ML20249A689

From kanterella
Jump to navigation Jump to search
Submits Intent to Change License Annex.Necessary Changed Pages to License Annex for Plant Ventilation Sys Will Be Submitted on or Before 980713
ML20249A689
Person / Time
Site: Westinghouse
Issue date: 06/15/1998
From: Robert Williams
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Gaskin C
NRC
References
NUDOCS 9806180102
Download: ML20249A689 (2)


Text

- _ - -.

SDT BYrWESTINGHOUSE - CNFD

6-15-88 : 15:52 : WESTINGliOUSE - CN&

l#8/lidE

  1. 1/ 2 m

b h,! jhf Westinghouse Electric Corporation P. O. Drewer R Columbia, SC 29250 l

Far Cover Sheet DATE:

/I JUAl Y8 TIMC:

3!30 /s TO:

0W121 $^W20 (AldCi PHONE:

(300 4/f~Ollie FAK:

(2nd 416 - 5390 l

FROM:

Robert A. Wlhems -

PHONE:

(803) 776-2610, Ext. 3393 or WIN 4393 Regulatory ANairs FAX:

(803) 695-3964 RE:

Z'AlfEn/T TO CHAn/dd LICEAlff Aa/Jrx CC:

\\s/lLGud C6*Ddin) ( WArjrin/4it* W 9)

Number of pages including cover sheet: 2 Message

$tt'.4trWett Eb.

D

/

I y;3 (U

"~

9806180102 990615 PDR ADOCK 07001151 l

C PDR j

i a

SIDT BY4ESTINGH0l'SE - CNFD

6-15-88 ; 15:52 ; WESTINGHOUSE - CNFD-
c 2/ 2 r-INTENT TO CIIANGE LICENSE ANNEX On June 13, 1998, Westinghouse Columbia Fuel Fabrication Facility (CFFF) Regulatory Management approved a project that will require a change to the License Armex submitted in support of the Plant Ventilation System Integrated Safety Assessment.

j Project DescIjp.LiCD Replace filter housing for the Fluoride Stripping System ventilation filter and modify ducting to mate up with the new filter house. Install a new automatic flow valve and field temperature indicator in the liquid circulation loop. Add a high level deionized water and ammonia supply interlock cut-off.

Reculatory Review Radiological and Environmental Protection: Review complete.

Chemical and Fire Safety: Review complete.

Nuclear Criticality Safety and Safeguards: Further evaluation required. Drawing sign-off prior to start-up required.

Necessary changed pages to the License Annex for the Plant Ventilation System will be submitted on or before July 13. 1998.

Robert A. Williams Licensing Project Manager i

Westinghouse Columbia Plant

\\

_-_______ _ _ _