ML20249A689: Difference between revisions
StriderTol (talk | contribs) StriderTol Bot insert |
StriderTol (talk | contribs) StriderTol Bot change |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:- _ - -. | ||
SDT BYrWESTINGHOUSE - CNFD | |||
: 6-15-88 : 15:52 : WESTINGliOUSE - CN& | |||
l#8/lidE | |||
:# 1/ 2 m | |||
b h,! jhf Westinghouse Electric Corporation P. O. Drewer R Columbia, SC 29250 l | |||
Far Cover Sheet DATE: | |||
/I JUAl Y8 TIMC: | |||
3!30 /s TO: | |||
0W121 $^W20 (AldCi PHONE: | |||
(300 4/f~Ollie FAK: | |||
(2nd 416 - 5390 l | |||
FROM: | |||
Robert A. Wlhems - | |||
PHONE: | |||
(803) 776-2610, Ext. 3393 or WIN 4393 Regulatory ANairs FAX: | |||
(803) 695-3964 RE: | |||
Z'AlfEn/T TO CHAn/dd LICEAlff Aa/Jrx CC: | |||
\\s/lLGud C6*Ddin) ( WArjrin/4it* W 9) | |||
Number of pages including cover sheet: 2 Message | |||
$tt'.4trWett Eb. | |||
D | |||
/ | |||
I y;3 (U | |||
"~ | |||
9806180102 990615 PDR ADOCK 07001151 l | |||
C PDR j | |||
i a | |||
SIDT BY4ESTINGH0l'SE - CNFD | |||
: 6-15-88 ; 15:52 ; WESTINGHOUSE - CNFD- | |||
;c 2/ 2 r-INTENT TO CIIANGE LICENSE ANNEX On June 13, 1998, Westinghouse Columbia Fuel Fabrication Facility (CFFF) Regulatory Management approved a project that will require a change to the License Armex submitted in support of the Plant Ventilation System Integrated Safety Assessment. | |||
j Project DescIjp.LiCD Replace filter housing for the Fluoride Stripping System ventilation filter and modify ducting to mate up with the new filter house. Install a new automatic flow valve and field temperature indicator in the liquid circulation loop. Add a high level deionized water and ammonia supply interlock cut-off. | |||
Reculatory Review Radiological and Environmental Protection: Review complete. | |||
Chemical and Fire Safety: Review complete. | |||
Nuclear Criticality Safety and Safeguards: Further evaluation required. Drawing sign-off prior to start-up required. | |||
Necessary changed pages to the License Annex for the Plant Ventilation System will be submitted on or before July 13. 1998. | |||
Robert A. Williams Licensing Project Manager i | |||
Westinghouse Columbia Plant | |||
\\ | |||
_-_______ _ _ _}} | |||
Latest revision as of 12:33, 16 March 2025
| ML20249A689 | |
| Person / Time | |
|---|---|
| Site: | Westinghouse |
| Issue date: | 06/15/1998 |
| From: | Robert Williams WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| To: | Gaskin C NRC |
| References | |
| NUDOCS 9806180102 | |
| Download: ML20249A689 (2) | |
Text
- _ - -.
SDT BYrWESTINGHOUSE - CNFD
- 6-15-88 : 15:52 : WESTINGliOUSE - CN&
l#8/lidE
- 1/ 2 m
b h,! jhf Westinghouse Electric Corporation P. O. Drewer R Columbia, SC 29250 l
Far Cover Sheet DATE:
/I JUAl Y8 TIMC:
3!30 /s TO:
0W121 $^W20 (AldCi PHONE:
(300 4/f~Ollie FAK:
(2nd 416 - 5390 l
FROM:
Robert A. Wlhems -
PHONE:
(803) 776-2610, Ext. 3393 or WIN 4393 Regulatory ANairs FAX:
(803) 695-3964 RE:
Z'AlfEn/T TO CHAn/dd LICEAlff Aa/Jrx CC:
\\s/lLGud C6*Ddin) ( WArjrin/4it* W 9)
Number of pages including cover sheet: 2 Message
$tt'.4trWett Eb.
D
/
I y;3 (U
"~
9806180102 990615 PDR ADOCK 07001151 l
C PDR j
i a
SIDT BY4ESTINGH0l'SE - CNFD
- 6-15-88 ; 15:52 ; WESTINGHOUSE - CNFD-
- c 2/ 2 r-INTENT TO CIIANGE LICENSE ANNEX On June 13, 1998, Westinghouse Columbia Fuel Fabrication Facility (CFFF) Regulatory Management approved a project that will require a change to the License Armex submitted in support of the Plant Ventilation System Integrated Safety Assessment.
j Project DescIjp.LiCD Replace filter housing for the Fluoride Stripping System ventilation filter and modify ducting to mate up with the new filter house. Install a new automatic flow valve and field temperature indicator in the liquid circulation loop. Add a high level deionized water and ammonia supply interlock cut-off.
Reculatory Review Radiological and Environmental Protection: Review complete.
Chemical and Fire Safety: Review complete.
Nuclear Criticality Safety and Safeguards: Further evaluation required. Drawing sign-off prior to start-up required.
Necessary changed pages to the License Annex for the Plant Ventilation System will be submitted on or before July 13. 1998.
Robert A. Williams Licensing Project Manager i
Westinghouse Columbia Plant
\\
_-_______ _ _ _