.
Reculatory Review Radiological and Environmental Protection: Review complete.
Chemical and Fire Safety: Review complete.
Nuclear Criticality Safety and Safeguards: Further evaluation required. Drawing sign-off prior to start-up required.
Necessary changed pages to the License Annex for the Plant Ventilation System will be submitted on or before July 13. 1998.
Robert A. Williams Licensing Project Manager i
Westinghouse Columbia Plant
\\
_-_______ _ _ _}}

Latest revision as of 12:33, 16 March 2025

Submits Intent to Change License Annex.Necessary Changed Pages to License Annex for Plant Ventilation Sys Will Be Submitted on or Before 980713
ML20249A689
Person / Time
Site: Westinghouse
Issue date: 06/15/1998
From: Robert Williams
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Gaskin C
NRC
References
NUDOCS 9806180102
Download: ML20249A689 (2)


Text

- _ - -.

SDT BYrWESTINGHOUSE - CNFD

6-15-88 : 15:52 : WESTINGliOUSE - CN&

l#8/lidE

  1. 1/ 2 m

b h,! jhf Westinghouse Electric Corporation P. O. Drewer R Columbia, SC 29250 l

Far Cover Sheet DATE:

/I JUAl Y8 TIMC:

3!30 /s TO:

0W121 $^W20 (AldCi PHONE:

(300 4/f~Ollie FAK:

(2nd 416 - 5390 l

FROM:

Robert A. Wlhems -

PHONE:

(803) 776-2610, Ext. 3393 or WIN 4393 Regulatory ANairs FAX:

(803) 695-3964 RE:

Z'AlfEn/T TO CHAn/dd LICEAlff Aa/Jrx CC:

\\s/lLGud C6*Ddin) ( WArjrin/4it* W 9)

Number of pages including cover sheet: 2 Message

$tt'.4trWett Eb.

D

/

I y;3 (U

"~

9806180102 990615 PDR ADOCK 07001151 l

C PDR j

i a

SIDT BY4ESTINGH0l'SE - CNFD

6-15-88 ; 15:52 ; WESTINGHOUSE - CNFD-
c 2/ 2 r-INTENT TO CIIANGE LICENSE ANNEX On June 13, 1998, Westinghouse Columbia Fuel Fabrication Facility (CFFF) Regulatory Management approved a project that will require a change to the License Armex submitted in support of the Plant Ventilation System Integrated Safety Assessment.

j Project DescIjp.LiCD Replace filter housing for the Fluoride Stripping System ventilation filter and modify ducting to mate up with the new filter house. Install a new automatic flow valve and field temperature indicator in the liquid circulation loop. Add a high level deionized water and ammonia supply interlock cut-off.

Reculatory Review Radiological and Environmental Protection: Review complete.

Chemical and Fire Safety: Review complete.

Nuclear Criticality Safety and Safeguards: Further evaluation required. Drawing sign-off prior to start-up required.

Necessary changed pages to the License Annex for the Plant Ventilation System will be submitted on or before July 13. 1998.

Robert A. Williams Licensing Project Manager i

Westinghouse Columbia Plant

\\

_-_______ _ _ _